Free closeout checklist · Federal job · New York

Closeout checklist: Renovate Building 9, Bath VA Medical Center (U.S. Department of Veterans Affairs, NY)

Every closeout item we found in the public spec book for this job: 558 items across Division 01, 17 trade divisions, including 272 tests and certificates, 77 warranties and 68 O&M manual items. Each one is tied to its spec section and the PDF page it sits on.

Owner
U.S. Department of Veterans Affairs, Network Contracting Office 2
Number
Solicitation 36C24225B0006, VA project 528A6-20-633
Location
Bath, NY
Contract signed
2025-02-14
Public spec book
Solicitation notice on SAM.gov (spec book attached, marked public)
Spec book size
1,665 PDF pages
Checklist built
2026-10-21

Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.

What this job asks for at closeout

77Warranties
68O&M manuals
272Tests and certificates
65Training
60Record documents
9Spare parts
0Payment release
7Closeout steps

All 558 items, by trade

Division 01 General requirements 105 items

TypeItemSpec sectionPDF pageCopies / format
Record docsRecord docsThe contractor shall maintain two full size sets of as-built ...General Requirements01 00 00 1.11.A · PDF p. 23
Spec wording
“A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.”
01 00 00 1.11.A23two full size sets
Record docsRecord docsAll variations shall be shown in the same general detail ...General Requirements01 00 00 1.11.B · PDF p. 23
Spec wording
“B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.”
01 00 00 1.11.B23–
Record docsRecord docsContractor shall deliver two approved completed sets of as-built drawings ...General Requirements01 00 00 1.11.C · PDF p. 23
Spec wording
“C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.”
01 00 00 1.11.C23electronic version; PDF
Record docsRecord docsParagraphs A, B, & C shall also apply to all shop drawingsGeneral Requirements01 00 00 1.11.D · PDF p. 23
Spec wording
“D. Paragraphs A, B, & C shall also apply to all shop drawings.”
01 00 00 1.11.D23–
WarrantyWarrantyWarranty Management PlanGeneral Requirements01 00 00 1.12.A · PDF p. 23-25
Spec wording
“A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The ...”
01 00 00 1.12.A23-25one set; binder
WarrantyWarrantyPerformance & Payment BondsGeneral Requirements01 00 00 1.12.B · PDF p. 25-26
Spec wording
“B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period. 1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the ...”
01 00 00 1.12.B25-26–
WarrantyWarrantyPre-Warranty ConferenceGeneral Requirements01 00 00 1.12.C · PDF p. 26
Spec wording
“C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for ...”
01 00 00 1.12.C26–
WarrantyWarrantyContractor's Response to Construction Warranty Service Requirements:General Requirements01 00 00 1.12.D · PDF p. 26
Spec wording
“D. Contractor's Response to Construction Warranty Service Requirements:”
01 00 00 1.12.D26–
WarrantyWarrantyFollowing oral or written notification by the Contracting Officer, the ...General Requirements01 00 00 1.12.E · PDF p. 26-29
Spec wording
“E. Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the "Construction Warranty Service Priority List" and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date ...”
01 00 00 1.12.E26-29–
WarrantyWarrantyWarranty TagsGeneral Requirements01 00 00 1.12.F · PDF p. 29-30
Spec wording
“F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for ...”
01 00 00 1.12.F29-30–
O&MO&MContractor shall furnish Maintenance and Operating manuals (hard copies and ...General Requirements01 00 00 1.19.A · PDF p. 35
Spec wording
“A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.”
01 00 00 1.19.A35–
O&MO&MManualsGeneral Requirements01 00 00 1.19.B · PDF p. 35-36
Spec wording
“B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, ...”
01 00 00 1.19.B35-36four hard copies; one electronic copy
TrainingTrainingInstructionsGeneral Requirements01 00 00 1.19.C · PDF p. 36-37
Spec wording
“C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of ...”
01 00 00 1.19.C36-37–
O&MO&MSubmit data specified for a given item within 30 calendar ...Shop Drawings, Product Data, And Samples01 33 23 1.8.A · PDF p. 60
Spec wording
“A. Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.”
01 33 23 1.8.A60–
O&MO&MIn the event the Contractor fails to deliver O&M Data ...Shop Drawings, Product Data, And Samples01 33 23 1.8.B · PDF p. 60
Spec wording
“B. In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.”
01 33 23 1.8.B60–
TrainingTrainingThe designated Prime Contractor SSHO must meet the requirements of ...Safety Requirements01 35 26 1.8.A · PDF p. 75
Spec wording
“A. The designated Prime Contractor SSHO must meet the requirements of all applicable OSHA standards and be capable (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR 1926.16 and other appropriate Federal, State and local requirements are met for the project. As a minimum the SSHO must have completed the OSHA 30-hour Construction Safety class and have five (5) years of ...”
01 35 26 1.8.A75–
TrainingTrainingAll designated CPs shall have completed the OSHA 30-hour Construction ...Safety Requirements01 35 26 1.8.B · PDF p. 75
Spec wording
“B. All designated CPs shall have completed the OSHA 30-hour Construction Safety course within the past 5 years.”
01 35 26 1.8.B75–
TrainingTrainingIn addition to the OSHA 30 Hour Construction Safety Course, ...Safety Requirements01 35 26 1.8.C · PDF p. 75-76
Spec wording
“C. In addition to the OSHA 30 Hour Construction Safety Course, all CPs with high hazard work operations such as operations involving asbestos, electrical, cranes, demolition, work at heights/fall protection, fire safety/life safety, ladder, rigging, scaffolds, and trenches/excavations shall have a specialized formal course in the hazard recognition & control associated with those high hazard work operations. ...”
01 35 26 1.8.C75-76–
TrainingTrainingAll other construction workers shall have the OSHA 10-hour Construction ...Safety Requirements01 35 26 1.8.D · PDF p. 76
Spec wording
“D. All other construction workers shall have the OSHA 10-hour Construction Safety Outreach course and any necessary safety training to be able to identify hazards within their work environment.”
01 35 26 1.8.D76–
TrainingTrainingSubmit training records associated with the above training requirements to ...Safety Requirements01 35 26 1.8.E · PDF p. 76
Spec wording
“E. Submit training records associated with the above training requirements to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction conference for acceptance.”
01 35 26 1.8.E76–
TrainingTrainingPrior to any worker for the contractor or subcontractors beginning ...Safety Requirements01 35 26 1.8.F · PDF p. 76
Spec wording
“F. Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the SSHO or his/her designated representative. As a minimum, this briefing shall include information on the site-specific hazards, construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, emergency procedures, ...”
01 35 26 1.8.F76–
TrainingTrainingOngoing safety training will be accomplished in the form of ...Safety Requirements01 35 26 1.8.G · PDF p. 76
Spec wording
“G. Ongoing safety training will be accomplished in the form of weekly documented safety meeting.”
01 35 26 1.8.G76–
Test / cert.Test / cert.Government approval is required for all submittals. CQC inspection reports ...Quality Control01 45 00 1.3 · PDF p. 107
Spec wording
“Government approval is required for all submittals. CQC inspection reports shall be submitted under this Specification section and follow the [Applicable CQC Control Phase (Preparatory, Initial, or Follow-Up)]: [Applicable Specification section] naming convention. 1. Preconstruction Submittals a. Interim CQC Plan b. CQC Plan c. Additional Requirements for Design Quality Control (DQC) Plan 2. Design Data a. ...”
01 45 00 1.3107–
Test / cert.Test / cert.Personnel RequirementsQuality Control01 45 00 3.4.A · PDF p. 112
Spec wording
“A. Personnel Requirements: The requirements for the CQC organization are a Safety and Health Manager, CQC System Manager, a Design Quality Manager (if applicable), and sufficient number of additional qualified personnel to ensure safety and Contract compliance. The Safety and Health Manager shall satisfy the requirements of Specification 01 35 26 Safety Requirements and reports directly to a senior project (or ...”
01 45 00 3.4.A112–
Test / cert.Test / cert.CQC PersonnelQuality Control01 45 00 3.4.C · PDF p. 113-114
Spec wording
“C. CQC Personnel: In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist in the CQC System Manager for the following areas, as applicable: electrical, mechanical, civil, structural, environmental, architectural, materials technician submittals clerk, Commissioning Agent/LEED specialist, and low voltage systems. These individuals or ...”
01 45 00 3.4.C113-114–
Test / cert.Test / cert.Submittals have to comply with the requirements in Section 01 ...Quality Control01 45 00 3.5 · PDF p. 114
Spec wording
“Submittals have to comply with the requirements in Section 01 33 23 Shop Drawings, Product Data, and Samples. The CQC organization is responsible for certifying that all submittals and deliverables are in compliance with the contract requirements. When Section 01 91 00 General Commissioning Requirements is included in the contract, the submittals required by the section have to be coordinated with the Section 01 33 ...”
01 45 00 3.5114–
Test / cert.Test / cert.Establish and maintain quality control for the environmental protection of ...Temporary Environmental Controls01 57 19 1.2 · PDF p. 149
Spec wording
“Establish and maintain quality control for the environmental protection of all items set forth herein. Record on daily reports any problems in complying with laws, regulations, and ordinances. Note any corrective action taken.”
01 57 19 1.2149–
TrainingTrainingIn accordance with Section, 01 33 23, SHOP DRAWINGS, PRODUCT ...Temporary Environmental Controls01 57 19 1.4 · PDF p. 149
Spec wording
“In accordance with Section, 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish the following: 1. Environmental Protection Plan: After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the Contracting Officer's Representative (COR) to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental ...”
01 57 19 1.4149–
Closeout stepCloseout stepCloseout SubmittalsSustainable Construction Requirements01 81 13 1.5.G · PDF p. 167
Spec wording
“G. Closeout Submittals: Within 14 days after Substantial Completion provide the following: 1. Final version of Low Pollutant-Emitting Materials Tracking Spreadsheet. 2. Manufacturer's cut sheets and product data highlighting the Minimum Efficiency Reporting Value (MERV) for filtration media installed at return air grilles during construction if permanently installed air handling units are used during construction. ...”
01 81 13 1.5.G167–
Test / cert.Test / cert.This Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS shall form ...General Commissioning Requirements01 91 00 1.1.A · PDF p. 177
Spec wording
“A. This Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS shall form the basis of the construction phase commissioning process and procedures. The Commissioning Agent shall add, modify, and refine the commissioning procedures, as approved by the Department of Veterans Affairs (VA), to suit field conditions and actual manufacturer's equipment, incorporate test data and procedure results, and provide detailed ...”
01 91 00 1.1.A177–
Test / cert.Test / cert.Various sections of the project specifications require equipment startup, testing, ...General Commissioning Requirements01 91 00 1.1.B · PDF p. 177
Spec wording
“B. Various sections of the project specifications require equipment startup, testing, and adjusting services. Requirements for startup, testing, and adjusting services specified in the Division 7, Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division 31 series sections of these specifications are intended to be provided in coordination with the commissioning services and are not ...”
01 91 00 1.1.B177–
Test / cert.Test / cert.Where individual testing, adjusting, or related services are required in ...General Commissioning Requirements01 91 00 1.1.C · PDF p. 177
Spec wording
“C. Where individual testing, adjusting, or related services are required in the project specifications and not specifically required by this commissioning requirements specification, the specified services shall be provided and copies of documentation, as required by those specifications shall be submitted to the VA and the Commissioning Agent to be indexed for future reference.”
01 91 00 1.1.C177–
Test / cert.Test / cert.Where training or educational services for VA are required and ...General Commissioning Requirements01 91 00 1.1.D · PDF p. 177
Spec wording
“D. Where training or educational services for VA are required and specified in other sections of the specifications, including but not limited to Division 7, Division 8, Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division 31 series sections of the specification, these services are intended to be provided in addition to the training and educational services specified herein.”
01 91 00 1.1.D177–
Test / cert.Test / cert.Commissioning is a systematic process of verifying that the building ...General Commissioning Requirements01 91 00 1.1.E · PDF p. 177-178
Spec wording
“E. Commissioning is a systematic process of verifying that the building systems perform interactively according to the construction documents and the VA's operational needs. The commissioning process shall encompass and coordinate the system documentation, equipment startup, control system calibration, testing and balancing, performance testing and training. Commissioning during the construction and post-occupancy ...”
01 91 00 1.1.E177-178–
Test / cert.Test / cert.The commissioning process does not take away from or reduce ...General Commissioning Requirements01 91 00 1.1.F · PDF p. 178
Spec wording
“F. The commissioning process does not take away from or reduce the responsibility of the Contractor to provide a finished and fully functioning product.”
01 91 00 1.1.F178–
Test / cert.Test / cert.The commissioning team shall consist of, but not be limited ...General Commissioning Requirements01 91 00 1.8.A · PDF p. 193
Spec wording
“A. The commissioning team shall consist of, but not be limited to, representatives of Contractor, including Project Superintendent and subcontractors, installers, schedulers, suppliers, and specialists deemed appropriate by the Department of Veterans Affairs (VA) and Commissioning Agent.”
01 91 00 1.8.A193–
Test / cert.Test / cert.Members Appointed by Contractor:General Commissioning Requirements01 91 00 1.8.B · PDF p. 193
Spec wording
“B. Members Appointed by Contractor: 1. Contractor' Commissioning Manager: The designated person, company, or entity that plans, schedules and coordinates the commissioning activities for the construction team. 2. Contractor's Commissioning Representative(s): Individual(s), each having authority to act on behalf of the entity he or she represents, explicitly organized to implement the commissioning process through ...”
01 91 00 1.8.B193–
Test / cert.Test / cert.Members Appointed by VA:General Commissioning Requirements01 91 00 1.8.C · PDF p. 193-194
Spec wording
“C. Members Appointed by VA: 1. Commissioning Agent: The designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process. The VA will engage the CxA under a separate contract. 2. User: Representatives of the facility user and operation and maintenance personnel. 3. A/E: Representative of the Architect and engineering design professionals.”
01 91 00 1.8.C193-194–
Test / cert.Test / cert.Appoint an individual, company or firm to act as the ...General Commissioning Requirements01 91 00 1.9.A · PDF p. 194
Spec wording
“A. Appoint an individual, company or firm to act as the Commissioning Agent.”
01 91 00 1.9.A194–
Test / cert.Test / cert.Assign operation and maintenance personnel and schedule them to participate ...General Commissioning Requirements01 91 00 1.9.B · PDF p. 194
Spec wording
“B. Assign operation and maintenance personnel and schedule them to participate in commissioning team activities including, but not limited to, the following: 1. Coordination meetings. 2. Training in operation and maintenance of systems, subsystems, and equipment. 3. Testing meetings. 4. Witness and assist in Systems Functional Performance Testing. 5. Demonstration of operation of systems, subsystems, and equipment.”
01 91 00 1.9.B194–
Test / cert.Test / cert.Provide the Construction Documents, prepared by Architect and approved by ...General Commissioning Requirements01 91 00 1.9.C · PDF p. 194
Spec wording
“C. Provide the Construction Documents, prepared by Architect and approved by VA, to the Commissioning Agent and for use in managing the commissioning process, developing the commissioning plan, systems manuals, and reviewing the operation and maintenance training plan.”
01 91 00 1.9.C194–
Test / cert.Test / cert.The Contractor shall assign a Commissioning Manager to manage commissioning ...General Commissioning Requirements01 91 00 1.10.A · PDF p. 194
Spec wording
“A. The Contractor shall assign a Commissioning Manager to manage commissioning activities of the Contractor, and subcontractors.”
01 91 00 1.10.A194–
Test / cert.Test / cert.The Contractor shall ensure that the commissioning responsibilities outlined in ...General Commissioning Requirements01 91 00 1.10.B · PDF p. 194
Spec wording
“B. The Contractor shall ensure that the commissioning responsibilities outlined in these specifications are included in all subcontracts and that subcontractors comply with the requirements of these specifications.”
01 91 00 1.10.B194–
Test / cert.Test / cert.The Contractor shall ensure that each installing subcontractor shall assign ...General Commissioning Requirements01 91 00 1.10.C · PDF p. 194-195
Spec wording
“C. The Contractor shall ensure that each installing subcontractor shall assign representatives with expertise and authority to act on behalf of the subcontractor and schedule them to participate in and perform commissioning team activities including, but not limited to, the following: 1. Participate in commissioning coordination meetings. 2. Conduct operation and maintenance training sessions in accordance with ...”
01 91 00 1.10.C194-195–
Test / cert.Test / cert.Organize and lead the commissioning teamGeneral Commissioning Requirements01 91 00 1.11.A · PDF p. 195
Spec wording
“A. Organize and lead the commissioning team.”
01 91 00 1.11.A195–
Test / cert.Test / cert.Prepare the commissioning plan. See Paragraph 1.11-A of this specification ...General Commissioning Requirements01 91 00 1.11.B · PDF p. 195
Spec wording
“B. Prepare the commissioning plan. See Paragraph 1.11-A of this specification Section for further information.”
01 91 00 1.11.B195–
Test / cert.Test / cert.Review and comment on selected submittals from the Contractor for ...General Commissioning Requirements01 91 00 1.11.C · PDF p. 195
Spec wording
“C. Review and comment on selected submittals from the Contractor for general conformance with the Construction Documents. Review and comment on the ability to test and operate the system and/or equipment, including providing gages, controls and other components required to operate, maintain, and test the system. Review and comment on performance expectations of systems and equipment and interfaces between systems ...”
01 91 00 1.11.C195–
Test / cert.Test / cert.At the beginning of the construction phase, conduct an initial ...General Commissioning Requirements01 91 00 1.11.D · PDF p. 195
Spec wording
“D. At the beginning of the construction phase, conduct an initial construction phase coordination meeting for the purpose of reviewing the commissioning activities and establishing tentative schedules for operation and maintenance submittals; operation and maintenance training sessions; TAB Work; Pre-Functional Checklists, Systems Functional Performance Testing; and project completion.”
01 91 00 1.11.D195–
Test / cert.Test / cert.Convene commissioning team meetings for the purpose of coordination, communication, ...General Commissioning Requirements01 91 00 1.11.E · PDF p. 195-196
Spec wording
“E. Convene commissioning team meetings for the purpose of coordination, communication, and conflict resolution; discuss status of the commissioning processes. Responsibilities include arranging for facilities, preparing agenda and attendance lists, and notifying participants. The Commissioning Agent shall prepare and distribute minutes to commissioning team members and attendees within five workdays of the ...”
01 91 00 1.11.E195-196–
Test / cert.Test / cert.Observe construction and report progress, observations and issues. Observe systems ...General Commissioning Requirements01 91 00 1.11.F · PDF p. 196
Spec wording
“F. Observe construction and report progress, observations and issues. Observe systems and equipment installation for adequate accessibility for maintenance and component replacement or repair, and for general conformance with the Construction Documents.”
01 91 00 1.11.F196–
Test / cert.Test / cert.Prepare Project specific Pre-Functional Checklists and Systems Functional Performance Test ...General Commissioning Requirements01 91 00 1.11.G · PDF p. 196
Spec wording
“G. Prepare Project specific Pre-Functional Checklists and Systems Functional Performance Test procedures.”
01 91 00 1.11.G196–
Test / cert.Test / cert.Coordinate Systems Functional Performance Testing schedule with the Contractor ...General Commissioning Requirements01 91 00 1.11.H · PDF p. 196
Spec wording
“H. Coordinate Systems Functional Performance Testing schedule with the Contractor.”
01 91 00 1.11.H196–
Test / cert.Test / cert.Witness selected systems startupsGeneral Commissioning Requirements01 91 00 1.11.I · PDF p. 196
Spec wording
“I. Witness selected systems startups.”
01 91 00 1.11.I196–
Test / cert.Test / cert.Verify selected Pre-Functional Checklists completed and submitted by the Contractor ...General Commissioning Requirements01 91 00 1.11.J · PDF p. 196
Spec wording
“J. Verify selected Pre-Functional Checklists completed and submitted by the Contractor.”
01 91 00 1.11.J196–
Test / cert.Test / cert.Witness and document Systems Functional Performance TestingGeneral Commissioning Requirements01 91 00 1.11.K · PDF p. 196
Spec wording
“K. Witness and document Systems Functional Performance Testing.”
01 91 00 1.11.K196–
Test / cert.Test / cert.Compile test data, inspection reports, and certificates and include them ...General Commissioning Requirements01 91 00 1.11.L · PDF p. 196
Spec wording
“L. Compile test data, inspection reports, and certificates and include them in the systems manual and commissioning report.”
01 91 00 1.11.L196–
Test / cert.Test / cert.Review and comment on operation and maintenance (O&M) documentation and ...General Commissioning Requirements01 91 00 1.11.M · PDF p. 196
Spec wording
“M. Review and comment on operation and maintenance (O&M) documentation and systems manual outline for compliance with the Contract Documents. Operation and maintenance documentation requirements are specified in Paragraph 1.25, Section 01 00 00 GENERAL REQUIREMENTS.”
01 91 00 1.11.M196–
Test / cert.Test / cert.Review operation and maintenance training program developed by the Contractor. ...General Commissioning Requirements01 91 00 1.11.N · PDF p. 196
Spec wording
“N. Review operation and maintenance training program developed by the Contractor. Verify training plans provide qualified instructors to conduct operation and maintenance training.”
01 91 00 1.11.N196–
Test / cert.Test / cert.Prepare commissioning Field Observation ReportsGeneral Commissioning Requirements01 91 00 1.11.O · PDF p. 196
Spec wording
“O. Prepare commissioning Field Observation Reports.”
01 91 00 1.11.O196–
Test / cert.Test / cert.Prepare the Final Commissioning ReportGeneral Commissioning Requirements01 91 00 1.11.P · PDF p. 196
Spec wording
“P. Prepare the Final Commissioning Report.”
01 91 00 1.11.P196–
Test / cert.Test / cert.Return to the site at 10 months into the 12 ...General Commissioning Requirements01 91 00 1.11.Q · PDF p. 196
Spec wording
“Q. Return to the site at 10 months into the 12 month warranty period and review with facility staff the current building operation and the condition of outstanding issues related to the original and seasonal Systems Functional Performance Testing. Also interview facility staff and identify problems or concerns they have operating the building as originally intended. Make suggestions for improvements and for ...”
01 91 00 1.11.Q196–
Test / cert.Test / cert.Assemble the final commissioning documentation, including the Final Commissioning Report ...General Commissioning Requirements01 91 00 1.11.R · PDF p. 196
Spec wording
“R. Assemble the final commissioning documentation, including the Final Commissioning Report and Addendum to the Final Commissioning Report.”
01 91 00 1.11.R196–
Test / cert.Test / cert.Commissioning PlanGeneral Commissioning Requirements01 91 00 1.12.A · PDF p. 197
Spec wording
“A. Commissioning Plan: A document, prepared by Commissioning Agent, that outlines the schedule, allocation of resources, and documentation requirements of the commissioning process, and shall include, but is not limited, to the following: 1. Plan for delivery and review of submittals, systems manuals, and other documents and reports. Identification of the relationship of these documents to other functions and a ...”
01 91 00 1.12.A197–
Test / cert.Test / cert.Systems Functional Performance Test ProceduresGeneral Commissioning Requirements01 91 00 1.12.B · PDF p. 197-198
Spec wording
“B. Systems Functional Performance Test Procedures: The Commissioning Agent will develop Systems Functional Performance Test Procedures for each system to be commissioned, including subsystems, or equipment and interfaces or interlocks with other systems. Systems Functional Performance Test Procedures will include a separate entry, with space for comments, for each item to be tested. Preliminary Systems Functional ...”
01 91 00 1.12.B197-198–
Test / cert.Test / cert.Pre-Functional ChecklistsGeneral Commissioning Requirements01 91 00 1.12.C · PDF p. 198
Spec wording
“C. Pre-Functional Checklists: The Commissioning Agent will prepare Pre-Functional Checklists. Pre-Functional Checklists shall be completed and signed by the Contractor, verifying that systems, subsystems, equipment, and associated controls are ready for testing. The Commissioning Agent will spot check Pre-Functional Checklists to verify accuracy and readiness for testing. Inaccurate or incomplete Pre-Functional ...”
01 91 00 1.12.C198–
Test / cert.Test / cert.Test and Inspection ReportsGeneral Commissioning Requirements01 91 00 1.12.D · PDF p. 198
Spec wording
“D. Test and Inspection Reports: The Commissioning Agent will record test data, observations, and measurements on Systems Functional Performance Test Procedure. The report will also include recommendation for system acceptance or non-acceptance. Photographs, forms, and other means appropriate for the application shall be included with data. Commissioning Agent Will compile test and inspection reports and test and ...”
01 91 00 1.12.D198–
Test / cert.Test / cert.Corrective Action DocumentsGeneral Commissioning Requirements01 91 00 1.12.E · PDF p. 198
Spec wording
“E. Corrective Action Documents: The Commissioning Agent will document corrective action taken for systems and equipment that fail tests. The documentation will include any required modifications to systems and equipment and/or revisions to test procedures, if any. The Commissioning Agent will witness and document any retesting of systems and/or equipment requiring corrective action and document retest results.”
01 91 00 1.12.E198–
Test / cert.Test / cert.Commissioning Issues LogGeneral Commissioning Requirements01 91 00 1.12.F · PDF p. 199
Spec wording
“F. Commissioning Issues Log: The Commissioning Agent will prepare and maintain Commissioning Issues Log that describes Commissioning Issues and Commissioning Observations that are identified during the Commissioning process. These observations and issues include, but are not limited to, those that are at variance with the Contract Documents. The Commissioning Issues Log will identify and track issues as they are ...”
01 91 00 1.12.F199–
Test / cert.Test / cert.Final Commissioning ReportGeneral Commissioning Requirements01 91 00 1.12.G · PDF p. 200
Spec wording
“G. Final Commissioning Report: The Commissioning Agent will document results of the commissioning process, including unresolved issues, and performance of systems, subsystems, and equipment. The Commissioning Report will indicate whether systems, subsystems, and equipment have been properly installed and are performing according to the Contract Documents. This report will be used by the Department of Veterans ...”
01 91 00 1.12.G200–
Test / cert.Test / cert.Addendum to Final Commissioning ReportGeneral Commissioning Requirements01 91 00 1.12.H · PDF p. 200-201
Spec wording
“H. Addendum to Final Commissioning Report: The Commissioning Agent will prepare an Addendum to the Final Commissioning Report near the end of the Warranty Period. The Addendum will indicate whether systems, subsystems, and equipment are complete and continue to perform according to the Contract Documents. The Addendum to the Final Commissioning Report shall include, but is not limited to, the following: 1. ...”
01 91 00 1.12.H200-201–
Test / cert.Test / cert.Systems ManualGeneral Commissioning Requirements01 91 00 1.12.I · PDF p. 201
Spec wording
“I. Systems Manual: The Commissioning Agent will gather required information and compile the Systems Manual. The Systems Manual will include, but is not limited to, the following: 1. Design Narrative, including system narratives, schematics, single-line diagrams, flow diagrams, equipment schedules, and changes made throughout the Project. 2. Reference to Final Commissioning Plan. 3. Reference to Final Commissioning ...”
01 91 00 1.12.I201–
Test / cert.Test / cert.Preliminary Commissioning Plan SubmittalGeneral Commissioning Requirements01 91 00 1.13.A · PDF p. 201-202
Spec wording
“A. Preliminary Commissioning Plan Submittal: The Commissioning Agent has prepared a Preliminary Commissioning Plan based on the final Construction Documents. The Preliminary Commissioning Plan is included as an Appendix to this specification section. The Preliminary Commissioning Plan is provided for information only. It contains preliminary information about the following commissioning activities: 1. The ...”
01 91 00 1.13.A201-202–
Test / cert.Test / cert.Final Commissioning Plan SubmittalGeneral Commissioning Requirements01 91 00 1.13.B · PDF p. 202
Spec wording
“B. Final Commissioning Plan Submittal: Based on the Final Construction Documents and the Contractor's project team, the Commissioning Agent will prepare the Final Commissioning Plan as described in this section. The Commissioning Agent will submit three hard copies and three sets of electronic files of Final Commissioning Plan. The Contractor shall review the Commissioning Plan and provide any comments to the VA. ...”
01 91 00 1.13.B202three hard copies; three sets; electronic files
Test / cert.Test / cert.Systems Functional Performance Test ProcedureGeneral Commissioning Requirements01 91 00 1.13.C · PDF p. 202
Spec wording
“C. Systems Functional Performance Test Procedure: The Commissioning Agent will submit preliminary Systems Functional Performance Test Procedures to the Contractor, and the VA for review and comment. The Contractor shall return review comments to the VA and the Commissioning Agent. The VA will also return review comments to the Commissioning Agent. The Commissioning Agent will incorporate review comments into the ...”
01 91 00 1.13.C202–
Test / cert.Test / cert.Pre-Functional ChecklistsGeneral Commissioning Requirements01 91 00 1.13.D · PDF p. 202
Spec wording
“D. Pre-Functional Checklists: The Commissioning Agent will submit Pre-Functional Checklists to be completed by the Contractor.”
01 91 00 1.13.D202–
Test / cert.Test / cert.Test and Inspection ReportsGeneral Commissioning Requirements01 91 00 1.13.E · PDF p. 202
Spec wording
“E. Test and Inspection Reports: The Commissioning Agent will submit test and inspection reports to the VA with copies to the Contractor and the Architect/Engineer.”
01 91 00 1.13.E202–
Test / cert.Test / cert.Corrective Action DocumentsGeneral Commissioning Requirements01 91 00 1.13.F · PDF p. 202
Spec wording
“F. Corrective Action Documents: The Commissioning Agent will submit corrective action documents to the VA COR with copies to the Contractor and Architect.”
01 91 00 1.13.F202–
Test / cert.Test / cert.Preliminary Commissioning Report SubmittalGeneral Commissioning Requirements01 91 00 1.13.G · PDF p. 202-203
Spec wording
“G. Preliminary Commissioning Report Submittal: The Commissioning Agent will submit three electronic copies of the preliminary commissioning report. One electronic copy, with review comments, will be returned to the Commissioning Agent for preparation of the final submittal.”
01 91 00 1.13.G202-203three electronic copies; One electronic copy
Test / cert.Test / cert.Final Commissioning Report SubmittalGeneral Commissioning Requirements01 91 00 1.13.H · PDF p. 203
Spec wording
“H. Final Commissioning Report Submittal: The Commissioning Agent will submit four sets of electronically formatted information of the final commissioning report to the VA. The final submittal will incorporate comments as directed by the VA.”
01 91 00 1.13.H203four sets; electronically
Test / cert.Test / cert.Data for Commissioning:General Commissioning Requirements01 91 00 1.13.I · PDF p. 203
Spec wording
“I. Data for Commissioning: 1. The Commissioning Agent will request in writing from the Contractor specific information needed about each piece of commissioned equipment or system to fulfill requirements of the Commissioning Plan. 2. The Commissioning Agent may request further documentation as is necessary for the commissioning process or to support other VA data collection requirements, including Construction ...”
01 91 00 1.13.I203–
Test / cert.Test / cert.The Commissioning Agent will be responsible for the overall management ...General Commissioning Requirements01 91 00 1.14.A · PDF p. 203
Spec wording
“A. The Commissioning Agent will be responsible for the overall management of the commissioning process as well as coordinating scheduling of commissioning tasks with the VA and the Contractor. As directed by the VA, the Contractor shall incorporate Commissioning tasks, including, but not limited to, Systems Functional Performance Testing (including predecessors) with the Master Construction Schedule.”
01 91 00 1.14.A203–
Test / cert.Test / cert.Within 30 days of contract award, the Contractor shall designate ...General Commissioning Requirements01 91 00 1.14.B · PDF p. 203
Spec wording
“B. Within 30 days of contract award, the Contractor shall designate a specific individual as the Commissioning Manager (CxM) to manage and lead the commissioning effort on behalf of the Contractor. The Commissioning Manager shall be the single point of contact and communications for all commissioning related services by the Contractor.”
01 91 00 1.14.B203–
Test / cert.Test / cert.Within 30 days of contract award, the Contractor shall ensure ...General Commissioning Requirements01 91 00 1.14.C · PDF p. 203-204
Spec wording
“C. Within 30 days of contract award, the Contractor shall ensure that each subcontractor designates specific individuals as Commissioning Representatives (CXR) to be responsible for commissioning related tasks. The Contractor shall ensure the designated Commissioning Representatives participate in the commissioning process as team members providing commissioning testing services, equipment operation, adjustments, ...”
01 91 00 1.14.C203-204–
Test / cert.Test / cert.The following table outlines the roles and responsibilities for the ...General Commissioning Requirements01 91 00 3.1.A · PDF p. 206-208
Spec wording
“A. The following table outlines the roles and responsibilities for the Commissioning Team members during the Construction Phase: Construction Phase CxA = Commissioning Agent L = Lead COR = Contracting Officer's P = Participate Representative A = Approve Commissioning Roles & Responsibilities A/E = Design Arch/Engineer R = Review PC = Prime Contractor O = Optional O&M = Gov't Facility O&M Category Task Description ...”
01 91 00 3.1.A206-208–
Test / cert.Test / cert.The following table outlines the roles and responsibilities for the ...General Commissioning Requirements01 91 00 3.1.B · PDF p. 208-210
Spec wording
“B. The following table outlines the roles and responsibilities for the Commissioning Team members during the Acceptance Phase: Acceptance Phase CxA = Commissioning Agent L = Lead COR = Contracting Officer's P = Participate Representative A = Approve A/E = Design Arch/Engineer Commissioning Roles & Responsibilities R = Review PC = Prime Contractor O = Optional O&M = Gov't Facility O&M Category Task Description CxA ...”
01 91 00 3.1.B208-210–
Test / cert.Test / cert.The following table outlines the roles and responsibilities for the ...General Commissioning Requirements01 91 00 3.1.C · PDF p. 210-211
Spec wording
“C. The following table outlines the roles and responsibilities for the Commissioning Team members during the Warranty Phase: Warranty Phase CxA = Commissioning Agent L = Lead Commissioning Roles & Responsibilities Category Task Description Meetings Post-Occupancy User Review Meeting Site Periodic Site Visits Observations Functional Deferred and/or seasonal Testing Test Protocols Technical Issues Resolution Meetings ...”
01 91 00 3.1.C210-211–
Test / cert.Test / cert.The following procedures shall apply to all equipment and systems ...General Commissioning Requirements01 91 00 3.2.A · PDF p. 212-213
Spec wording
“A. The following procedures shall apply to all equipment and systems to be commissioned, according to Part 1, Systems to Be Commissioned. 1. Pre-Functional Checklists are important to ensure that the equipment and systems are hooked up and operational. These ensure that Systems Functional Performance Testing may proceed without unnecessary delays. Each system to be commissioned shall have a full Pre-Functional ...”
01 91 00 3.2.A212-213–
Test / cert.Test / cert.The Contractor shall clearly list any outstanding items of the ...General Commissioning Requirements01 91 00 3.3.A · PDF p. 213
Spec wording
“A. The Contractor shall clearly list any outstanding items of the initial startup and Pre-Functional Checklist procedures that were not completed successfully, at the bottom of the procedures form or on an attached sheet. The procedures form and any outstanding deficiencies shall be provided to the VA and the Commissioning Agent within two days of completion.”
01 91 00 3.3.A213–
Test / cert.Test / cert.The Commissioning Agent will review the report and submit comments ...General Commissioning Requirements01 91 00 3.3.B · PDF p. 213-214
Spec wording
“B. The Commissioning Agent will review the report and submit comments to the VA. The Commissioning Agent will work with the Contractor to correct and verify deficiencies or uncompleted items. The Commissioning Agent will involve the VA and others as necessary. The Contractor shall correct all areas that are noncompliant or incomplete in the checklists in a timely manner, and shall notify the VA and Commissioning ...”
01 91 00 3.3.B213-214–
Test / cert.Test / cert.The Contractor shall be responsible for resolution of deficiencies as ...General Commissioning Requirements01 91 00 3.3.C · PDF p. 214
Spec wording
“C. The Contractor shall be responsible for resolution of deficiencies as directed the VA.”
01 91 00 3.3.C214–
Test / cert.Test / cert.The project may require startup and initial checkout to be ...General Commissioning Requirements01 91 00 3.4.A · PDF p. 214
Spec wording
“A. The project may require startup and initial checkout to be executed in phases. This phasing shall be planned and scheduled in a coordination meeting of the VA, Commissioning Agent, and the Contractor. Results will be added to the master construction schedule and the commissioning schedule.”
01 91 00 3.4.A214–
Test / cert.Test / cert.Trending is a method of testing as a standalone method ...General Commissioning Requirements01 91 00 3.5.A · PDF p. 214
Spec wording
“A. Trending is a method of testing as a standalone method or to augment manual testing. The Contractor shall trend any and all points of the system or systems at intervals specified below.”
01 91 00 3.5.A214–
Test / cert.Test / cert.Alarms are a means to notify the system operator that ...General Commissioning Requirements01 91 00 3.5.B · PDF p. 214-215
Spec wording
“B. Alarms are a means to notify the system operator that abnormal conditions are present in the system. Alarms shall be structured into three tiers – Critical, Priority, and Maintenance. 1. Critical alarms are intended to be alarms that require the immediate attention of and action by the Operator. These alarms shall be displayed on the Operator Workstation in a popup style window that is graphically linked to the ...”
01 91 00 3.5.B214-215–
Test / cert.Test / cert.The Contractor shall provide a wireless internet network in the ...General Commissioning Requirements01 91 00 3.5.C · PDF p. 215
Spec wording
“C. The Contractor shall provide a wireless internet network in the building for use during controls programming, checkout, and commissioning. This network will allow project team members to more effectively program, view, manipulate and test control devices while being in the same room as the controlled device.”
01 91 00 3.5.C215–
Test / cert.Test / cert.The Contractor shall provide graphical trending through the DDC control ...General Commissioning Requirements01 91 00 3.5.D · PDF p. 215-227
Spec wording
“D. The Contractor shall provide graphical trending through the DDC control system of systems being commissioned. Trending requirements are indicated below and included with the Systems Functional Performance Test Procedures. Trending shall occur before, during and after Systems Functional Performance Testing. The Contractor shall be responsible for producing graphical representations of the trended DDC points that ...”
01 91 00 3.5.D215-227–
Test / cert.Test / cert.The Contractor shall provide the following information prior to Systems ...General Commissioning Requirements01 91 00 3.5.E · PDF p. 227-228
Spec wording
“E. The Contractor shall provide the following information prior to Systems Functional Performance Testing. Any documentation that is modified after submission shall be recorded and resubmitted to the COR and Commissioning Agent. 1. Point-to-Point checkout documentation; 2. Sensor field calibration documentation including system name, sensor/point name, measured value, DDC value, and Correction Factor. 3. A sensor ...”
01 91 00 3.5.E227-228–
O&MO&MTraining Preparation ConferenceGeneral Commissioning Requirements01 91 00 3.9.A · PDF p. 236
Spec wording
“A. Training Preparation Conference: Before operation and maintenance training, the Commissioning Agent will convene a training preparation conference to include VA's COR, VA's Operations and Maintenance personnel, and the Contractor. The purpose of this conference will be to discuss and plan for Training and Demonstration of VA Operations and Maintenance personnel.”
01 91 00 3.9.A236–
O&MO&MThe Contractor shall provide training and demonstration as required by ...General Commissioning Requirements01 91 00 3.9.B · PDF p. 236
Spec wording
“B. The Contractor shall provide training and demonstration as required by other Division 21, Division 22, Division 23, Division 26, Division 27, Division 28, and Division 31 sections. The Training and Demonstration shall include, but is not limited to, the following: 1. Review the Contract Documents. 2. Review installed systems, subsystems, and equipment. 3. Review instructor qualifications. 4. Review instructional ...”
01 91 00 3.9.B236–
O&MO&MTraining Module SubmittalsGeneral Commissioning Requirements01 91 00 3.9.C · PDF p. 236-237
Spec wording
“C. Training Module Submittals: The Contractor shall submit the following information to the VA and the Commissioning Agent: 1. Instruction Program: Submit two copies of outline of instructional program for demonstration and training, including a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training ...”
01 91 00 3.9.C236-237two copies; DVD; 3-ring; binders; binder
O&MO&MQuality Assurance:General Commissioning Requirements01 91 00 3.9.D · PDF p. 237
Spec wording
“D. Quality Assurance: 1. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance. 2. Instructor Qualifications: A factory authorized service representative, complying with ...”
01 91 00 3.9.D237–
O&MO&MTraining Coordination:General Commissioning Requirements01 91 00 3.9.E · PDF p. 238
Spec wording
“E. Training Coordination: 1. Coordinate instruction schedule with VA's operations. Adjust schedule as required to minimize disrupting VA's operations. 2. Coordinate instructors, including providing notification of dates, times, length of instruction time, and course content. 3. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction ...”
01 91 00 3.9.E238–
O&MO&MInstruction Program:General Commissioning Requirements01 91 00 3.9.F · PDF p. 238
Spec wording
“F. Instruction Program: 1. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections, and as follows: a. Fire protection systems, including fire alarm, fire pumps, and fire suppression systems. b. Intrusion detection systems. c. Conveying systems, including elevators, wheelchair ...”
01 91 00 3.9.F238–
O&MO&MTraining ModulesGeneral Commissioning Requirements01 91 00 3.9.G · PDF p. 239-240
Spec wording
“G. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participants are expected to master. For each module, include instruction for the following: 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: a. System, subsystem, and equipment descriptions. b. Performance and design criteria if ...”
01 91 00 3.9.G239-240–
O&MO&MTraining Execution:General Commissioning Requirements01 91 00 3.9.H · PDF p. 240-241
Spec wording
“H. Training Execution: 1. Preparation: Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a combined training manual. Set up instructional equipment at instruction location. 2. Instruction: a. Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to coordinate instructors, and to coordinate ...”
01 91 00 3.9.H240-241–
O&MO&MDemonstration and Training Recording:General Commissioning Requirements01 91 00 3.9.I · PDF p. 241-242
Spec wording
“I. Demonstration and Training Recording: 1. General: Engage a qualified commercial photographer to record demonstration and training. Record each training module separately. Include classroom instructions and demonstrations, board diagrams, and other visual aids, but not student practice. At beginning of each training module, record each chart containing learning objective and lesson outline. 2. Video Format: ...”
01 91 00 3.9.I241-242DVD

Division 02 Existing conditions 14 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Monitoring, Inspection and Testing by Contractor CPIH/CIHTraditional Asbestos Abatement02 82 11 2.2.C · PDF p. 285-286
Spec wording
“C. Monitoring, Inspection and Testing by Contractor CPIH/CIH: The Contractor's CPIH/CIH is responsible for managing all monitoring, inspections, and testing required by these specifications, as well as any and all regulatory requirements adopted by these specifications. The CPIH/CIH is responsible for the continuous monitoring of all subsystems and procedures which could affect the health and safety of the ...”
02 82 11 2.2.C285-286PDF
TrainingTrainingPre-Start Meeting Submittals:Traditional Asbestos Abatement02 82 11 2.4.A · PDF p. 287
Spec wording
“A. Pre-Start Meeting Submittals: 1. Submit to the VA a minimum of 14 days prior to the pre-start meeting the following for review and approval. Meeting this requirement is a prerequisite for the pre-start meeting for this project: a. Submit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart. b. Submit a staff organization chart ...”
02 82 11 2.4.A287–
Test / cert.Test / cert.Submittals at Completion of AbatementTraditional Asbestos Abatement02 82 11 2.4.C · PDF p. 291
Spec wording
“C. Submittals at Completion of Abatement: The CPIH/CIH shall submit a project report consisting of the daily log book requirements and documentation of events during the abatement project including Waste Shipment Records signed by the landfill's agent. It will also include information on the containment and transportation of waste from the containment with applicable Chain of Custody forms. The report shall include ...”
02 82 11 2.4.C291–
Test / cert.Test / cert.Laboratory Testing of PCM Clearance SamplesTraditional Asbestos Abatement02 82 11 3.6.G · PDF p. 313
Spec wording
“G. Laboratory Testing of PCM Clearance Samples: The services of an AIHA accredited laboratory will be employed by the VA to perform analysis for the PCM air samples. The accredited laboratory shall be successfully participating in the AIHA Proficiency Analytical Testing (PAT) program. Samples will be sent daily by the VPIH/CIH so that verbal/faxed reports can be received within 24-36 hours. A complete record, ...”
02 82 11 3.6.G313–
Test / cert.Test / cert.Laboratory Testing of Tem SamplesTraditional Asbestos Abatement02 82 11 3.6.H · PDF p. 314
Spec wording
“H. Laboratory Testing of Tem Samples: Samples shall be sent by the VPIH/CIH to a NIST NVLAP accredited laboratory for analysis by TEM. The laboratory shall be successfully participating in the NIST Airborne Asbestos Analysis (TEM) program. Verbal/faxed results from the laboratory shall be available within 24-36 hours after receipt of the samples. A complete record, certified by the laboratory, of all TEM results ...”
02 82 11 3.6.H314–
Test / cert.Test / cert.Laboratory Testing of Bulk SamplesTraditional Asbestos Abatement02 82 11 3.6.I · PDF p. 314
Spec wording
“I. Laboratory Testing of Bulk Samples: Samples shall be sent by the VPIH/CIH or CPIH/CIH to a NIST NVLAP accredited laboratory for analysis by PLM. The laboratory shall successfully participate in the NIST NVLAP Bulk Asbestos Analysis (PLM) program. Verbal/faxed results from the laboratory shall be available within 24-36 hours after receipt of the samples. A complete record, certified by the laboratory, of all PLM ...”
02 82 11 3.6.I314–
Test / cert.Test / cert.Completion of Abatement Work:Traditional Asbestos Abatement02 82 11 3.7.A · PDF p. 314
Spec wording
“A. Completion of Abatement Work: 1. After thorough decontamination, seal negative air machines with 2 layers of 6-mil poly and duct tape to form a tight seal at the intake/outlet ends before removal from the regulated area. Complete asbestos abatement work upon meeting the regulated area visual and air clearance criteria and fulfilling the following: a. Remove all equipment and materials from the project area. b. ...”
02 82 11 3.7.A314–
Test / cert.Test / cert.Certificate of Completion By ContractorTraditional Asbestos Abatement02 82 11 3.7.B · PDF p. 314
Spec wording
“B. Certificate of Completion By Contractor: The CPIH/CIH shall complete and sign the "Certificate of Completion" in accordance with Attachment 1 at the completion of the abatement and decontamination of the regulated area.”
02 82 11 3.7.B314–
Test / cert.Test / cert.Work ShiftsTraditional Asbestos Abatement02 82 11 3.7.C · PDF p. 314
Spec wording
“C. Work Shifts: All work shall generally be done during administrative hours (8:00 AM to 4:30 PM) Monday - Friday excluding Federal Holidays. Any change in the work schedule must be approved in writing by the VA Representative.”
02 82 11 3.7.C314–
Test / cert.Test / cert.Re-InsulationTraditional Asbestos Abatement02 82 11 3.7.D · PDF p. 315-319
Spec wording
“D. Re-Insulation: If required as part of the contract, replace all asbestos containing insulation/fire-proofing with suitable non-asbestos material. Provide SDS's for all replacement materials in advance of installation for VA approval. Refer to Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION. ATTACHMENT #1 CERTIFICATE OF COMPLETION DATE: VA Project #: PROJECT NAME: Abatement Contractor: VAMC/ADDRESS: ...”
02 82 11 3.7.D315-319–
Test / cert.Test / cert.Test ReportsLead-Based Paint Removal And Disposal02 83 33.13 1.6.C · PDF p. 323
Spec wording
“C. Test Reports: Submit testing laboratory reports. 1. Submit air monitoring results within three working days, signed by testing laboratory employee performing air monitoring, employee analyzing sample, and CIH.”
02 83 33.13 1.6.C323–
TrainingTrainingCertificatesLead-Based Paint Removal And Disposal02 83 33.13 1.6.D · PDF p. 323
Spec wording
“D. Certificates: Certify completed lead training. 1. Submit certificate for each employee signed and dated by CIH and employee stating employee was trained.”
02 83 33.13 1.6.D323–
Record docsRecord docsRecord Documents:Lead-Based Paint Removal And Disposal02 83 33.13 1.6.F · PDF p. 324
Spec wording
“F. Record Documents: 1. Completed and signed hazardous waste manifest from waste transporter. 2. Hazardous waste transporter permit. 3. Disposal facility hazardous waste permit. 4. Toxicity Characteristic Leaching Procedure (TCLP) test results to determine if waste is hazardous. 5. Paint disposal facility receipts and disposition reports. 6. Certification of medical examinations. 7. Medical Opinion that employee is ...”
02 83 33.13 1.6.F324–
WarrantyWarrantyConstruction WarrantyLead-Based Paint Removal And Disposal02 83 33.13 1.8.A · PDF p. 326
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
02 83 33.13 1.8.A326–

Division 03 Concrete 4 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Testing agency maintaining active participation in Program of Cement and ...Cast-In-Place Concrete03 30 00 1.3.B · PDF p. 356
Spec wording
“B. Testing agency maintaining active participation in Program of Cement and Concrete Reference Laboratory (CCRL) of National Institute of Standards and Technology. Accompany request for approval of testing agency with a copy of Report of Latest Inspection of Laboratory Facilities by CCRL.”
03 30 00 1.3.B356–
Test / cert.Test / cert.Mill Test Reports:Cast-In-Place Concrete03 30 00 1.6.C · PDF p. 357
Spec wording
“C. Mill Test Reports: 1. Reinforcing Steel. 2. Cement.”
03 30 00 1.6.C357–
TrainingTrainingManufacturer's Certificates:Cast-In-Place Concrete03 30 00 1.6.D · PDF p. 357
Spec wording
“D. Manufacturer's Certificates: 1. Abrasive aggregate. 2. Lightweight aggregate for structural concrete. 3. Air-entraining admixture. 4. Chemical admixtures, including chloride ion content. 5. Waterproof paper for curing concrete. 6. Liquid membrane-forming compounds for curing concrete. 7. Non-shrinking grout. 8. Liquid hardener. 9. Waterstops. 10. Expansion joint filler. 11. Adhesive binder.”
03 30 00 1.6.D357binder
Test / cert.Test / cert.Test Report for Concrete Mix DesignsCast-In-Place Concrete03 30 00 1.6.F · PDF p. 358
Spec wording
“F. Test Report for Concrete Mix Designs: Trial mixes including water-cement ratio or water-fly ash ratio curves, concrete mix ingredients, and admixtures.”
03 30 00 1.6.F358–

Division 04 Masonry 8 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Test reports:Maintenance Of Masonry04 01 00 1.4.D · PDF p. 389
Spec wording
“D. Test reports: 1. Preconstruction test results of existing masonry mortar and units. 2. Recommended mortar mix and mortar materials sources.”
04 01 00 1.4.D389–
WarrantyWarrantyConstruction WarrantyMaintenance Of Masonry04 01 00 1.9.A · PDF p. 390
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
04 01 00 1.9.A390–
Test / cert.Test / cert.Test ReportsMasonry Mortaring04 05 13 1.4.C · PDF p. 393
Spec wording
“C. Test Reports: Certify each product complies with specifications. 1. Mortar. 2. Admixtures.”
04 05 13 1.4.C393–
WarrantyWarrantyConstruction WarrantyMasonry Mortaring04 05 13 1.8.A · PDF p. 395
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
04 05 13 1.8.A395–
Test / cert.Test / cert.Test ReportsMasonry Grouting04 05 16 1.4.C · PDF p. 398
Spec wording
“C. Test Reports: Certify each product complies with specifications. 1. Grout, each type. 2. Cement. 3. Aggregate.”
04 05 16 1.4.C398–
WarrantyWarrantyConstruction WarrantyMasonry Grouting04 05 16 1.8.A · PDF p. 399
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
04 05 16 1.8.A399–
Test / cert.Test / cert.Test reportsUnit Masonry04 20 00 1.4.E · PDF p. 403
Spec wording
“E. Test reports: Certify products comply with specifications.”
04 20 00 1.4.E403–
WarrantyWarrantyConstruction WarrantyUnit Masonry04 20 00 1.9.A · PDF p. 404
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
04 20 00 1.9.A404–

Division 06 Wood and plastics 1 item

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyConstruction WarrantyFinish Carpentry06 20 00 1.9.A · PDF p. 470
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
06 20 00 1.9.A470–

Division 07 Roofing, insulation and waterproofing 19 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyManufacturer's Literature and Data:Preparation For Re-Roofing07 01 50.19 1.5.C · PDF p. 478-479
Spec wording
“C. Manufacturer's Literature and Data: 1. Description of each product. 2. Description of temporary roof system and components. 3. List of patching materials. 4. Recover board fastening requirements. 5. Temporary roofing installation instructions and removal instructions. Preparation instructions to receive new roofing. 6. Existing roofing warrantor's instructions.”
07 01 50.19 1.5.C478-479–
WarrantyWarrantyField Inspection Reports:Preparation For Re-Roofing07 01 50.19 1.5.E · PDF p. 479
Spec wording
“E. Field Inspection Reports: 1. Certify warrantor inspected completed roofing and existing warranty remains in effect.”
07 01 50.19 1.5.E479–
WarrantyWarrantyConstruction WarrantyPreparation For Re-Roofing07 01 50.19 1.8.A · PDF p. 480
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
07 01 50.19 1.8.A480–
WarrantyWarrantyExisting WarrantiesPreparation For Re-Roofing07 01 50.19 1.8.B · PDF p. 480
Spec wording
“B. Existing Warranties: Perform work to maintain existing roofing warranty in effect. 1. Notify warrantor before beginning, and upon completion of reroofing. 2. Obtain warrantor's instructions for maintaining existing warranty.”
07 01 50.19 1.8.B480–
WarrantyWarrantyManufacturer's Literature and Data:Modified Bituminous Sheet Waterproofing07 13 52 1.4.C · PDF p. 483
Spec wording
“C. Manufacturer's Literature and Data: 1. Description of each product. 2. Installation instructions. 3. Warranty.”
07 13 52 1.4.C483–
Test / cert.Test / cert.Test reportsModified Bituminous Sheet Waterproofing07 13 52 1.4.E · PDF p. 483
Spec wording
“E. Test reports: Certify products comply with specifications.”
07 13 52 1.4.E483–
WarrantyWarrantyConstruction WarrantyModified Bituminous Sheet Waterproofing07 13 52 1.9.A · PDF p. 484
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
07 13 52 1.9.A484–
WarrantyWarrantyManufacturer's WarrantyModified Bituminous Sheet Waterproofing07 13 52 1.9.B · PDF p. 484
Spec wording
“B. Manufacturer's Warranty: Warrant waterproofing system against material and manufacturing defects and agree to repair any leak caused by a defect in the waterproofing system materials or workmanship of the installer. 1. Warranty Period: 10 years.”
07 13 52 1.9.B484–
WarrantyWarrantyConstruction WarrantyThermal Insulation07 21 13 1.7.A · PDF p. 489
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
07 21 13 1.7.A489–
Test / cert.Test / cert.Test reports:Fluid-Applied Membrane Air Barriers, Vapor Retarding07 27 27 1.4.D · PDF p. 497
Spec wording
“D. Test reports: 1. Submit field inspection and test reports.”
07 27 27 1.4.D497–
WarrantyWarrantyConstruction WarrantyFluid-Applied Membrane Air Barriers, Vapor Retarding07 27 27 1.9.A · PDF p. 499
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
07 27 27 1.9.A499–
Test / cert.Test / cert.Submit inspection and test reports to Contracting Officer's Representative within ...Fluid-Applied Membrane Air Barriers, Vapor Retarding07 27 27 3.3.E · PDF p. 502
Spec wording
“E. Submit inspection and test reports to Contracting Officer's Representative within seven calendar days of completing inspection and test.”
07 27 27 3.3.E502–
WarrantyWarrantyManufacturer's Literature and Data:Asphalt Shingles07 31 13 1.4.B · PDF p. 504
Spec wording
“B. Manufacturer's Literature and Data: 1. Description of each product. 2. Installation instructions. 3. Warranty.”
07 31 13 1.4.B504–
WarrantyWarrantyConstruction WarrantyAsphalt Shingles07 31 13 1.7.A · PDF p. 505
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
07 31 13 1.7.A505–
WarrantyWarrantyManufacturer's WarrantyAsphalt Shingles07 31 13 1.7.B · PDF p. 505
Spec wording
“B. Manufacturer's Warranty: Warrant asphalt shingles against material and manufacturing defects. 1. Material Warranty Period: 35 years. 2. Wind-Speed Warranty Period: Resist wind speeds up to 160 km/h (100 mph) for 15 years. 3. Algae-Resistance Warranty Period: No discoloration for 15 years.”
07 31 13 1.7.B505–
Test / cert.Test / cert.Furnish service of approved inspector to inspect firestopping in accordance ...Firestopping07 84 00 3.5.B · PDF p. 542
Spec wording
“B. Furnish service of approved inspector to inspect firestopping in accordance with ASTM E2393 and ASTM E2174 for firestop inspection, and document inspection results. Submit written reports indicating locations of and types of penetrations and type of firestopping used at each location; type is to be recorded by UL listed printed numbers.”
07 84 00 3.5.B542–
WarrantyWarrantyConstruction WarrantyJoint Sealants07 92 00 1.9.A · PDF p. 545
Spec wording
“A. Construction Warranty: Comply with FAR clause 52.246-21 "Warranty of Construction".”
07 92 00 1.9.A545–
WarrantyWarrantyManufacturer WarrantyJoint Sealants07 92 00 1.9.B · PDF p. 545
Spec wording
“B. Manufacturer Warranty: Manufacturer shall warranty their sealant for a minimum of five (5) years from the date of installation and final acceptance by the Government. Submit manufacturer warranty.”
07 92 00 1.9.B545–
Test / cert.Test / cert.Inspect tested joints and report on following:Joint Sealants07 92 00 3.6.C · PDF p. 553
Spec wording
“C. Inspect tested joints and report on following: 1. Whether sealants in joints connected to pulled-out portion failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each type of product and joint substrate. 2. Compare these results to determine if adhesion passes sealant manufacturer's field-adhesion hand-pull test criteria. 3. Whether sealants filled joint cavities ...”
07 92 00 3.6.C553–

Division 08 Doors, windows and hardware 35 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Test reportsHollow Metal Doors And Frames08 11 13 1.4.E · PDF p. 556-557
Spec wording
“E. Test reports: Certify each product complies products comply with specifications. 1. Sound rated door.”
08 11 13 1.4.E556-557–
WarrantyWarrantyConstruction WarrantyHollow Metal Doors And Frames08 11 13 1.8.A · PDF p. 558
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
08 11 13 1.8.A558–
Test / cert.Test / cert.Test ReportsInterior Wood Doors08 14 00 1.4.F · PDF p. 566
Spec wording
“F. Test Reports: Indicate each product complies with specifications. 1. Screw Holding Capacity Test. 2. Cycle-Slam Test. 3. Hinge-Loading Test.”
08 14 00 1.4.F566–
O&MO&MOperation and Maintenance Data:Interior Wood Doors08 14 00 1.4.G · PDF p. 566
Spec wording
“G. Operation and Maintenance Data: 1. Care instructions for each exposed finish product.”
08 14 00 1.4.G566–
WarrantyWarrantyConstruction WarrantyInterior Wood Doors08 14 00 1.9.A · PDF p. 567
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
08 14 00 1.9.A567–
WarrantyWarrantyManufacturer's WarrantyInterior Wood Doors08 14 00 1.9.B · PDF p. 567
Spec wording
“B. Manufacturer's Warranty: Warrant interior factory finished flush wood doors against material and manufacturing defects. 1. Warranty Period: Lifetime of original installation.”
08 14 00 1.9.B567–
WarrantyWarrantyConstruction WarrantyAccess Doors And Frames08 31 13 1.8.A · PDF p. 571
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
08 31 13 1.8.A571–
WarrantyWarrantyManufacturer's Literature and Data:Aluminum Windows08 51 13 1.5.C · PDF p. 587-588
Spec wording
“C. Manufacturer's Literature and Data: 1. Description of each product. 2. Installation instructions. 3. Warranty.”
08 51 13 1.5.C587-588–
Test / cert.Test / cert.Test reportsAluminum Windows08 51 13 1.5.E · PDF p. 588
Spec wording
“E. Test reports: Indicate each product complies with specifications. 1. Windows. 2. Operating hardware.”
08 51 13 1.5.E588–
WarrantyWarrantyConstruction WarrantyAluminum Windows08 51 13 1.8 · PDF p. 588-589
Spec wording
“Construction Warranty: FAR clause 52.246-21, "Warranty of Construction." Manufacturer's Warranty: Warrant windows against material and manufacturing defects. 1. Warranty Period: 10 years.”
08 51 13 1.8588-589–
Test / cert.Test / cert.Manufacturer's Certificates:Transaction Window08 56 53 1.5.B · PDF p. 595
Spec wording
“B. Manufacturer's Certificates: 1. Certificate stating that fire-protection and fire-resistive glazing units meet code requirements for fire-resistance-rated assembly and applicable safety glazing requirements. 2. Certificate on solar heat gain coefficient when value is specified. 3. Certificate on "R" value when value is specified. 4. Certificate test reports confirming compliance with specified bullet resistive ...”
08 56 53 1.5.B595–
WarrantyWarrantyManufacturer WarrantyTransaction Window08 56 53 1.5.C · PDF p. 596
Spec wording
“C. Manufacturer Warranty.”
08 56 53 1.5.C596–
Spare partsSpare partsManufacturer's Literature and Data:Transaction Window08 56 53 1.5.D · PDF p. 596
Spec wording
“D. Manufacturer's Literature and Data: 1. Glass, each kind required. 2. Insulating glass units. 3. Transparent (one-way vision glass) mirrors. 4. Elastic compound for metal sash glazing. 5. Putty, for wood sash glazing. 6. Glazing cushion. 7. Sealing compound. 8. Bullet resistive material. 9. Plastic glazing material, each type required.”
08 56 53 1.5.D596–
Test / cert.Test / cert.Preconstruction Adhesion and Compatibility Test ReportTransaction Window08 56 53 1.5.F · PDF p. 596
Spec wording
“F. Preconstruction Adhesion and Compatibility Test Report: Submit glazing sealant manufacturer's test report indicating glazing sealants were tested for adhesion to glass and glazing channel substrates and for compatibility with glass and other glazing materials.”
08 56 53 1.5.F596–
WarrantyWarrantyConstruction WarrantyTransaction Window08 56 53 1.8.A · PDF p. 597
Spec wording
“A. Construction Warranty: Comply with the FAR clause 52.246-21 "Warranty of Construction".”
08 56 53 1.8.A597–
WarrantyWarrantyManufacturer WarrantyTransaction Window08 56 53 1.8.B · PDF p. 597
Spec wording
“B. Manufacturer Warranty: Manufacturer shall warranty their glazing from the date of installation and final acceptance by the Government as follows. Submit manufacturer warranty. 1. Bullet resistive plastic material to remain visibly clear without discoloration for 10 years. 2. Workmanship Warranty: All materials shall be warranted against defects for a period of one (1) year for the date of receipt at the project ...”
08 56 53 1.8.B597–
WarrantyWarrantyConstruction WarrantyDetention Window Screens08 56 66 1.6.A · PDF p. 604
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
08 56 66 1.6.A604–
WarrantyWarrantyAutomatic door operators shall be subject to the terms of ...Door Hardware08 71 00 1.4.1 · PDF p. 609
Spec wording
“1. Automatic door operators shall be subject to the terms of FAR Clause 52.246-21, except that the Warranty period shall be two years in lieu of one year for all items except as noted below:”
08 71 00 1.4.1609–
WarrantyWarrantyLocks, latchsets, and panic hardwareDoor Hardware08 71 00 1.4.2 · PDF p. 609
Spec wording
“2. Locks, latchsets, and panic hardware: 5 years.”
08 71 00 1.4.2609–
WarrantyWarrantyDoor closers and continuous hingesDoor Hardware08 71 00 1.4.3 · PDF p. 609
Spec wording
“3. Door closers and continuous hinges: 10 years.”
08 71 00 1.4.3609–
O&MO&MIn accordance with Section 01 00 00, GENERAL REQUIREMENTS Article ...Door Hardware08 71 00 1.5.1 · PDF p. 609
Spec wording
“1. In accordance with Section 01 00 00, GENERAL REQUIREMENTS Article titled "INSTRUCTIONS", furnish maintenance manuals and instructions on all door hardware. Provide installation instructions with the submittal documentation.”
08 71 00 1.5.1609–
O&MO&MLigature Resistant Door Alarm Riser DiagramDoor Hardware08 71 00 1.6.3 · PDF p. 609
Spec wording
“3. Ligature Resistant Door Alarm Riser Diagram: Prepare and submit 6 copies of shop drawings of electric riser diagram complete with all required equipment components. Submission shall be in accordance with requirements per Section 01 33 23 for review and approval by project CO. Along with shop drawing submittal provide installation data. At completion of project provide CO with operation and maintenance manuals”
08 71 00 1.6.36096 copies
Test / cert.Test / cert.Certificate of Compliance and Test ReportsDoor Hardware08 71 00 1.6.7 · PDF p. 610
Spec wording
“7. Certificate of Compliance and Test Reports: Submit certificates that hardware conforms to the requirements specified herein. Certificates shall be accompanied by copies of reports as referenced. The testing shall have been conducted either in the manufacturer's plant and certified by an independent testing laboratory or conducted in an independent laboratory, within four years of submittal of reports for approval.”
08 71 00 1.6.7610–
Closeout stepCloseout stepHardware Set Symbols on DrawingsDoor Hardware08 71 00 1.9.1 · PDF p. 611
Spec wording
“1. Hardware Set Symbols on Drawings: Except for protective plates, door stops, mutes, thresholds and the like specified herein, hardware requirements for each door are indicated on drawings by symbols. Symbols for hardware sets consist of letters (e.g., "HW") followed by a number. Each number designates a set of hardware items applicable to a door type.”
08 71 00 1.9.1611–
Closeout stepCloseout stepKeyingDoor Hardware08 71 00 1.9.2 · PDF p. 611
Spec wording
“2. Keying: All cylinders shall be keyed into existing Grand Master Key System. Provide removable core cylinders that are removable only with a special key or tool without disassembly of knob or lockset. Cylinders shall be 6 or 7 pin type. Keying information shall be furnished at a later date by the COR.”
08 71 00 1.9.2611–
Spare partsSpare partsKeyingDoor Hardware08 71 00 1.9.3 · PDF p. 611
Spec wording
“3. Keying: A new Great Grandmaster key shall be established for this project. The key system shall be small format (Best size and profile) removable core type as previously described. The key blanks shall be protected by a utility patent with a minimum seven years remaining on the patent from the start of construction, and protected by contract-controlled distribution. The manufacturer shall furnish code pattern ...”
08 71 00 1.9.3611electronic format
Closeout stepCloseout stepKeying information will be furnished to the Contractor by the CORDoor Hardware08 71 00 1.9.4 · PDF p. 611
Spec wording
“4. Keying information will be furnished to the Contractor by the COR.”
08 71 00 1.9.4611–
Spare partsSpare partsSupply information regarding key control of cylinder locks to manufacturers ...Door Hardware08 71 00 1.9.5 · PDF p. 611
Spec wording
“5. Supply information regarding key control of cylinder locks to manufacturers of equipment having cylinder type locks. Notify COR immediately when and to whom keys or keying information is supplied. Return all such keys to the COR.”
08 71 00 1.9.5611–
TrainingTrainingDemonstrate efficacy of mechanical hardware and electrical, and electronic hardware ...Door Hardware08 71 00 3.4.1 · PDF p. 630
Spec wording
“1. Demonstrate efficacy of mechanical hardware and electrical, and electronic hardware systems, including adjustment and maintenance procedures, to satisfaction of Resident/Project Engineer and VA Locksmith.”
08 71 00 3.4.1630–
Test / cert.Test / cert.Manufacturer's Certificates:Glazing08 80 00 1.5.B · PDF p. 635-636
Spec wording
“B. Manufacturer's Certificates: 1. Certificate stating that fire-protection and fire-resistive glazing units meet code requirements for fire-resistance-rated assembly and applicable safety glazing requirements. 2. Certificate on solar heat gain coefficient when value is specified. 3. Certificate on "R" value when value is specified. 4. Certificate test reports confirming compliance with specified bullet resistive ...”
08 80 00 1.5.B635-636–
WarrantyWarrantyManufacturer WarrantyGlazing08 80 00 1.5.C · PDF p. 636
Spec wording
“C. Manufacturer Warranty.”
08 80 00 1.5.C636–
Spare partsSpare partsManufacturer's Literature and Data:Glazing08 80 00 1.5.D · PDF p. 636
Spec wording
“D. Manufacturer's Literature and Data: 1. Glass, each kind required. 2. Insulating glass units. 3. Transparent (one-way vision glass) mirrors. 4. Elastic compound for metal sash glazing. 5. Putty, for wood sash glazing. 6. Glazing cushion. 7. Sealing compound. 8. Bullet resistive material. 9. Plastic glazing material, each type required.”
08 80 00 1.5.D636–
Test / cert.Test / cert.Preconstruction Adhesion and Compatibility Test ReportGlazing08 80 00 1.5.F · PDF p. 637
Spec wording
“F. Preconstruction Adhesion and Compatibility Test Report: Submit glazing sealant manufacturer's test report indicating glazing sealants were tested for adhesion to glass and glazing channel substrates and for compatibility with glass and other glazing materials.”
08 80 00 1.5.F637–
WarrantyWarrantyConstruction WarrantyGlazing08 80 00 1.8.A · PDF p. 638
Spec wording
“A. Construction Warranty: Comply with the FAR clause 52.246-21 "Warranty of Construction".”
08 80 00 1.8.A638–
WarrantyWarrantyManufacturer WarrantyGlazing08 80 00 1.8.B · PDF p. 638
Spec wording
“B. Manufacturer Warranty: Manufacturer shall warranty their glazing from the date of installation and final acceptance by the Government as follows. Submit manufacturer warranty. 1. Bullet resistive plastic material to remain visibly clear without discoloration for 10 years. 2. Insulating glass units to remain sealed for ten (10) years. 3. Laminated glass units to remain laminated for five (5) years. 4. ...”
08 80 00 1.8.B638–

Division 09 Finishes 13 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyConstruction WarrantyCeramic/Porcelain Tiling09 30 13 1.6.A · PDF p. 679
Spec wording
“A. Construction Warranty: Comply with FAR clause 52.246-21, "Warranty of Construction".”
09 30 13 1.6.A679–
Test / cert.Test / cert.Product Test ReportsAcoustical Metal Pan Ceilings09 51 33 1.4.D · PDF p. 698
Spec wording
“D. Product Test Reports: For each acoustical metal pan ceiling, for tests performed by manufacturer and witnessed by a qualified testing agency.”
09 51 33 1.4.D698–
Test / cert.Test / cert.Field quality-control reportsAcoustical Metal Pan Ceilings09 51 33 1.4.F · PDF p. 698
Spec wording
“F. Field quality-control reports.”
09 51 33 1.4.F698–
O&MO&MMaintenance DataAcoustical Metal Pan Ceilings09 51 33 1.5.A · PDF p. 698
Spec wording
“A. Maintenance Data: For finishes to include in maintenance manuals.”
09 51 33 1.5.A698–
Spare partsSpare partsFurnish extra materials that match products installed and that are ...Acoustical Metal Pan Ceilings09 51 33 1.6.A · PDF p. 698
Spec wording
“A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Acoustical Metal Pans: Full-size units with sound absorber equal to (5) percent of quantity installed. 2. Suspension-System Components: Quantity of each grid, exposed molding, and trim equal to Five (5) percent of quantity installed. 3. Hold-Down ...”
09 51 33 1.6.A698Full-size
O&MO&MOperation and Maintenance Data:Resilient Base And Accessories09 65 13 1.4.E · PDF p. 710
Spec wording
“E. Operation and Maintenance Data: 1. Care instructions for each exposed finish product.”
09 65 13 1.4.E710–
WarrantyWarrantyConstruction WarrantyResilient Base And Accessories09 65 13 1.8.A · PDF p. 710
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
09 65 13 1.8.A710–
Test / cert.Test / cert.Test Reports:Resilient Tile Flooring09 65 19 1.3.F · PDF p. 713
Spec wording
“F. Test Reports: 1. Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per ASTM F510/F510M. 2. Moisture and pH test results as per Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.”
09 65 19 1.3.F713–
WarrantyWarrantyConstruction WarrantyResilient Tile Flooring09 65 19 1.7.A · PDF p. 715
Spec wording
“A. Construction Warranty: Comply with FAR clause 52.246-21, "Warranty of Construction".”
09 65 19 1.7.A715–
O&MO&MMaintenance DataCarpeting09 68 00 1.4.E · PDF p. 721
Spec wording
“E. Maintenance Data: Carpet manufacturer's maintenance instructions describing recommended type of cleaning equipment and material, spotting and cleaning methods and cleaning cycles.”
09 68 00 1.4.E721–
WarrantyWarrantyManufacturer's warrantyCarpeting09 68 00 1.4.G · PDF p. 721
Spec wording
“G. Manufacturer's warranty.”
09 68 00 1.4.G721–
WarrantyWarrantyConstruction WarrantyCarpeting09 68 00 1.7.A · PDF p. 722
Spec wording
“A. Construction Warranty: Comply with FAR clause 52.246-21, "Warranty of Construction".”
09 68 00 1.7.A722–
WarrantyWarrantyManufacturer WarrantyCarpeting09 68 00 1.7.B · PDF p. 722
Spec wording
“B. Manufacturer Warranty: Manufacturer shall warranty their carpet for a minimum of ten (10) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.”
09 68 00 1.7.B722–

Division 10 Specialties 5 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyConstruction WarrantySignage10 14 00 1.6.A · PDF p. 754
Spec wording
“A. Construction Warranty: Comply with FAR clause 52.246-21, "Warranty of Construction".”
10 14 00 1.6.A754–
O&MO&MOperation and Maintenance Data:Toilet, Bath, And Laundry Accessories10 28 00 1.4.G · PDF p. 766
Spec wording
“G. Operation and Maintenance Data: 1. Care instructions for each exposed finish product.”
10 28 00 1.4.G766–
WarrantyWarrantyConstruction WarrantyToilet, Bath, And Laundry Accessories10 28 00 1.8.A · PDF p. 766
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
10 28 00 1.8.A766–
O&MO&MMaintenance dataMetal Lockers10 51 13 1.4.D · PDF p. 776
Spec wording
“D. Maintenance data: For Adjusting, repairing, and replacement of the doors, drawers, and mechanisms which shall include a maintenance manual with product specifications.”
10 51 13 1.4.D776–
WarrantyWarrantySpecial WarrantyMetal Lockers10 51 13 1.9.A · PDF p. 777
Spec wording
“A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal lockers that fail in materials or workmanship, excluding finish, within specified warranty period. 1. Failures include, but are not limited to, the following: a. Structural failures. b. Faulty operation of latches and other door hardware. 2. Damage from deliberate destruction and vandalism is ...”
10 51 13 1.9.A777–

Division 12 Furnishings 5 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyConstruction WarrantyManufactured Wood Casework12 32 00 1.5.A · PDF p. 785
Spec wording
“A. Construction Warranty: Comply with FAR clause 52.246-21 "Warranty of Construction".”
12 32 00 1.5.A785–
WarrantyWarrantyManufacturer WarrantyManufactured Wood Casework12 32 00 1.5.B · PDF p. 785
Spec wording
“B. Manufacturer Warranty: Manufacturer shall warranty their wood casework for a minimum of five (5) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.”
12 32 00 1.5.B785–
Closeout stepCloseout stepProvide operational and cleaning manuals and verbal instructions in accordance ...Manufactured Wood Casework12 32 00 3.7.A · PDF p. 792
Spec wording
“A. Provide operational and cleaning manuals and verbal instructions in accordance with Article INSTRUCTIONS, SECTION 01 00 00, GENERAL REQUIREMENTS.”
12 32 00 3.7.A792–
TrainingTrainingProvide in service training both prior to and after facility ...Manufactured Wood Casework12 32 00 3.7.B · PDF p. 792
Spec wording
“B. Provide in service training both prior to and after facility opening. Coordinate in service activities with COR.”
12 32 00 3.7.B792–
Closeout stepCloseout stepCommencing at least seven (7) days prior to opening of ...Manufactured Wood Casework12 32 00 3.7.C · PDF p. 792
Spec wording
“C. Commencing at least seven (7) days prior to opening of facility, provide one (1) four (4) hour day of on-site orientation and technical instruction on use and cleaning procedures application to products and systems specified herein.”
12 32 00 3.7.C792–

Division 21 Fire suppression (sprinklers) 2 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MSubmit as one package in accordance with Section 01 33 ...Wet-Pipe Sprinkler Systems21 13 13 1.4.A · PDF p. 802-804
Spec wording
“A. Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting ...”
21 13 13 1.4.A802-804binders; electronically; pdf; full size; One complete set; AutoCAD
O&MO&MFurnish the services of a competent instructor for not less ...Wet-Pipe Sprinkler Systems21 13 13 3.3 · PDF p. 811
Spec wording
“Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.”
21 13 13 3.3811–

Division 22 Plumbing 60 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MPlumbing Maintenance Data and Operating Instructions:Common Work Results For Plumbing22 05 11 1.4.J · PDF p. 821
Spec wording
“J. Plumbing Maintenance Data and Operating Instructions: 1. Maintenance and operating manuals in accordance with Section 01 00 00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment. 2. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: a. Include complete list indicating all ...”
22 05 11 1.4.J821–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Common Work Results For Plumbing22 05 11 1.7.A · PDF p. 826
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
22 05 11 1.7.A826–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Common Work Results For Plumbing22 05 11 1.7.B · PDF p. 826
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions will be in electronic version on CD or DVD. All aspects of system operation and maintenance procedures, including applicable piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation will be included in ...”
22 05 11 1.7.B826electronic version; CD; DVD
Record docsRecord docsThe installing Contractor will maintain as-built drawings of each completed ...Common Work Results For Plumbing22 05 11 1.7.C · PDF p. 826
Spec wording
“C. The installing Contractor will maintain as-built drawings of each completed phase for verification; and, will provide the complete set at the time of final systems certification testing. Should the installing Contractor engage the testing company to provide as-built or any portion thereof, it will not be deemed a conflict of interest or breach of the ‘third party testing company' requirement. Provide record ...”
22 05 11 1.7.C826AutoCAD; CD; DVD; CAD
Record docsRecord docsThe as-built drawings will indicate the location and type of ...Common Work Results For Plumbing22 05 11 1.7.D · PDF p. 826
Spec wording
“D. The as-built drawings will indicate the location and type of all lockout/tagout points for all energy sources for all equipment and pumps to include breaker location and numbers, valve tag numbers, etc. Coordinate lockout/tagout procedures and practices with local VA requirements.”
22 05 11 1.7.D826–
Record docsRecord docsCertification documentation will be provided to COR 21 working days ...Common Work Results For Plumbing22 05 11 1.7.E · PDF p. 826-827
Spec wording
“E. Certification documentation will be provided to COR 21 working days prior to submitting the request for final inspection. The documentation will include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and provide documentation/certification that all results of tests were within limits specified. Test results will ...”
22 05 11 1.7.E826-827–
Test / cert.Test / cert.Startup of equipment will be performed as described in the ...Common Work Results For Plumbing22 05 11 3.7.A · PDF p. 840
Spec wording
“A. Startup of equipment will be performed as described in the equipment specifications. Vibration within specified tolerance will be verified prior to extended operation. Temporary use of equipment is specified in Section 01 00 00, GENERAL REQUIREMENTS, Article, TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT.”
22 05 11 3.7.A840–
O&MO&MAll new and temporary equipment and all elements of each ...Common Work Results For Plumbing22 05 11 3.9.A · PDF p. 840
Spec wording
“A. All new and temporary equipment and all elements of each assembly will be included.”
22 05 11 3.9.A840–
O&MO&MData sheet on each device listing model, size, capacity, pressure, ...Common Work Results For Plumbing22 05 11 3.9.B · PDF p. 840
Spec wording
“B. Data sheet on each device listing model, size, capacity, pressure, speed, horsepower, impeller size, and other information will be included.”
22 05 11 3.9.B840–
O&MO&MManufacturer's installation, maintenance, repair, and operation instructions for each device ...Common Work Results For Plumbing22 05 11 3.9.C · PDF p. 840
Spec wording
“C. Manufacturer's installation, maintenance, repair, and operation instructions for each device will be included. Assembly drawings and parts lists will also be included. A summary of operating precautions and reasons for precautions will be included in the Operations and Maintenance Manual.”
22 05 11 3.9.C840–
O&MO&MLubrication instructions, type and quantity of lubricant will be included ...Common Work Results For Plumbing22 05 11 3.9.D · PDF p. 841
Spec wording
“D. Lubrication instructions, type and quantity of lubricant will be included.”
22 05 11 3.9.D841–
O&MO&MSchematic diagrams and wiring diagrams of all control systems corrected ...Common Work Results For Plumbing22 05 11 3.9.E · PDF p. 841
Spec wording
“E. Schematic diagrams and wiring diagrams of all control systems corrected to include all field modifications will be included.”
22 05 11 3.9.E841–
O&MO&MSet points of all interlock devices will be listedCommon Work Results For Plumbing22 05 11 3.9.F · PDF p. 841
Spec wording
“F. Set points of all interlock devices will be listed.”
22 05 11 3.9.F841–
O&MO&MTrouble-shooting guide for the control system troubleshooting will be inserted ...Common Work Results For Plumbing22 05 11 3.9.G · PDF p. 841
Spec wording
“G. Trouble-shooting guide for the control system troubleshooting will be inserted into the Operations and Maintenance Manual.”
22 05 11 3.9.G841–
O&MO&MThe control system sequence of operation corrected with submittal review ...Common Work Results For Plumbing22 05 11 3.9.H · PDF p. 841
Spec wording
“H. The control system sequence of operation corrected with submittal review comments will be inserted into the Operations and Maintenance Manual.”
22 05 11 3.9.H841–
O&MO&MEmergency procedures for shutdown and startup of equipment and systemsCommon Work Results For Plumbing22 05 11 3.9.I · PDF p. 841
Spec wording
“I. Emergency procedures for shutdown and startup of equipment and systems.”
22 05 11 3.9.I841–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...Common Work Results For Plumbing22 05 11 3.10.A · PDF p. 841
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 05 11 3.10.A841–
O&MO&MComplete operating and maintenance manual shall including wiring diagrams, technical ...Meters And Gauges For Plumbing Piping22 05 19 1.4.D · PDF p. 843
Spec wording
“D. Complete operating and maintenance manual shall including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the system. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and ...”
22 05 19 1.4.D843–
Record docsRecord docsComply with requirements in Paragraph "AS-BUILT DOCUMENTATION" of Section 22 ...Meters And Gauges For Plumbing Piping22 05 19 1.5.A · PDF p. 843
Spec wording
“A. Comply with requirements in Paragraph "AS-BUILT DOCUMENTATION" of Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.”
22 05 19 1.5.A843–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Meters And Gauges For Plumbing Piping22 05 19 3.3.A · PDF p. 846
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
22 05 19 3.3.A846–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Meters And Gauges For Plumbing Piping22 05 19 3.3.B · PDF p. 846
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
22 05 19 3.3.B846–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...Meters And Gauges For Plumbing Piping22 05 19 3.4.A · PDF p. 846
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 05 19 3.4.A846–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...General-Duty Valves For Plumbing Piping22 05 23 1.4.E · PDF p. 849-850
Spec wording
“E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance. 4. Piping ...”
22 05 23 1.4.E849-850–
Test / cert.Test / cert.Testing and adjusting of balancing valves shall be performed by ...General-Duty Valves For Plumbing Piping22 05 23 3.4.D · PDF p. 856
Spec wording
“D. Testing and adjusting of balancing valves shall be performed by an independent NEBB Accredited Test and Balance Contractor. A final settings and flow report shall be submitted to the VA Contracting Officer's Representative (COR).”
22 05 23 3.4.D856–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...General-Duty Valves For Plumbing Piping22 05 23 3.5.A · PDF p. 856
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
22 05 23 3.5.A856–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...General-Duty Valves For Plumbing Piping22 05 23 3.5.B · PDF p. 856
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
22 05 23 3.5.B856–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...General-Duty Valves For Plumbing Piping22 05 23 3.6.A · PDF p. 856
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 05 23 3.6.A856–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Plumbing Insulation22 07 11 1.6.A · PDF p. 863
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
22 07 11 1.6.A863–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Plumbing Insulation22 07 11 1.6.B · PDF p. 863
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be in electronic version on compact disc or DVD. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the ...”
22 07 11 1.6.B863electronic version; DVD
Record docsRecord docsThe installing contractor shall maintain as-built drawings of each completed ...Plumbing Insulation22 07 11 1.6.C · PDF p. 863
Spec wording
“C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in Auto-CAD provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be ...”
22 07 11 1.6.C863CAD; DVD
Record docsRecord docsCertification documentation shall be provided prior to submitting the request ...Plumbing Insulation22 07 11 1.6.D · PDF p. 863
Spec wording
“D. Certification documentation shall be provided prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certification that all results of tests were within limits specified.”
22 07 11 1.6.D863–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Facility Water Distribution22 11 00 1.4.D · PDF p. 878
Spec wording
“D. Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replacement parts: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
22 11 00 1.4.D878–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Facility Water Distribution22 11 00 1.7.A · PDF p. 878
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
22 11 00 1.7.A878–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Facility Water Distribution22 11 00 1.7.B · PDF p. 878-879
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be in electronic version on compact disc or DVD. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the ...”
22 11 00 1.7.B878-879electronic version; DVD
Record docsRecord docsThe installing contractor shall maintain as-built drawings of each completed ...Facility Water Distribution22 11 00 1.7.C · PDF p. 879
Spec wording
“C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in Auto-CAD provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be ...”
22 11 00 1.7.C879CAD; DVD
Record docsRecord docsCertification documentation shall be provided to COR 10 working days ...Facility Water Distribution22 11 00 1.7.D · PDF p. 879
Spec wording
“D. Certification documentation shall be provided to COR 10 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certificate if applicable that all results of tests were within limits specified. If a certificate is not ...”
22 11 00 1.7.D879–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...Facility Water Distribution22 11 00 3.5.A · PDF p. 885
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 11 00 3.5.A885–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Domestic Water Pumps22 11 23 1.4.F · PDF p. 888
Spec wording
“F. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
22 11 23 1.4.F888–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Domestic Water Pumps22 11 23 1.6.A · PDF p. 889
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
22 11 23 1.6.A889–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Domestic Water Pumps22 11 23 1.6.B · PDF p. 890
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be in electronic version on compact disc or DVD. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the ...”
22 11 23 1.6.B890electronic version; DVD
Record docsRecord docsThe installing contractor shall maintain as-built drawings of each completed ...Domestic Water Pumps22 11 23 1.6.C · PDF p. 890
Spec wording
“C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in Auto-CAD provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be ...”
22 11 23 1.6.C890CAD; DVD
Record docsRecord docsCertification documentation shall be provided to COR 10 working days ...Domestic Water Pumps22 11 23 1.6.D · PDF p. 890
Spec wording
“D. Certification documentation shall be provided to COR 10 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certification that all results of tests were within limits specified.”
22 11 23 1.6.D890–
Test / cert.Test / cert.Make tests as recommended by product manufacturer and listed standards ...Domestic Water Pumps22 11 23 3.1.A · PDF p. 892
Spec wording
“A. Make tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
22 11 23 3.1.A892–
Test / cert.Test / cert.System TestDomestic Water Pumps22 11 23 3.1.B · PDF p. 892
Spec wording
“B. System Test: After installation is completed provide an operational test of the completed system including flow rates, pressure compliance, alarms and all control functions.”
22 11 23 3.1.B892–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Domestic Water Pumps22 11 23 3.1.C · PDF p. 892
Spec wording
“C. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
22 11 23 3.1.C892–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Domestic Water Pumps22 11 23 3.1.D · PDF p. 892
Spec wording
“D. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Contractor shall provide a minimum of 10 working days prior to startup and testing.”
22 11 23 3.1.D892–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...Domestic Water Pumps22 11 23 3.3.A · PDF p. 892
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 11 23 3.3.A892–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Facility Sanitary And Vent Piping22 13 00 1.4.E · PDF p. 897
Spec wording
“E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
22 13 00 1.4.E897–
Record docsRecord docsComply with requirements in Paragraph "AS-BUILT DOCUMENTATION" of Section 22 ...Facility Sanitary And Vent Piping22 13 00 1.6.A · PDF p. 897
Spec wording
“A. Comply with requirements in Paragraph "AS-BUILT DOCUMENTATION" of Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.”
22 13 00 1.6.A897–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...Facility Sanitary And Vent Piping22 13 00 3.6.A · PDF p. 904
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 13 00 3.6.A904–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Electric Domestic Water Heaters22 33 00 1.4.G · PDF p. 907
Spec wording
“G. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
22 33 00 1.4.G907–
Record docsRecord docsComply with requirements in Paragraph AS-BUILT DOCUMENTATION of Section 22 ...Electric Domestic Water Heaters22 33 00 1.6.A · PDF p. 908
Spec wording
“A. Comply with requirements in Paragraph AS-BUILT DOCUMENTATION of Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.”
22 33 00 1.6.A908–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Electric Domestic Water Heaters22 33 00 3.4.A · PDF p. 911
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
22 33 00 3.4.A911–
Test / cert.Test / cert.The tests shall include system capacity, control function, and alarm ...Electric Domestic Water Heaters22 33 00 3.4.B · PDF p. 911
Spec wording
“B. The tests shall include system capacity, control function, and alarm functions.”
22 33 00 3.4.B911–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Electric Domestic Water Heaters22 33 00 3.4.C · PDF p. 911
Spec wording
“C. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
22 33 00 3.4.C911–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Plumbing Fixtures22 40 00 1.6.A · PDF p. 914
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
22 40 00 1.6.A914–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Plumbing Fixtures22 40 00 1.6.B · PDF p. 914
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions will be in electronic version on compact disc or DVD. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation will be included in the operation ...”
22 40 00 1.6.B914electronic version; DVD
Record docsRecord docsThe installing contractor will maintain as-built drawings of each completed ...Plumbing Fixtures22 40 00 1.6.C · PDF p. 914
Spec wording
“C. The installing contractor will maintain as-built drawings of each completed phase for verification; and, will provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in AutoCAD provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it will not be deemed a ...”
22 40 00 1.6.C914AutoCAD; DVD
Record docsRecord docsCertification documentation will be provided to COR 10 working days ...Plumbing Fixtures22 40 00 1.6.D · PDF p. 914
Spec wording
“D. Certification documentation will be provided to COR 10 working days prior to submitting the request for final inspection. The documentation will include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certification that all results of tests were within limits specified.”
22 40 00 1.6.D914–
TrainingTrainingProvide 0.5 hour demonstration and plumbing systems review for VA ...Plumbing Fixtures22 40 00 3.5.A · PDF p. 921
Spec wording
“A. Provide 0.5 hour demonstration and plumbing systems review for VA staff.”
22 40 00 3.5.A921–

Division 23 HVAC 177 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MHVAC Maintenance Data and Operating Instructions:Common Work Results For Hvac23 05 11 1.4.M · PDF p. 930-931
Spec wording
“M. HVAC Maintenance Data and Operating Instructions: 1. Maintenance and operating manuals in accordance with Section 01 00 00, GENERAL REQUIREMENTS, paragraph INSTRUCTIONS for systems and equipment. 2. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: a. Include complete list indicating all components ...”
23 05 11 1.4.M930-931–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Common Work Results For Hvac23 05 11 1.4.O · PDF p. 931
Spec wording
“O. Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 11 1.4.O931–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Common Work Results For Hvac23 05 11 1.4.P · PDF p. 931
Spec wording
“P. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 11 1.4.P931–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Common Work Results For Hvac23 05 11 1.7.A · PDF p. 935
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
23 05 11 1.7.A935–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Common Work Results For Hvac23 05 11 1.7.B · PDF p. 935-936
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions shall be in electronic version on CD or DVD inserted into a three-ring binder. All aspects of system operation and maintenance procedures, including applicable piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and ...”
23 05 11 1.7.B935-936electronic version; CD; DVD; three-ring; binder
Record docsRecord docsThe installing Contractor shall maintain as-built drawings of each completed ...Common Work Results For Hvac23 05 11 1.7.C · PDF p. 936
Spec wording
“C. The installing Contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. Should the installing Contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company' requirement. Provide record ...”
23 05 11 1.7.C936AutoCAD; CD; DVD; CAD
Record docsRecord docsThe as-built drawings shall indicate the location and type of ...Common Work Results For Hvac23 05 11 1.7.D · PDF p. 936
Spec wording
“D. The as-built drawings shall indicate the location and type of all lockout/tagout points for all energy sources for all equipment and pumps to include breaker location and numbers, valve tag numbers, etc. Coordinate lockout/tagout procedures and practices with local VA requirements.”
23 05 11 1.7.D936–
Record docsRecord docsCertification documentation shall be provided to COR 21 working days ...Common Work Results For Hvac23 05 11 1.7.E · PDF p. 936-937
Spec wording
“E. Certification documentation shall be provided to COR 21 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and provide documentation/certification that all results of tests were within limits specified. Test results shall ...”
23 05 11 1.7.E936-937–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Common Work Results For Hvac23 05 11 3.11.A · PDF p. 955
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 05 11 3.11.A955–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Common Work Results For Hvac23 05 11 3.11.B · PDF p. 955
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 05 11 3.11.B955–
Test / cert.Test / cert.The CxA will observe startup and Contractor testing of selected ...Common Work Results For Hvac23 05 11 3.11.C · PDF p. 955
Spec wording
“C. The CxA will observe startup and Contractor testing of selected equipment. Coordinate the startup and Contractor testing schedules with COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 05 11 3.11.C955–
Test / cert.Test / cert.Startup of equipment shall be performed as described in equipment ...Common Work Results For Hvac23 05 11 3.11.D · PDF p. 955
Spec wording
“D. Startup of equipment shall be performed as described in equipment specifications. Vibration within specified tolerance shall be verified prior to extended operation. Temporary use of equipment is specified in Section 01 00 00, GENERAL REQUIREMENTS, paragraph TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT.”
23 05 11 3.11.D955–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Common Work Results For Hvac23 05 11 3.13.A · PDF p. 956
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 11 3.13.A956–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Common Work Results For Hvac23 05 11 3.13.B · PDF p. 956
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 05 11 3.13.B956–
TrainingTrainingProvide services of manufacturer's technical representative for 4hours to instruct ...Common Work Results For Hvac23 05 11 3.14.A · PDF p. 956
Spec wording
“A. Provide services of manufacturer's technical representative for 4hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 05 11 3.14.A956–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Common Work Results For Hvac23 05 11 3.14.B · PDF p. 956
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 11 3.14.B956–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 1.4.F · PDF p. 958-959
Spec wording
“F. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
23 05 12 1.4.F958-959–
Test / cert.Test / cert.CertificationGeneral Motor Requirements For Hvac And Steam Generation Equipment23 05 12 1.4.G · PDF p. 959
Spec wording
“G. Certification: Two weeks prior to final inspection, unless otherwise noted, certification shall be submitted to the COR stating that the motors have been properly applied, installed, adjusted, lubricated, and tested.”
23 05 12 1.4.G959–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 1.4.H · PDF p. 959
Spec wording
“H. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 12 1.4.H959–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 1.4.I · PDF p. 959
Spec wording
“I. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 12 1.4.I959–
Record docsRecord docsComply with requirements in Paragraph "AS-BUILT DOCUMENTATION" in Section 23 ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 1.5.A · PDF p. 959
Spec wording
“A. Comply with requirements in Paragraph "AS-BUILT DOCUMENTATION" in Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 05 12 1.5.A959–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.3.A · PDF p. 965
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 05 12 3.3.A965–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.3.B · PDF p. 965
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 05 12 3.3.B965–
Test / cert.Test / cert.The CxA shall observe startup and contractor testing of selected ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.3.C · PDF p. 965
Spec wording
“C. The CxA shall observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 05 12 3.3.C965–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.4.A · PDF p. 965
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 12 3.4.A965–
Test / cert.Test / cert.Components provided under this section of the specification shall be ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.4.B · PDF p. 965
Spec wording
“B. Components provided under this section of the specification shall be tested as part of a greater system.”
23 05 12 3.4.B965–
TrainingTrainingProvide services of manufacturer's technical representative for 1 hour to ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.5.A · PDF p. 965
Spec wording
“A. Provide services of manufacturer's technical representative for 1 hour to instruct each VA personnel responsible in operation and maintenance of the system.”
23 05 12 3.5.A965–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...General Motor Requirements For Hvac And Steam Generation Equipment23 05 12 3.5.B · PDF p. 965
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 12 3.5.B965–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Noise And Vibration Control For Hvac Piping And Equipment23 05 41 1.6.A · PDF p. 968
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC. 23 05 41 3”
23 05 41 1.6.A968–
Test / cert.Test / cert.Submit the following for review and approval:Testing, Adjusting, And Balancing For Hvac23 05 93 1.4.E · PDF p. 975
Spec wording
“E. Submit the following for review and approval: 1. Design Review Report within 90 days for conventional design projects after the system layout on air and water side is completed by the Contractor. 2. Systems inspection report on equipment and installation for conformance with design. 3. Duct Air Leakage Test Report. 4. Systems Readiness Report. 5. Intermediate and Final TAB reports covering flow balance and ...”
23 05 93 1.4.E975–
Test / cert.Test / cert.Prior to request for Final or Partial Final inspection, submit ...Testing, Adjusting, And Balancing For Hvac23 05 93 1.4.F · PDF p. 975
Spec wording
“F. Prior to request for Final or Partial Final inspection, submit completed Test and Balance report for the area with noted critical paths.”
23 05 93 1.4.F975–
Test / cert.Test / cert.Record initial measurements for each unit of equipment on test ...Testing, Adjusting, And Balancing For Hvac23 05 93 3.8.B · PDF p. 981-982
Spec wording
“B. Record initial measurements for each unit of equipment on test forms and submit a report to the COR. Where vibration readings exceed the allowable tolerance Contractor shall be directed to correct the problem. The TAB agency shall verify that the corrections are done and submit a final report to the COR.”
23 05 93 3.8.B981-982–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Testing, Adjusting, And Balancing For Hvac23 05 93 3.14.A · PDF p. 984
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 05 93 3.14.A984–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Testing, Adjusting, And Balancing For Hvac23 05 93 3.14.B · PDF p. 984
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 05 93 3.14.B984–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of section ...Hvac And Boiler Plant Insulation23 07 11 3.7.A · PDF p. 1005
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the Commissioning Agent.”
23 07 11 3.7.A1005–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Hvac And Boiler Plant Insulation23 07 11 3.7.B · PDF p. 1005
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system. Refer to section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.”
23 07 11 3.7.B1005–
Test / cert.Test / cert.The commissioning process requires review of selected Submittals that pertain ...Commissioning Of Hvac Systems23 08 00 1.6.A · PDF p. 1009
Spec wording
“A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.”
23 08 00 1.6.A1009–
Test / cert.Test / cert.The commissioning process requires Submittal review simultaneously with engineering review. ...Commissioning Of Hvac Systems23 08 00 1.6.B · PDF p. 1009
Spec wording
“B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.”
23 08 00 1.6.B1009–
Test / cert.Test / cert.The Commissioning Process includes Systems Functional Performance Testing that is ...Commissioning Of Hvac Systems23 08 00 3.4.A · PDF p. 1011
Spec wording
“A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. ...”
23 08 00 3.4.A1011–
TrainingTrainingTraining of the VA operation and maintenance personnel is required ...Commissioning Of Hvac Systems23 08 00 3.5.A · PDF p. 1011-1012
Spec wording
“A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the ...”
23 08 00 3.5.A1011-1012–
WarrantyWarrantyLabor and materials for control systems shall be warranted for ...Direct-Digital Control System For Hvac23 09 23 1.6 · PDF p. 1026
Spec wording
“Labor and materials for control systems shall be warranted for a period as specified under Warranty in FAR clause 52.246-21. Control system failures during the warranty period shall be adjusted, repaired, or replaced at no cost or reduction in service to the owner. The system includes all computer equipment, transmission equipment, and all sensors and control devices. Deleted Controls subcontractor shall be ...”
23 09 23 1.61026–
WarrantyWarrantySubmit shop drawings in accordance with Section 01 33 23, ...Direct-Digital Control System For Hvac23 09 23 1.7 · PDF p. 1026-1028
Spec wording
“Submit shop drawings in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Information and material submitted under this section shall be marked "SUBMITTED UNDER SECTION 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC", with applicable paragraph identification. Manufacturer's Literature and Data Including: 1. A wiring diagram for each type of input device and output device including DDC ...”
23 09 23 1.71026-1028three (3) copies; one (1) set; CD-ROM; CAD; One copy
TrainingTrainingInstructions to VA operations personnelDirect-Digital Control System For Hvac23 09 23 1.8 · PDF p. 1029-1030
Spec wording
“Instructions to VA operations personnel: Perform in accordance with Article, INSTRUCTIONS, in Specification Section 01 00 00, GENERAL REQUIREMENTS, and as noted below. 1. First Phase: Formal instructions to the VA facilities personnel for a total of 8 hours, given in multiple training sessions (each no longer than four hours in length), conducted sometime between the completed installation and prior to the ...”
23 09 23 1.81029-1030–
TrainingTrainingAs part of final system acceptance, a system demonstration is ...Direct-Digital Control System For Hvac23 09 23 3.2 · PDF p. 1050-1052
Spec wording
“As part of final system acceptance, a system demonstration is required (see below). Prior to start of this demonstration, the contractor is to perform a complete validation of all aspects of the controls and instrumentation system. When formal commissioning is included in the project the system validation/test shall be part of the commissioning and shall be witnessed by the CxA. Validation 1. Prepare and submit for ...”
23 09 23 3.21050-1052–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Direct-Digital Control System For Hvac23 09 23 3.3 · PDF p. 1052
Spec wording
“Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part. When any defects are detected, correct defects and repeat test at no additional cost or time to ...”
23 09 23 3.31052–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Direct-Digital Control System For Hvac23 09 23 3.4 · PDF p. 1053
Spec wording
“Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS. Components provided under this section of the specification will be tested as part of a larger system.”
23 09 23 3.41053–
TrainingTrainingProvide services of manufacturer's technical representative for 8 hourss to ...Direct-Digital Control System For Hvac23 09 23 3.5 · PDF p. 1053
Spec wording
“Provide services of manufacturer's technical representative for 8 hourss to instruct each VA personnel responsible in the operation and maintenance of the system. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 09 23 3.51053–
Record docsRecord docsAs-Built Piping DiagramsHydronic Piping23 21 13 1.4.G · PDF p. 1058
Spec wording
“G. As-Built Piping Diagrams: Provide drawings as follows for heating hot water system and other piping systems and equipment. 1. 1wall-mounted stick file with complete set of prints. 2. 1 complete set of reproducible drawings. 3. 1 complete set of drawings in electronic AutoCAD and pdf format.”
23 21 13 1.4.G10581 complete set; AutoCAD; pdf
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Hydronic Piping23 21 13 1.4.H · PDF p. 1058
Spec wording
“H. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
23 21 13 1.4.H1058–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Hydronic Piping23 21 13 1.4.I · PDF p. 1058
Spec wording
“I. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 13 1.4.I1058–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Hydronic Piping23 21 13 1.4.J · PDF p. 1058
Spec wording
“J. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 13 1.4.J1058–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Hydronic Piping23 21 13 1.6.A · PDF p. 1059
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 21 13 1.6.A1059–
Spare partsSpare partsFor mechanical pressed sealed fittings provide tools required for each ...Hydronic Piping23 21 13 1.7.A · PDF p. 1059
Spec wording
“A. For mechanical pressed sealed fittings provide tools required for each pipe size used at the facility.”
23 21 13 1.7.A1059–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Hydronic Piping23 21 13 3.8.A · PDF p. 1070
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 21 13 3.8.A1070–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Hydronic Piping23 21 13 3.8.B · PDF p. 1070
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 21 13 3.8.B1070–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Hydronic Piping23 21 13 3.8.C · PDF p. 1070
Spec wording
“C. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 21 13 3.8.C1070–
Test / cert.Test / cert.Adjust red set hand on pressure gauges to normal working pressureHydronic Piping23 21 13 3.8.D · PDF p. 1070
Spec wording
“D. Adjust red set hand on pressure gauges to normal working pressure.”
23 21 13 3.8.D1070–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Hydronic Piping23 21 13 3.9.A · PDF p. 1070
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 13 3.9.A1070–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Hydronic Piping23 21 13 3.9.B · PDF p. 1070
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 21 13 3.9.B1070–
TrainingTrainingProvide services of manufacturer's technical representative for 4 hours to ...Hydronic Piping23 21 13 3.10.A · PDF p. 1070
Spec wording
“A. Provide services of manufacturer's technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 21 13 3.10.A1070–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Hydronic Piping23 21 13 3.10.B · PDF p. 1070
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 13 3.10.B1070–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Hydronic Pumps23 21 23 1.4.E · PDF p. 1072
Spec wording
“E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.”
23 21 23 1.4.E1072–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Hydronic Pumps23 21 23 1.4.F · PDF p. 1072
Spec wording
“F. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 23 1.4.F1072–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Hydronic Pumps23 21 23 1.4.G · PDF p. 1073
Spec wording
“G. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 23 1.4.G1073–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Hydronic Pumps23 21 23 1.6.A · PDF p. 1074
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 21 23 1.6.A1074–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Hydronic Pumps23 21 23 3.2.A · PDF p. 1076
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 21 23 3.2.A1076–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Hydronic Pumps23 21 23 3.2.B · PDF p. 1076
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 21 23 3.2.B1076–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Hydronic Pumps23 21 23 3.2.C · PDF p. 1076
Spec wording
“C. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 21 23 3.2.C1076–
Test / cert.Test / cert.Verify that the piping system has been flushed, cleaned and filledHydronic Pumps23 21 23 3.2.D · PDF p. 1076
Spec wording
“D. Verify that the piping system has been flushed, cleaned and filled.”
23 21 23 3.2.D1076–
Test / cert.Test / cert.Lubricate pumps before startupHydronic Pumps23 21 23 3.2.E · PDF p. 1076
Spec wording
“E. Lubricate pumps before startup.”
23 21 23 3.2.E1076–
Test / cert.Test / cert.Prime the pump, vent all air from the casing and ...Hydronic Pumps23 21 23 3.2.F · PDF p. 1076
Spec wording
“F. Prime the pump, vent all air from the casing and verify that the rotation is correct. To avoid damage to mechanical seals, never start or run the pump in dry condition.”
23 21 23 3.2.F1076–
Test / cert.Test / cert.Verify that correct size heaters-motor over-load devices are installed for ...Hydronic Pumps23 21 23 3.2.G · PDF p. 1077
Spec wording
“G. Verify that correct size heaters-motor over-load devices are installed for each pump controller unit.”
23 21 23 3.2.G1077–
Test / cert.Test / cert.Field modifications to the bearings and or impeller (including trimming) ...Hydronic Pumps23 21 23 3.2.H · PDF p. 1077
Spec wording
“H. Field modifications to the bearings and or impeller (including trimming) are prohibited. If the pump does not meet the specified vibration tolerance, send the pump back to the manufacturer for a replacement pump. All modifications to the pump shall be performed at the factory.”
23 21 23 3.2.H1077–
Test / cert.Test / cert.Ensure the disposable strainer is free of debris prior to ...Hydronic Pumps23 21 23 3.2.I · PDF p. 1077
Spec wording
“I. Ensure the disposable strainer is free of debris prior to testing and balancing of the hydronic system.”
23 21 23 3.2.I1077–
Test / cert.Test / cert.After several days of operation, replace the disposable startup strainer ...Hydronic Pumps23 21 23 3.2.J · PDF p. 1077
Spec wording
“J. After several days of operation, replace the disposable startup strainer with a regular strainer in the suction diffuser.”
23 21 23 3.2.J1077–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Hydronic Pumps23 21 23 3.3.A · PDF p. 1077
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 23 3.3.A1077–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Hydronic Pumps23 21 23 3.3.B · PDF p. 1077
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 21 23 3.3.B1077–
TrainingTrainingProvide services of manufacturer's technical representative for 4hours to instruct ...Hydronic Pumps23 21 23 3.4.A · PDF p. 1077
Spec wording
“A. Provide services of manufacturer's technical representative for 4hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 21 23 3.4.A1077–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Hydronic Pumps23 21 23 3.4.B · PDF p. 1077
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 21 23 3.4.B1077–
Record docsRecord docsAs-Built Piping DiagramsSteam And Condensate Heating Piping23 22 13 1.4.F · PDF p. 1081
Spec wording
“F. As-Built Piping Diagrams: Provide drawing as follows for steam and steam condensate piping and other central plant equipment. 1. One wall-mounted stick file for prints. Mount stick file in the chiller plant or adjacent control room along with control diagram stick file. 2. One set of reproducible drawings.”
23 22 13 1.4.F1081One set
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Steam And Condensate Heating Piping23 22 13 1.4.G · PDF p. 1081
Spec wording
“G. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams will have their terminals identified to facilitate installation, operation and maintenance.”
23 22 13 1.4.G1081–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the Commissioning Agent and ...Steam And Condensate Heating Piping23 22 13 1.4.H · PDF p. 1081
Spec wording
“H. Completed System Readiness Checklist provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 22 13 1.4.H1081–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Steam And Condensate Heating Piping23 22 13 1.4.I · PDF p. 1081
Spec wording
“I. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 22 13 1.4.I1081–
Record docsRecord docsSubmit manufacturer's literature and data updated to include submittal review ...Steam And Condensate Heating Piping23 22 13 1.6.A · PDF p. 1082
Spec wording
“A. Submit manufacturer's literature and data updated to include submittal review comments and any equipment substitutions.”
23 22 13 1.6.A1082–
Record docsRecord docsSubmit operation and maintenance data updated to include submittal review ...Steam And Condensate Heating Piping23 22 13 1.6.B · PDF p. 1082
Spec wording
“B. Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions will be in electronic version on CD or DVD inserted into a three-ring binder. All aspects of system operation and maintenance procedures, including applicable piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence ...”
23 22 13 1.6.B1082electronic version; CD; DVD; three-ring; binder
Record docsRecord docsThe installing contractor will maintain as-built drawings of each completed ...Steam And Condensate Heating Piping23 22 13 1.6.C · PDF p. 1082-1083
Spec wording
“C. The installing contractor will maintain as-built drawings of each completed phase for verification; and will provide the complete set at the time of final systems certification testing. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it will not be deemed a conflict of interest or breach of the ‘third party testing company' requirement. Provide record ...”
23 22 13 1.6.C1082-1083AutoCAD; CD; DVD; CAD
Record docsRecord docsThe as-built drawings will indicate the location and type of ...Steam And Condensate Heating Piping23 22 13 1.6.D · PDF p. 1083
Spec wording
“D. The as-built drawings will indicate the location and type of all lockout/tagout points for all energy sources for all equipment and pumps to include breaker location and numbers, valve tag numbers, etc. Coordinate lockout/tagout procedures and practices with local VA requirements.”
23 22 13 1.6.D1083–
Record docsRecord docsCertification documentation will be provided to COR 21 working days ...Steam And Condensate Heating Piping23 22 13 1.6.E · PDF p. 1083
Spec wording
“E. Certification documentation will be provided to COR 21 working days prior to submitting the request for final inspection. The documentation will include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and provide documentation/certification that all results of tests were within limits specified. Test results will ...”
23 22 13 1.6.E1083–
Test / cert.Test / cert.Prepare and submit test and inspection reports to the COR ...Steam And Condensate Heating Piping23 22 13 3.7.D · PDF p. 1095
Spec wording
“D. Prepare and submit test and inspection reports to the COR within 5 working days of test completion and prior to covering the pipe.”
23 22 13 3.7.D1095–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Steam And Condensate Heating Piping23 22 13 3.10.A · PDF p. 1096
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment will be performed simultaneously with the system of which each item is an integral part.”
23 22 13 3.10.A1096–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Steam And Condensate Heating Piping23 22 13 3.10.B · PDF p. 1096
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 22 13 3.10.B1096–
Test / cert.Test / cert.The Commissioning Agent will observe startup and contractor testing of ...Steam And Condensate Heating Piping23 22 13 3.10.C · PDF p. 1096
Spec wording
“C. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with COR and Commissioning Agent. Provide a minimum notice of 10 working days prior to startup and testing.”
23 22 13 3.10.C1096–
Test / cert.Test / cert.Adjust red set hand on pressure gauges to normal working pressureSteam And Condensate Heating Piping23 22 13 3.10.D · PDF p. 1096
Spec wording
“D. Adjust red set hand on pressure gauges to normal working pressure.”
23 22 13 3.10.D1096–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Steam And Condensate Heating Piping23 22 13 3.11.A · PDF p. 1096
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 22 13 3.11.A1096–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Steam And Condensate Heating Piping23 22 13 3.11.B · PDF p. 1096
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 22 13 3.11.B1096–
TrainingTrainingProvide services of manufacturer's technical representative for 4hours to instruct ...Steam And Condensate Heating Piping23 22 13 3.12.A · PDF p. 1096
Spec wording
“A. Provide services of manufacturer's technical representative for 4hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 22 13 3.12.A1096–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Steam And Condensate Heating Piping23 22 13 3.12.B · PDF p. 1096
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 22 13 3.12.B1096–
Record docsRecord docsComply with requirements in Paragraph "AS-BUILT DOCUMENTATION" in Section 23 ...Refrigerant Piping23 23 00 1.6.A · PDF p. 1100
Spec wording
“A. Comply with requirements in Paragraph "AS-BUILT DOCUMENTATION" in Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 23 00 1.6.A1100–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Refrigerant Piping23 23 00 3.6.A · PDF p. 1107
Spec wording
“A. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum of 7 days prior notice.”
23 23 00 3.6.A1107–
Test / cert.Test / cert.DeletedRefrigerant Piping23 23 00 3.6.B · PDF p. 1107
Spec wording
“B. Deleted”
23 23 00 3.6.B1107–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Refrigerant Piping23 23 00 3.7.A · PDF p. 1107
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the CxA.”
23 23 00 3.7.A1107–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Refrigerant Piping23 23 00 3.7.B · PDF p. 1107
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning. /”
23 23 00 3.7.B1107–
TrainingTrainingProvide services of manufacturer's technical representative for 4 hours to ...Refrigerant Piping23 23 00 3.8.A · PDF p. 1107
Spec wording
“A. Provide services of manufacturer's technical representative for 4 hours to instruct VA personnel in operation and maintenance of units.”
23 23 00 3.8.A1107–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Refrigerant Piping23 23 00 3.8.B · PDF p. 1107
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 23 00 3.8.B1107–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Hvac Water Treatment23 25 00 1.4.F · PDF p. 1109
Spec wording
“F. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.”
23 25 00 1.4.F1109–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Hvac Water Treatment23 25 00 1.4.G · PDF p. 1109
Spec wording
“G. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 25 00 1.4.G1109–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Hvac Water Treatment23 25 00 1.4.H · PDF p. 1110
Spec wording
“H. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING of HVAC SYSTEMS.”
23 25 00 1.4.H1110–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Hvac Water Treatment23 25 00 1.6.A · PDF p. 1110
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 25 00 1.6.A1110–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Hvac Water Treatment23 25 00 3.2.A · PDF p. 1113
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 25 00 3.2.A1113–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Hvac Water Treatment23 25 00 3.2.B · PDF p. 1113
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 25 00 3.2.B1113–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Hvac Water Treatment23 25 00 3.2.C · PDF p. 1113
Spec wording
“C. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 25 00 3.2.C1113–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Hvac Water Treatment23 25 00 3.3.A · PDF p. 1113
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 25 00 3.3.A1113–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Hvac Water Treatment23 25 00 3.3.B · PDF p. 1113
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 25 00 3.3.B1113–
TrainingTrainingProvide services of manufacturer's technical representative for 4 hours to ...Hvac Water Treatment23 25 00 3.4.A · PDF p. 1113
Spec wording
“A. Provide services of manufacturer's technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 25 00 3.4.A1113–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Hvac Water Treatment23 25 00 3.4.B · PDF p. 1113
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 25 00 3.4.B1113–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Hvac Ducts And Casings23 31 00 1.4.E · PDF p. 1117
Spec wording
“E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.”
23 31 00 1.4.E1117–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Hvac Ducts And Casings23 31 00 1.6.A · PDF p. 1118
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 31 00 1.6.A1118–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Hvac Fans23 34 00 1.4.G · PDF p. 1129
Spec wording
“G. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.”
23 34 00 1.4.G1129–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Hvac Fans23 34 00 1.4.H · PDF p. 1129
Spec wording
“H. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance wiI. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 34 00 1.4.H1129–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Hvac Fans23 34 00 1.6.A · PDF p. 1130
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 34 00 1.6.A1130–
Spare partsSpare partsProvide one additional set of belts for all belt-driven fansHvac Fans23 34 00 1.7.A · PDF p. 1130
Spec wording
“A. Provide one additional set of belts for all belt-driven fans.”
23 34 00 1.7.A1130one additional set
Test / cert.Test / cert.Verify operation of motor, drive system and fan wheel according ...Hvac Fans23 34 00 3.3.A · PDF p. 1132
Spec wording
“A. Verify operation of motor, drive system and fan wheel according to the contract documents.”
23 34 00 3.3.A1132–
Test / cert.Test / cert.Check vibration and correct as necessary for air balance workHvac Fans23 34 00 3.3.B · PDF p. 1132
Spec wording
“B. Check vibration and correct as necessary for air balance work.”
23 34 00 3.3.B1132–
Test / cert.Test / cert.After air balancing is complete and permanent sheaves are in ...Hvac Fans23 34 00 3.3.C · PDF p. 1133
Spec wording
“C. After air balancing is complete and permanent sheaves are in place perform necessary field mechanical balancing to meet vibration tolerance in Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT.”
23 34 00 3.3.C1133–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Hvac Fans23 34 00 3.3.D · PDF p. 1133
Spec wording
“D. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 34 00 3.3.D1133–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Hvac Fans23 34 00 3.3.E · PDF p. 1133
Spec wording
“E. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 34 00 3.3.E1133–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Hvac Fans23 34 00 3.3.F · PDF p. 1133
Spec wording
“F. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 34 00 3.3.F1133–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Hvac Fans23 34 00 3.3.A · PDF p. 1133
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 34 00 3.3.A1133–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Hvac Fans23 34 00 3.3.B · PDF p. 1133
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 34 00 3.3.B1133–
TrainingTrainingProvide services of manufacturer's technical representative for 4 hours to ...Hvac Fans23 34 00 3.4.A · PDF p. 1133
Spec wording
“A. Provide services of manufacturer's technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 34 00 3.4.A1133–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Hvac Fans23 34 00 3.4.B · PDF p. 1133
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 34 00 3.4.B1133–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Air Terminal Units23 36 00 1.4.E · PDF p. 1135
Spec wording
“E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.”
23 36 00 1.4.E1135–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Air Terminal Units23 36 00 1.4.F · PDF p. 1135
Spec wording
“F. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 36 00 1.4.F1135–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Air Terminal Units23 36 00 1.4.G · PDF p. 1135
Spec wording
“G. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 36 00 1.4.G1135–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Air Terminal Units23 36 00 1.6.A · PDF p. 1136
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 36 00 1.6.A1136–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Air Terminal Units23 36 00 3.2.A · PDF p. 1138
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 36 00 3.2.A1138–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Air Terminal Units23 36 00 3.2.B · PDF p. 1138
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 36 00 3.2.B1138–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Air Terminal Units23 36 00 3.2.C · PDF p. 1138-1139
Spec wording
“C. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 36 00 3.2.C1138-1139–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Air Terminal Units23 36 00 3.3.A · PDF p. 1139
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 36 00 3.3.A1139–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Air Terminal Units23 36 00 3.3.B · PDF p. 1139
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 36 00 3.3.B1139–
TrainingTrainingProvide services of manufacturer's technical representative for 4hours to instruct ...Air Terminal Units23 36 00 3.4.A · PDF p. 1139
Spec wording
“A. Provide services of manufacturer's technical representative for 4hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 36 00 3.4.A1139–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Air Terminal Units23 36 00 3.4.B · PDF p. 1139
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 36 00 3.4.B1139–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Air Outlets And Inlets23 37 00 1.4.D · PDF p. 1141
Spec wording
“D. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.”
23 37 00 1.4.D1141–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Air Outlets And Inlets23 37 00 1.6.A · PDF p. 1141
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 37 00 1.6.A1141–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Air Outlets And Inlets23 37 00 3.4.A · PDF p. 1145
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 37 00 3.4.A1145–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Air Outlets And Inlets23 37 00 3.4.B · PDF p. 1145
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 37 00 3.4.B1145–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Indoor Central-Station Air-Handling Units23 73 00 1.4.F · PDF p. 1150
Spec wording
“F. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include instructions for lubrication, filter replacement, motor and drive replacement, and spare parts list. 3. Include complete diagrams of the internal wiring for each item of ...”
23 73 00 1.4.F1150–
Test / cert.Test / cert.Completed System Readiness Checklist provided by the CxA and completed ...Indoor Central-Station Air-Handling Units23 73 00 1.4.G · PDF p. 1150
Spec wording
“G. Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 73 00 1.4.G1150–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Indoor Central-Station Air-Handling Units23 73 00 1.4.H · PDF p. 1150
Spec wording
“H. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 73 00 1.4.H1150–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Indoor Central-Station Air-Handling Units23 73 00 1.6.A · PDF p. 1151
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 73 00 1.6.A1151–
Test / cert.Test / cert.The air handling unit shall not be operated for any ...Indoor Central-Station Air-Handling Units23 73 00 3.2.A · PDF p. 1159
Spec wording
“A. The air handling unit shall not be operated for any purpose, temporary or permanent, until ductwork is clean, filters are in place, bearings are lubricated, and the fan has been test run under observation.”
23 73 00 3.2.A1159–
Test / cert.Test / cert.After the air handling unit is installed and tested, provide ...Indoor Central-Station Air-Handling Units23 73 00 3.2.B · PDF p. 1159
Spec wording
“B. After the air handling unit is installed and tested, provide startup and operating instructions to VA personnel.”
23 73 00 3.2.B1159–
Test / cert.Test / cert.An authorized factory representative should startup, test, and certify the ...Indoor Central-Station Air-Handling Units23 73 00 3.2.C · PDF p. 1159
Spec wording
“C. An authorized factory representative should startup, test, and certify the final installation and application specific calibration of control components. Items to be verified include fan performance over entire operating range, noise and vibration testing, verification of proper alignment, overall inspection of the installation, Owner/Operator training, etc.”
23 73 00 3.2.C1159–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Indoor Central-Station Air-Handling Units23 73 00 3.2.D · PDF p. 1159-1160
Spec wording
“D. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 73 00 3.2.D1159-1160–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Indoor Central-Station Air-Handling Units23 73 00 3.2.E · PDF p. 1160
Spec wording
“E. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 73 00 3.2.E1160–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Indoor Central-Station Air-Handling Units23 73 00 3.2.F · PDF p. 1160
Spec wording
“F. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum notice of 10 working days prior to startup and testing.”
23 73 00 3.2.F1160–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Indoor Central-Station Air-Handling Units23 73 00 3.3.A · PDF p. 1160
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 73 00 3.3.A1160–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Indoor Central-Station Air-Handling Units23 73 00 3.3.B · PDF p. 1160
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 73 00 3.3.B1160–
TrainingTrainingProvide services of manufacturer's technical representative for 4 hours to ...Indoor Central-Station Air-Handling Units23 73 00 3.4.A · PDF p. 1160
Spec wording
“A. Provide services of manufacturer's technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 73 00 3.4.A1160–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Indoor Central-Station Air-Handling Units23 73 00 3.4.B · PDF p. 1160
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 73 00 3.4.B1160–
Test / cert.Test / cert.Perform tests and inspections and prepare test reportsDecentralized Unitary Hvac Equipment23 81 00 3.3.A · PDF p. 1167
Spec wording
“A. Perform tests and inspections and prepare test reports.”
23 81 00 3.3.A1167–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Decentralized Unitary Hvac Equipment23 81 00 3.4.A · PDF p. 1167
Spec wording
“A. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum of 7 days prior notice.”
23 81 00 3.4.A1167–
Test / cert.Test / cert.Provide services of manufacturer's technical representative for four hours to ...Decentralized Unitary Hvac Equipment23 81 00 3.4.B · PDF p. 1167
Spec wording
“B. Provide services of manufacturer's technical representative for four hours to instruct VA personnel in operation and maintenance of units.”
23 81 00 3.4.B1167–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Decentralized Unitary Hvac Equipment23 81 00 3.5.A · PDF p. 1167
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the CxA.”
23 81 00 3.5.A1167–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Decentralized Unitary Hvac Equipment23 81 00 3.5.B · PDF p. 1167-1168
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning. DEMONSTRATION AND TRAINING”
23 81 00 3.5.B1167-1168–
Test / cert.Test / cert.Provide services of manufacturer's technical representative for 4hours to instruct ...Decentralized Unitary Hvac Equipment23 81 00 3.5.A · PDF p. 1168
Spec wording
“A. Provide services of manufacturer's technical representative for 4hours to instruct VA personnel in operation and maintenance of units.”
23 81 00 3.5.A1168–
Test / cert.Test / cert.Submit training plans and instructor qualifications in accordance with the ...Decentralized Unitary Hvac Equipment23 81 00 3.5.B · PDF p. 1168
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS. ---END---”
23 81 00 3.5.B1168–
O&MO&MComplete operating and maintenance manuals including wiring diagrams, technical data ...Convection Heating And Cooling Units23 82 00 1.4.E · PDF p. 1170
Spec wording
“E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.”
23 82 00 1.4.E1170–
Test / cert.Test / cert.Completed System Readiness Checklists provided by the CxA and completed ...Convection Heating And Cooling Units23 82 00 1.4.F · PDF p. 1170
Spec wording
“F. Completed System Readiness Checklists provided by the CxA and completed by the contractor, signed by a qualified technician, and dated on the date of completion, in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 82 00 1.4.F1170–
Record docsRecord docsComply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 ...Convection Heating And Cooling Units23 82 00 1.6.A · PDF p. 1171
Spec wording
“A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section 23 05 11, COMMON WORK RESULTS FOR HVAC.”
23 82 00 1.6.A1171–
Test / cert.Test / cert.Perform tests as recommended by product manufacturer and listed standards ...Convection Heating And Cooling Units23 82 00 3.2.A · PDF p. 1173
Spec wording
“A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.”
23 82 00 3.2.A1173–
Test / cert.Test / cert.When any defects are detected, correct defects and repeat test ...Convection Heating And Cooling Units23 82 00 3.2.B · PDF p. 1173
Spec wording
“B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.”
23 82 00 3.2.B1173–
Test / cert.Test / cert.The CxA will observe startup and contractor testing of selected ...Convection Heating And Cooling Units23 82 00 3.2.C · PDF p. 1173
Spec wording
“C. The CxA will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and CxA. Provide a minimum notice of 10 working days prior o startup and testing.”
23 82 00 3.2.C1173–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Convection Heating And Cooling Units23 82 00 3.3.A · PDF p. 1173
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 82 00 3.3.A1173–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Convection Heating And Cooling Units23 82 00 3.3.B · PDF p. 1173
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system.”
23 82 00 3.3.B1173–
TrainingTrainingProvide services of manufacturer's technical representative for 4 hours to ...Convection Heating And Cooling Units23 82 00 3.4.A · PDF p. 1173
Spec wording
“A. Provide services of manufacturer's technical representative for 4 hours to instruct each VA personnel responsible in operation and maintenance of the system.”
23 82 00 3.4.A1173–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Convection Heating And Cooling Units23 82 00 3.4.B · PDF p. 1173
Spec wording
“B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.”
23 82 00 3.4.B1173–

Division 26 Electrical 25 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.All submittals shall include six copies of adequate descriptive literature, ...Requirements For Electrical Installations26 05 11 1.12.C · PDF p. 1181
Spec wording
“C. All submittals shall include six copies of adequate descriptive literature, catalog cuts, shop drawings, test reports, certifications, samples, and other data necessary for the Government to ascertain that the proposed materials and equipment comply with drawing and specification requirements. Catalog cuts submitted for approval shall be legible and clearly identify specific materials and equipment being ...”
26 05 11 1.12.C1181six copies
O&MO&MThe submittals shall include the following:Requirements For Electrical Installations26 05 11 1.12.E · PDF p. 1181
Spec wording
“E. The submittals shall include the following: 1. Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, manuals, pictures, nameplate data, and test reports as required. 2. Elementary and interconnection wiring diagrams for communication and signal systems, control systems, and equipment ...”
26 05 11 1.12.E1181–
O&MO&MMaintenance and Operation Manuals:Requirements For Electrical Installations26 05 11 1.12.F · PDF p. 1181-1182
Spec wording
“F. Maintenance and Operation Manuals: 1. Submit as required for systems and equipment specified in the technical sections. Furnish in hardcover binders or an approved equivalent. 2. Inscribe the following identification on the cover: the words "MAINTENANCE AND OPERATION MANUAL," the name and location of the system, material, equipment, building, name of Contractor, and contract name and number. Include in the ...”
26 05 11 1.12.F1181-1182binders
Test / cert.Test / cert.Approvals will be based on complete submission of shop drawings, ...Requirements For Electrical Installations26 05 11 1.12.G · PDF p. 1182
Spec wording
“G. Approvals will be based on complete submission of shop drawings, manuals, test reports, certifications, and samples as applicable.”
26 05 11 1.12.G1182–
WarrantyWarrantyAll work performed and all equipment and material furnished under ...Requirements For Electrical Installations26 05 11 1.15.A · PDF p. 1183
Spec wording
“A. All work performed and all equipment and material furnished under this Division shall be free from defects and shall remain so for a period of one year from the date of acceptance of the entire installation by the Contracting Officer for the Government.”
26 05 11 1.15.A1183–
Test / cert.Test / cert.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Low-Voltage Electrical Power Conductors And Cables26 05 19 1.4.A · PDF p. 1184
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Submit the following data for approval: 1) Electrical ratings and insulation type for each conductor and cable. 2) Splicing materials and pulling lubricant. ...”
26 05 19 1.4.A1184–
Test / cert.Test / cert.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Grounding And Bonding For Electrical Systems26 05 26 1.4.A · PDF p. 1191-1192
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Submit plans showing the location of system grounding electrodes and connections, and the routing of aboveground and underground grounding electrode ...”
26 05 26 1.4.A1191-1192–
Test / cert.Test / cert.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Raceway And Boxes For Electrical Systems26 05 33 1.4.A · PDF p. 1199
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Size and location of main feeders. b. Size and location of panels and pull-boxes. c. Layout of required conduit penetrations through structural elements. d. Submit the following data for approval: 1) Raceway types and sizes. 2) Conduit bodies, ...”
26 05 33 1.4.A1199–
Test / cert.Test / cert.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Overcurrent Protective Device Coordination Study26 05 73 1.4.A · PDF p. 1211
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Product data on the software program to be used for the study. Software shall be in mainstream use in the industry, shall provide device settings and ratings, and shall show selective coordination by time-current drawings. 2. Complete study as described in paragraph ...”
26 05 73 1.4.A1211–
Test / cert.Test / cert.The commissioning process requires review of selected Submittals that pertain ...Commissioning Of Electrical Systems26 08 00 1.6.A · PDF p. 1216
Spec wording
“A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.”
26 08 00 1.6.A1216–
Test / cert.Test / cert.The commissioning process requires Submittal review simultaneously with engineering review. ...Commissioning Of Electrical Systems26 08 00 1.6.B · PDF p. 1216
Spec wording
“B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.”
26 08 00 1.6.B1216–
Test / cert.Test / cert.The Commissioning Process includes Systems Functional Performance Testing that is ...Commissioning Of Electrical Systems26 08 00 3.4.A · PDF p. 1217
Spec wording
“A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. ...”
26 08 00 3.4.A1217–
TrainingTrainingTraining of the VA operation and maintenance personnel is required ...Commissioning Of Electrical Systems26 08 00 3.5.A · PDF p. 1217-1218
Spec wording
“A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the ...”
26 08 00 3.5.A1217-1218–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Lighting Controls26 09 23 1.4.A · PDF p. 1219-1220
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit the following information for each type of lighting controls. b. Material and construction details. c. Physical dimensions and description. d. Wiring schematic and connection diagram. e. Installation details. 2. Manuals: a. Submit, ...”
26 09 23 1.4.A1219-1220–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Panelboards26 24 16 1.4.A · PDF p. 1228-1229
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Include electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, circuit breakers, wiring and connection ...”
26 24 16 1.4.A1228-1229–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Wiring Devices26 27 26 1.4.A · PDF p. 1234-1235
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Include electrical ratings, dimensions, mounting details, construction materials, grade, and termination information. 2. Manuals: a. Submit, simultaneously ...”
26 27 26 1.4.A1234-1235–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Enclosed Switches And Circuit Breakers26 29 21 1.4.A · PDF p. 1240-1241
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Submit the following data for approval: 1) Electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, fuses, ...”
26 29 21 1.4.A1240-1241–
Spare partsSpare partsTwo weeks prior to the final inspection, furnish one complete ...Enclosed Switches And Circuit Breakers26 29 21 3.3.A · PDF p. 1243
Spec wording
“A. Two weeks prior to the final inspection, furnish one complete set of spare fuses for each fused disconnect switch installed on the project. Deliver the spare fuses to the COR. ---END---”
26 29 21 3.3.A1243one complete set
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Engine Generators26 32 13 1.5.A · PDF p. 1245-1246
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Scaled drawings, showing plan views, side views, elevations, and cross-sections. 2. Diagrams: a. Control system diagrams, control sequence diagrams or ...”
26 32 13 1.5.A1245-1246–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Automatic Transfer Switches26 36 23 1.5.A · PDF p. 1255-1256
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Include voltage rating, continuous current rating, number of phases, withstand and closing rating, dimensions, weights, mounting details, conduit entry ...”
26 36 23 1.5.A1255-1256–
Test / cert.Test / cert.An authorized representative of the automatic transfer switch manufacturer shall ...Automatic Transfer Switches26 36 23 3.2.A · PDF p. 1264
Spec wording
“A. An authorized representative of the automatic transfer switch manufacturer shall technically supervise and participate during all of the field adjustments and tests. Major adjustments and field tests shall be witnessed by the COR. The manufacturer's representative shall certify in writing that the equipment has been installed, adjusted and tested in accordance with the manufacturer's recommendations.”
26 36 23 3.2.A1264–
Test / cert.Test / cert.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Facility Lightning Protection26 41 00 1.4.A · PDF p. 1267
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Show locations of air terminals, connections to required metal surfaces, down conductors, and grounding means. c. Show the mounting hardware and materials ...”
26 41 00 1.4.A1267–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Surge Protective Devices26 43 13 1.4.A · PDF p. 1272
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Include electrical ratings and device nameplate data. 2. Manuals: a. Submit, simultaneously with the shop drawings, companion copies of complete maintenance ...”
26 43 13 1.4.A1272–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Interior Lighting26 51 00 1.4.A · PDF p. 1276-1277
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit the following information for each type of lighting fixture designated on the LIGHTING FIXTURE SCHEDULE, arranged in order of lighting fixture designation. b. Material and construction details, include information on housing and optics system. ...”
26 51 00 1.4.A1276-1277–
O&MO&MSubmit in accordance with Paragraph, SUBMITTALS in Section 26 05 ...Exterior Lighting26 56 00 1.4.A · PDF p. 1285-1286
Spec wording
“A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit the following information for each type of lighting fixture designated on the LIGHTING FIXTURE SCHEDULE, arranged in order of lighting fixture designation. b. Material and construction details, include information on housing and optics system. ...”
26 56 00 1.4.A1285-1286–

Division 27 Communications 18 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MProvide parts list including quantity of spare partsRequirements For Communications Installations27 05 11 1.7.B · PDF p. 1316
Spec wording
“B. Provide parts list including quantity of spare parts.”
27 05 11 1.7.B1316–
Test / cert.Test / cert.Furnish electronic certified test reports to COR prior to final ...Requirements For Communications Installations27 05 11 1.7.K · PDF p. 1318
Spec wording
“K. Furnish electronic certified test reports to COR prior to final inspection and not more than 90 days after completion of tests.”
27 05 11 1.7.K1318–
WarrantyWarrantyProvide following closeout submittals prior to project closeout date:Requirements For Communications Installations27 05 11 1.8.A · PDF p. 1318-1319
Spec wording
“A. Provide following closeout submittals prior to project closeout date: 1. Warranty certificate. 2. Evidence of compliance with requirements such as low voltage certificate of inspection. 3. Project record documents. 4. Instruction manuals and software that are a part of system.”
27 05 11 1.8.A1318-1319–
WarrantyWarrantyMaintenance and Operation ManualsRequirements For Communications Installations27 05 11 1.8.B · PDF p. 1319
Spec wording
“B. Maintenance and Operation Manuals: Submit in accordance with Section 01 00 00, GENERAL REQUIREMENTS. 1. Prepare a manual for each system and equipment specified. 2. Furnish on portable storage drive in PDF format or equivalent accepted by COR. 3. Furnish complete manual as specified in specification section, fifteen days prior to performance of systems or equipment test. 4. Furnish remaining manuals prior to ...”
27 05 11 1.8.B1319PDF
Test / cert.Test / cert.Record Wiring Diagrams:Requirements For Communications Installations27 05 11 1.8.C · PDF p. 1319-1320
Spec wording
“C. Record Wiring Diagrams: 1. Red Line Drawings: Keep one E size 91.44 cm x 121.92 cm (36 inches x 48 inches) set of floor plans, on site during work hours, showing installation progress marked and backbone cable labels noted. Make these drawings available for examination during construction meetings or field inspections. 2. General Drawing Specifications: Detail and elevation drawings to be D size 61 cm x 91.44 cm ...”
27 05 11 1.8.C1319-1320CAD; four complete sets
Closeout stepCloseout stepService QualificationsRequirements For Communications Installations27 05 11 1.8.D · PDF p. 1320
Spec wording
“D. Service Qualifications: Submit name and contact information of service organizations providing service to this installation within eight hours of receipt of notification service is needed.”
27 05 11 1.8.D1320–
Spare partsSpare partsAfter approval and prior to installation, furnish COR with the ...Requirements For Communications Installations27 05 11 1.9.A · PDF p. 1320-1321
Spec wording
“A. After approval and prior to installation, furnish COR with the following: 1. A 300 mm (12 inch) length of each type and size of wire and cable along with tag from coils of reels from which samples were taken. 2. One coupling, bushing and termination fitting for each type of conduit. 3. Samples of each hanger, clamp and supports for conduit and pathways. 4. Duct sealing compound.”
27 05 11 1.9.A1320-1321–
WarrantyWarrantyComply with FAR clause 52.246-21Requirements For Communications Installations27 05 11 1.13.A · PDF p. 1323
Spec wording
“A. Comply with FAR clause 52.246-21”
27 05 11 1.13.A1323–
Test / cert.Test / cert.Proof of Performance Certification:Requirements For Communications Installations27 05 11 3.6.M · PDF p. 1332
Spec wording
“M. Proof of Performance Certification: 1. If system is declared acceptable, AHJ provides COR notice stating system processes to required operating standards and functions and is Government accepted for use by facility. 2. Validate items with COR needing to be provided to complete project contract (i.e. charts & diagrams, manuals, spare parts, system warranty documents executed, etc.). Once items have been provided, ...”
27 05 11 3.6.M1332–
TrainingTrainingProvide training in accordance with subsection, INSTRUCTIONS, of Section 01 ...Requirements For Communications Installations27 05 11 3.8.A · PDF p. 1333
Spec wording
“A. Provide training in accordance with subsection, INSTRUCTIONS, of Section 01 00 00, GENERAL REQUIREMENTS.”
27 05 11 3.8.A1333–
TrainingTrainingProvide training for equipment or system as required in each ...Requirements For Communications Installations27 05 11 3.8.B · PDF p. 1333
Spec wording
“B. Provide training for equipment or system as required in each associated specification.”
27 05 11 3.8.B1333–
TrainingTrainingDevelop and submit training schedule for approval by COR, at ...Requirements For Communications Installations27 05 11 3.8.C · PDF p. 1333
Spec wording
“C. Develop and submit training schedule for approval by COR, at least 30 days prior to planned training.”
27 05 11 3.8.C1333–
Test / cert.Test / cert.Closeout SubmittalsGrounding And Bonding For Communications Systems27 05 26 1.3.C · PDF p. 1335
Spec wording
“C. Closeout Submittals: In addition to Section 27 05 11, REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS provide the following: 1. Certified test reports of ground resistance. 2. Certifications: Two weeks prior to final inspection, submit following to COR: a. Certification materials and installation is in accordance with construction documents. b. Certification complete installation has been installed and tested.”
27 05 26 1.3.C1335–
Test / cert.Test / cert.CertificationRaceways And Boxes For Communications Systems27 05 33 1.3.B · PDF p. 1343
Spec wording
“B. Certification: Provide letter prior to final inspection, certifying material is in accordance with construction documents and properly installed.”
27 05 33 1.3.B1343–
WarrantyWarrantyCloseout Submittals:Control, Communication And Signal Wiring27 10 00 1.3.F · PDF p. 1355
Spec wording
“F. Closeout Submittals: 1. Provide contact information for maintenance personnel to contact contractor for emergency maintenance and logistic assistance, and assistance in resolving technical problems at any time during warranty period. 2. Provide certified OEM sweep test tags from each cable reel to COR. 3. Furnish spare or unused wire and cable with appropriate connectors (female types) for installation in ...”
27 10 00 1.3.F1355–
WarrantyWarrantyCertifications:Communications Structured Cabling27 15 00 1.3.B · PDF p. 1374-1375
Spec wording
“B. Certifications: 1. Submit written certification from OEM indicating that proposed supervisor of installation and proposed provider of contract maintenance are authorized representatives of OEM. Include individual's legal name and address and OEM warranty credentials in the certification. 2. Pre-acceptance Certification: Submit in accordance with test procedures. 3. Test system cables and certify to COR before ...”
27 15 00 1.3.B1374-1375–
Test / cert.Test / cert.Closeout SubmittalCommunications Structured Cabling27 15 00 1.3.C · PDF p. 1375
Spec wording
“C. Closeout Submittal: Provide document from OEM certifying that each item of equipment installed conforms to OEM published specifications.”
27 15 00 1.3.C1375–
WarrantyWarrantyWork subject to terms of Article "Warranty of Construction," FAR ...Communications Structured Cabling27 15 00 1.4.A · PDF p. 1375
Spec wording
“A. Work subject to terms of Article "Warranty of Construction," FAR clause 52.246-21.”
27 15 00 1.4.A1375–

Division 28 Fire alarm and security 59 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MThe submittals shall include the following:Common Work Results For Electronic Safety And Security28 05 00 1.6.D · PDF p. 1399-1400
Spec wording
“D. The submittals shall include the following: 1. Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, pictures, nameplate data and test reports as required. 3. Parts list which shall include those replacement parts recommended by the equipment manufacturer, quantity of parts, current ...”
28 05 00 1.6.D1399-1400–
WarrantyWarrantySubmittals shall be in full compliance of the Contract Documents. ...Common Work Results For Electronic Safety And Security28 05 00 1.6.E · PDF p. 1400-1405
Spec wording
“E. Submittals shall be in full compliance of the Contract Documents. All submittals shall be provided in accordance with this section. Submittals lacking the breath or depth these requirements will be considered incomplete and rejected. Submissions are considered multidisciplinary and shall require coordination with applicable divisions to provide a complete and comprehensive submission package. All submittals ...”
28 05 00 1.6.E1400-1405AutoCAD; CAD; Binders; binder; four copies
Record docsRecord docsGroup IV Technical Data PackageCommon Work Results For Electronic Safety And Security28 05 00 1.6.I · PDF p. 1410-1412
Spec wording
“I. Group IV Technical Data Package 1. Performance Verification Test a. Based on the successful completion of the pre-delivery test, the Contractor shall finalize the test procedures and report forms for the performance verification test (PVT) and the endurance test. The PVT shall follow the format, layout and content of the pre-delivery test. The Contractor shall deliver the PVT and endurance test procedures to the ...”
28 05 00 1.6.I1410-1412CAD; hard copy
O&MO&MGroup V Technical Data PackageCommon Work Results For Electronic Safety And Security28 05 00 1.6.J · PDF p. 1412-1416
Spec wording
“J. Group V Technical Data Package: Final copies of the manuals shall be delivered to the COR as part of the acceptance test. The draft copy used during site testing shall be updated with any changes required prior to final delivery of the manuals. Each manual's contents shall be identified on the cover. The manual shall include names, addresses, and telephone numbers of each sub-contractor installing equipment or ...”
28 05 00 1.6.J1412-1416CD; two (2) complete sets; binder; one (1) copy; AutoCAD; DVD
Test / cert.Test / cert.Completed System Readiness Checklists provided by the Commissioning Agent and ...Common Work Results For Electronic Safety And Security28 05 00 1.6.N · PDF p. 1418
Spec wording
“N. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS.”
28 05 00 1.6.N1418–
WarrantyWarrantyThe Contractor shall, as a condition precedent to the final ...Common Work Results For Electronic Safety And Security28 05 00 1.20.A · PDF p. 1436-1437
Spec wording
“A. The Contractor shall, as a condition precedent to the final payment, execute a written guarantee (warranty) to the COR certifying all contract requirements have been completed according to the final specifications. Contract drawings and the warranty of all materials and equipment furnished under this contract are to remain in satisfactory operating condition (ordinary wear and tear, abuse and causes beyond his ...”
28 05 00 1.20.A1436-1437–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Common Work Results For Electronic Safety And Security28 05 00 3.3.A · PDF p. 1451
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the Commissioning Agent.”
28 05 00 3.3.A1451–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Common Work Results For Electronic Safety And Security28 05 00 3.3.B · PDF p. 1451
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system. Refer to section 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS and related sections for contractor responsibilities for system commissioning.”
28 05 00 3.3.B1451–
TrainingTrainingTraining shall be provided in accordance with Article, INSTRUCTIONS, of ...Common Work Results For Electronic Safety And Security28 05 00 3.4.A · PDF p. 1451
Spec wording
“A. Training shall be provided in accordance with Article, INSTRUCTIONS, of Section 01 00 00, GENERAL REQUIREMENTS.”
28 05 00 3.4.A1451–
TrainingTrainingTraining shall be provided for the particular equipment or system ...Common Work Results For Electronic Safety And Security28 05 00 3.4.B · PDF p. 1451
Spec wording
“B. Training shall be provided for the particular equipment or system as required in each associated specification.”
28 05 00 3.4.B1451–
TrainingTrainingA training schedule shall be developed and submitted by the ...Common Work Results For Electronic Safety And Security28 05 00 3.4.C · PDF p. 1451
Spec wording
“C. A training schedule shall be developed and submitted by the contractor and approved by the COR at least 30 days prior to the planned training.”
28 05 00 3.4.C1451–
TrainingTrainingProvide services of manufacturer's technical representative for <insert hours> hours ...Common Work Results For Electronic Safety And Security28 05 00 3.4.D · PDF p. 1452
Spec wording
“D. Provide services of manufacturer's technical representative for <insert hours> hours to instruct VA personnel in operation and maintenance of units.”
28 05 00 3.4.D1452–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Common Work Results For Electronic Safety And Security28 05 00 3.4.E · PDF p. 1452
Spec wording
“E. Submit training plans and instructor qualifications in accordance with the requirements of Section 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS.”
28 05 00 3.4.E1452–
Test / cert.Test / cert.The inspection and test will be conducted by a factory-certified ...Common Work Results For Electronic Safety And Security28 05 00 3.7.D · PDF p. 1459
Spec wording
“D. The inspection and test will be conducted by a factory-certified contractor representative and witnessed by a Government Representative. The results of the inspection will be officially recorded by a designated Government Representative and maintained on file by the COR, until completion of the entire project. The results will be compared to the Acceptance Test results.”
28 05 00 3.7.D1459–
O&MO&MIn accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT ...Conductors And Cables For Electronic Safety And Security28 05 13 1.5.A · PDF p. 1465
Spec wording
“A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish the following: 1. Manufacturer's Literature and Data: Showing each cable type and rating. 2. Certificates: Two weeks prior to final inspection, deliver to the COR four copies of the certification that the material is in accordance with the drawings and specifications and diagrams for cable management system. 3. Shop Drawings: ...”
28 05 13 1.5.A1465four copies; electronic copy
Test / cert.Test / cert.Document data for each measurement. Print data for submittals in ...Conductors And Cables For Electronic Safety And Security28 05 13 3.8.D · PDF p. 1478
Spec wording
“D. Document data for each measurement. Print data for submittals in a summary report that is formatted using Table 10.1 in BICSI TDMM as a guide, or transfer the data from the instrument to the computer, save as text files, print, and submit.”
28 05 13 3.8.D1478–
Test / cert.Test / cert.Prepare test and inspection reportsConductors And Cables For Electronic Safety And Security28 05 13 3.8.F · PDF p. 1478
Spec wording
“F. Prepare test and inspection reports.”
28 05 13 3.8.F1478–
Test / cert.Test / cert.The commissioning process requires review of selected Submittals that pertain ...Commissioning Of Electronic Safety And Security Systems28 08 00 1.6.A · PDF p. 1480
Spec wording
“A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.”
28 08 00 1.6.A1480–
Test / cert.Test / cert.The commissioning process requires Submittal review simultaneously with engineering review. ...Commissioning Of Electronic Safety And Security Systems28 08 00 1.6.B · PDF p. 1480
Spec wording
“B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.”
28 08 00 1.6.B1480–
Test / cert.Test / cert.The Commissioning Process includes Systems Functional Performance Testing that is ...Commissioning Of Electronic Safety And Security Systems28 08 00 3.4.A · PDF p. 1481
Spec wording
“A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the Resident Engineer. ...”
28 08 00 3.4.A1481–
TrainingTrainingTraining of the VA operation and maintenance personnel is required ...Commissioning Of Electronic Safety And Security Systems28 08 00 3.5.A · PDF p. 1481-1482
Spec wording
“A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the ...”
28 08 00 3.5.A1481-1482–
Record docsRecord docsProvide a pre-installation and as-built design package in both electronic ...Physical Access Control System And Database Management28 13 16 1.4.C · PDF p. 1485
Spec wording
“C. Provide a pre-installation and as-built design package in both electronic format and on paper, minimum size 34 x 44 inches (864mm x 1118mm); drawing submittals shall be per the established project schedule.”
28 13 16 1.4.C1485electronic format
Record docsRecord docsPre-installation design and as-built packages shall include, but not be ...Physical Access Control System And Database Management28 13 16 1.4.D · PDF p. 1485-1486
Spec wording
“D. Pre-installation design and as-built packages shall include, but not be limited to: 1. Index Sheet that shall: a. Define each page of the design package to include facility name, building name, floor, and sheet number. b. Provide a list of all security abbreviations and symbols. c. Reference all general notes that are utilized within the design package. d. Specification and scope of work pages for all security ...”
28 13 16 1.4.D1485-1486–
WarrantyWarrantyWarrant PACMS work subject to the Article "Warranty of Construction" ...Physical Access Control System And Database Management28 13 16 1.6.A · PDF p. 1490
Spec wording
“A. Warrant PACMS work subject to the Article "Warranty of Construction" of FAR clause 52.246-21 and Section 280500.”
28 13 16 1.6.A1490–
WarrantyWarrantyDemonstration and training shall be performed prior to system acceptance ...Physical Access Control System And Database Management28 13 16 1.6.B · PDF p. 1490
Spec wording
“B. Demonstration and training shall be performed prior to system acceptance.”
28 13 16 1.6.B1490–
Test / cert.Test / cert.All testing and training shall be compliant with the VA ...Physical Access Control System And Database Management28 13 16 3.2.A · PDF p. 1499
Spec wording
“A. All testing and training shall be compliant with the VA General Requirements, Section 01 00 00, GENERAL REQUIREMENTS.”
28 13 16 3.2.A1499–
Test / cert.Test / cert.Perform testing and system certification as outlined in section 28 ...Physical Access Control System And Database Management28 13 16 3.2.B · PDF p. 1499
Spec wording
“B. Perform testing and system certification as outlined in section 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY.”
28 13 16 3.2.B1499–
Test / cert.Test / cert.The software shall be entered into the SMS computer systems ...Physical Access Control System And Database Management28 13 16 3.2.C · PDF p. 1499
Spec wording
“C. The software shall be entered into the SMS computer systems and debugged. The Contractor shall be responsible for documenting and entering the initial database into the system. The Contractor shall provide the necessary blank forms with instructions to fill in all the required data information that will make up the database. The database shall then be reviewed by the Contractor and entered into the system. Prior ...”
28 13 16 3.2.C1499–
Test / cert.Test / cert.Upon satisfactory on line operation of the system software, the ...Physical Access Control System And Database Management28 13 16 3.2.D · PDF p. 1499
Spec wording
“D. Upon satisfactory on line operation of the system software, the entire installation including all subsystems shall be inspected. The Contractor shall perform all tests, furnish all test equipment and consumable supplies necessary and perform any work as required to establish performance levels for the system in accordance with the specifications. Each device shall be tested as a working component of the ...”
28 13 16 3.2.D1499–
Test / cert.Test / cert.Tests shall demonstrate the response time and display format of ...Physical Access Control System And Database Management28 13 16 3.2.E · PDF p. 1499-1500
Spec wording
“E. Tests shall demonstrate the response time and display format of each different type of input sensor and output control device. Response time shall be measured with the system functioning at full capacity. Computer operation shall be tested with the complete data file.”
28 13 16 3.2.E1499-1500–
Test / cert.Test / cert.The Contractor shall provide a competent trainer who has extensive ...Physical Access Control System And Database Management28 13 16 3.2.F · PDF p. 1500
Spec wording
“F. The Contractor shall provide a competent trainer who has extensive experience on the installed systems and in delivering training to provide the instruction. As an alternative, the Contractor may propose the use of factory training personnel and coordinate the number of personnel to be trained.”
28 13 16 3.2.F1500–
Record docsRecord docsProvide a shop drawing and as-built design package in both ...Intrusion Detection System28 16 00 1.5.C · PDF p. 1503
Spec wording
“C. Provide a shop drawing and as-built design package in both electronic format and on paper, minimum size 1220 x 1220 millimeters (48 x 48 inches); drawing submittals shall be per the established project schedule.”
28 16 00 1.5.C1503electronic format
Test / cert.Test / cert.Completed System Readiness Checklists provided by the Commissioning Agent and ...Intrusion Detection System28 16 00 1.5.H · PDF p. 1505
Spec wording
“H. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS.”
28 16 00 1.5.H1505–
WarrantyWarrantyWarrant IDS work subject to the Article "Warranty of Construction" ...Intrusion Detection System28 16 00 1.9.A · PDF p. 1507
Spec wording
“A. Warrant IDS work subject to the Article "Warranty of Construction" of FAR 52.246-21.”
28 16 00 1.9.A1507–
WarrantyWarrantyDemonstration and training shall be performed prior to system acceptance ...Intrusion Detection System28 16 00 1.9.B · PDF p. 1507
Spec wording
“B. Demonstration and training shall be performed prior to system acceptance.”
28 16 00 1.9.B1507–
Test / cert.Test / cert.The Commissioning Agent will observe startup and contractor testing of ...Intrusion Detection System28 16 00 3.4.A · PDF p. 1523
Spec wording
“A. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and Commissioning Agent. Provide a minimum of 7 days prior notice.”
28 16 00 3.4.A1523–
TrainingTrainingAll testing and training shall be compliant with the VA ...Intrusion Detection System28 16 00 3.6.A · PDF p. 1523
Spec wording
“A. All testing and training shall be compliant with the VA General Requirements, Section 01 00 00, GENERAL REQUIREMENTS.”
28 16 00 3.6.A1523–
TrainingTrainingProvide services of manufacturer's technical representative for [insert number] hours ...Intrusion Detection System28 16 00 3.6.B · PDF p. 1524
Spec wording
“B. Provide services of manufacturer's technical representative for [insert number] hours to instruct VA personnel in operation and maintenance of units.”
28 16 00 3.6.B1524–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Intrusion Detection System28 16 00 3.6.C · PDF p. 1524
Spec wording
“C. Submit training plans and instructor qualifications in accordance with the requirements of Section 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS. -----END----”
28 16 00 3.6.C1524–
Record docsRecord docsProvide a pre-installation and as-built design package in both electronic ...Video Surveillance28 23 00 1.5.C · PDF p. 1528
Spec wording
“C. Provide a pre-installation and as-built design package in both electronic format and on paper, minimum size 1220 x 1220 millimeters (48 x 48 inches); drawing submittals shall be per the established project schedule.”
28 23 00 1.5.C1528electronic format
Record docsRecord docsPre-installation design and as-built packages shall include, but not be ...Video Surveillance28 23 00 1.5.D · PDF p. 1528-1530
Spec wording
“D. Pre-installation design and as-built packages shall include, but not be limited to: 1. Index Sheet that shall: a. Define each page of the design package to include facility name, building name, floor, and sheet number. b. Provide a list of all security abbreviations and symbols. c. Reference all general notes that are utilized within the design package. d. Specification and scope of work pages for all security ...”
28 23 00 1.5.D1528-1530–
Test / cert.Test / cert.Submit completed System Readiness Checklists provided by the Commissioning Agent ...Video Surveillance28 23 00 1.5.H · PDF p. 1531
Spec wording
“H. Submit completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS.”
28 23 00 1.5.H1531–
WarrantyWarrantyWarrant VASS System work subject to the Article "Warranty of ...Video Surveillance28 23 00 1.8.A · PDF p. 1532
Spec wording
“A. Warrant VASS System work subject to the Article "Warranty of Construction" of FAR clause 52.246-21.”
28 23 00 1.8.A1532–
WarrantyWarrantyDemonstration and training shall be performed prior to system acceptance ...Video Surveillance28 23 00 1.8.B · PDF p. 1532
Spec wording
“B. Demonstration and training shall be performed prior to system acceptance.”
28 23 00 1.8.B1532–
Test / cert.Test / cert.The Contractor shall not apply power to the VASS System ...Video Surveillance28 23 00 3.3.A · PDF p. 1573
Spec wording
“A. The Contractor shall not apply power to the VASS System until the following items have been completed: 1. VASS System equipment items and have been set up in accordance with manufacturer's instructions. 2. A visual inspection of the VASS System has been conducted to ensure that defective equipment items have not been installed and that there are no loose connections. 3. System wiring has been tested and verified ...”
28 23 00 3.3.A1573–
Test / cert.Test / cert.The Commissioning Agent will observe startup and contractor testing of ...Video Surveillance28 23 00 3.3.B · PDF p. 1573
Spec wording
“B. The Commissioning Agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the COR and Commissioning Agent. Provide a minimum of 7 days prior notice.”
28 23 00 3.3.B1573–
Test / cert.Test / cert.Satisfaction of the above requirements shall not relieve the Contractor ...Video Surveillance28 23 00 3.3.C · PDF p. 1573
Spec wording
“C. Satisfaction of the above requirements shall not relieve the Contractor of responsibility for incorrect installation, defective equipment items, or collateral damage as a result of Contractor work efforts.”
28 23 00 3.3.C1573–
Test / cert.Test / cert.Provide commissioning documentation in accordance with the requirements of Section ...Video Surveillance28 23 00 3.5.A · PDF p. 1574
Spec wording
“A. Provide commissioning documentation in accordance with the requirements of Section 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the Commissioning Agent.”
28 23 00 3.5.A1574–
Test / cert.Test / cert.Components provided under this section of the specification will be ...Video Surveillance28 23 00 3.5.B · PDF p. 1574
Spec wording
“B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 28 08 00 – "COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS" and related sections for contractor responsibilities for system commissioning.”
28 23 00 3.5.B1574–
TrainingTrainingAll testing and training shall be compliant with the VA ...Video Surveillance28 23 00 3.6.A · PDF p. 1574
Spec wording
“A. All testing and training shall be compliant with the VA General Requirements, Section 01 00 00, "GENERAL REQUIREMENTS".”
28 23 00 3.6.A1574–
TrainingTrainingProvide services of manufacturer's technical representative for [four] <insert hours> ...Video Surveillance28 23 00 3.6.B · PDF p. 1574
Spec wording
“B. Provide services of manufacturer's technical representative for [four] <insert hours> hours to instruct VA personnel in operation and maintenance of units.”
28 23 00 3.6.B1574–
TrainingTrainingSubmit training plans and instructor qualifications in accordance with the ...Video Surveillance28 23 00 3.6.C · PDF p. 1574
Spec wording
“C. Submit training plans and instructor qualifications in accordance with the requirements of Section 28 08 00 – "COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS". -----END----”
28 23 00 3.6.C1574–
WarrantyWarrantyWarrant EPPS System work subject to the Article "Warranty of ...Electronic Personal Protection System28 26 00 1.8.A · PDF p. 1584
Spec wording
“A. Warrant EPPS System work subject to the Article "Warranty of Construction" of FAR clause 52.246-21.”
28 26 00 1.8.A1584–
WarrantyWarrantyDemonstration and training shall be performed prior to system acceptance ...Electronic Personal Protection System28 26 00 1.8.B · PDF p. 1584
Spec wording
“B. Demonstration and training shall be performed prior to system acceptance.”
28 26 00 1.8.B1584–
TrainingTrainingEngage a factory-authorized service representative to train Owner's maintenance personnel ...Electronic Personal Protection System28 26 00 3.7.A · PDF p. 1593
Spec wording
“A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain electronic personal protection system (EPSS) equipment. 1. Train Owner's maintenance personnel on procedures and schedules for troubleshooting, servicing, and maintaining equipment. 2. Demonstrate methods of determining optimum alignment and adjustment of components and settings for system ...”
28 26 00 3.7.A1593–
TrainingTrainingAll testing and training shall be compliant with the VA ...Electronic Personal Protection System28 26 00 3.9.A · PDF p. 1594
Spec wording
“A. All testing and training shall be compliant with the VA General Requirements, Section 01 00 00, GENERAL REQUIREMENTS and Section 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY. -----END----”
28 26 00 3.9.A1594–
Record docsRecord docsDrawings:Fire Detection And Alarm28 31 00 1.4.B · PDF p. 1597-1598
Spec wording
“B. Drawings: 1. Deleted. 2. Floor plans: Provide locations of all devices (with device number at each addressable device corresponding to control unit programming), appliances, panels, equipment, junction/terminal cabinets/boxes, risers, electrical power connections, individual circuits and raceway routing, system zoning; number, size, and type of raceways and conductors in each raceway; conduit fill calculations ...”
28 31 00 1.4.B1597-15983 sets; one set; AutoCAD
O&MO&MManuals:Fire Detection And Alarm28 31 00 1.4.C · PDF p. 1598-1599
Spec wording
“C. Manuals: 1. Submit simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets for all items used in the system, power requirements, device wiring diagrams, dimensions, and information for ordering replacement parts. a. Wiring diagrams shall have their terminals identified to facilitate installation, operation, expansion and maintenance. ...”
28 31 00 1.4.C1598-1599binder; 4 copies
WarrantyWarrantyAll work performed and all material and equipment furnished under ...Fire Detection And Alarm28 31 00 1.5 · PDF p. 1600
Spec wording
“All work performed and all material and equipment furnished under this contract shall be free from defects and shall remain so for a period of one year from the date of acceptance of the entire installation by the Contracting Officer.”
28 31 00 1.51600–

Division 31 Earthwork 1 item

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Furnish to COR:Earthwork31 20 00 1.7.C · PDF p. 1618-1619
Spec wording
“C. Furnish to COR: 1. Contactor shall furnish resumes with all personnel involved in the project including Project Manager, Superintendent, and on-site Engineer. Project Manager and Superintendent should have at least 3 years of experience on projects of similar size. 2. Soil samples. a. Classification in accordance with ASTM D2487 for each on-site or borrow soil material proposed for fill, backfill, engineered ...”
31 20 00 1.7.C1618-1619–

Division 32 Paving and site improvements 7 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Test reportsCement And Concrete For Exterior Improvements32 05 23 1.5.E · PDF p. 1639
Spec wording
“E. Test reports: Certify products comply with specifications. 1. Concrete materials. 2. Select subbase materials. 3. Field test reports.”
32 05 23 1.5.E1639–
WarrantyWarrantyConstruction WarrantyCement And Concrete For Exterior Improvements32 05 23 1.10.A · PDF p. 1641
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
32 05 23 1.10.A1641–
WarrantyWarrantyManufacturer's Literature and Data:Planting32 90 00 1.6.B · PDF p. 1653-1654
Spec wording
“B. Manufacturer's Literature and Data: 1. Description of each product. 2. Photographs: Color photographs of each plant species showing actual size and condition of plants to be provided with measuring device included for scale. Where more than 20 plants are required of any species, submit minimum three photographs of average, best, and worst quality plant to be provided. Include on each photograph, plant full ...”
32 90 00 1.6.B1653-1654–
Test / cert.Test / cert.Test reportsPlanting32 90 00 1.6.E · PDF p. 1654
Spec wording
“E. Test reports: Certify products comply with specifications.”
32 90 00 1.6.E1654–
O&MO&MOperation and Maintenance Data:Planting32 90 00 1.6.H · PDF p. 1654
Spec wording
“H. Operation and Maintenance Data: 1. Care instructions for each plant material.”
32 90 00 1.6.H1654–
WarrantyWarrantyConstruction WarrantyPlanting32 90 00 1.11.A · PDF p. 1658
Spec wording
“A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction."”
32 90 00 1.11.A1658–
WarrantyWarrantyManufacturer's WarrantyPlanting32 90 00 1.11.B · PDF p. 1658
Spec wording
“B. Manufacturer's Warranty: Warrant plantings and against material defects. 1. Warranty Period: Two years. 2. Plant and Turf Warranty Periods will begin from date of Government acceptance of project or phase for beneficial use and occupancy. 3. Contracting Officer's Representative will reinspect plants and turf at end of Warranty Period. Replace any dead, missing, or defective plant material and turf immediately. ...”
32 90 00 1.11.B1658–

Don't want to chase all of this yourself?

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.