Closeout checklist: Repair Building 100, Fort McCoy (U.S. Army, Fort McCoy, WI)
Every closeout item we found in the public spec book for this job: 177 items across Division 01, 12 trade divisions, including 52 O&M manual items, 47 warranties and 25 tests and certificates. Each one is tied to its spec section and the PDF page it sits on.
- Owner
- U.S. Army, Mission and Installation Contracting Command (MICC) Fort McCoy
- Number
- Solicitation W911SA25BA008
- Location
- Fort McCoy, WI
- Contract signed
- 2025-08-20
- Public spec book
- Solicitation notice on SAM.gov
Public notice in the PIEE Solicitation Module (spec book attached) - Spec book size
- 619 PDF pages
- Checklist built
- 2026-10-21
Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.
Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.
Email [email protected]This book uses the older 5-digit MasterFormat numbers (15xxx mechanical, 16xxx electrical) and has no separate closeout section, so most items come from the trade sections.
Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.
What this job asks for at closeout
All 177 items, by trade
Division 01 General requirements 15 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.All plumbing work shall be performed by a state certified ...General Requirements01000 1.05.B · PDF p. 12Spec wording“B. All plumbing work shall be performed by a state certified journeyman plumber. All plumbing work shall be supervised full time on site by a state certified Master plumber. Proof of certification is required. The cost of the work shall include all State permit fees and approval for the installation of backflow prevention devices.” | 01000 1.05.B | 12 | – |
| Test / cert. | Test / cert.All electrical work shall be supervised full time on site ...General Requirements01000 1.05.C · PDF p. 12Spec wording“C. All electrical work shall be supervised full time on site by a state certified journeyman electrician. All electrical work shall be overseen by a state certified Master electrician. Proof of certification is required.” | 01000 1.05.C | 12 | – |
| Test / cert. | Test / cert.All hazardous material abatement shall be supervised by a certified ...General Requirements01000 1.05.D · PDF p. 12Spec wording“D. All hazardous material abatement shall be supervised by a certified asbestos supervisor and a certified lead base paint supervisor.” | 01000 1.05.D | 12 | – |
| Test / cert. | Test / cert.All work associated with air-conditioning refrigerant shall be conducted by ...General Requirements01000 1.05.E · PDF p. 12Spec wording“E. All work associated with air-conditioning refrigerant shall be conducted by an Air-Conditioning Refrigerant Institute Certified Technician; Type-Universal. All work shall also be conducted in accordance with Federal Law "40 CFR Part 82 subpart F and Parts 273, 279, and 761" and U.S. Environmental Protection Agency "Clean Air Act (1990) Section 608" and all EPA final regulations associated with section 608.” | 01000 1.05.E | 12 | – |
| O&M | O&MProvide one (1) PDF copy of equipment maintenance and operation ...General Requirements01000 1.07.A · PDF p. 12Spec wording“A. Provide one (1) PDF copy of equipment maintenance and operation manuals for all major pieces of equipment and fixtures. Where the Contractor has installed entire systems or has assembled or interconnected several subsystems such as heating, ventilating, or special electrical systems, the Contractor shall include a written narrative of how each system or subsystem operates and how the overall system is intended ...” | 01000 1.07.A | 12 | |
| O&M | O&MDrawings:General Requirements01000 1.07.B · PDF p. 12-13Spec wording“B. Drawings: 1. Supplement product data with drawings as necessary to clearly illustrate: a. Relations of component parts of equipment and systems. b. Control and flow diagrams. 2. Coordinate drawings with the information in project record documents to assure correct illustration of completed installation.” | 01000 1.07.B | 12-13 | – |
| O&M | O&MWritten text, as required to supplement product data for the ...General Requirements01000 1.07.C · PDF p. 13Spec wording“C. Written text, as required to supplement product data for the particular installation: 1. Organize in consistent format under separate headings for different procedures. 2. Provide logical sequence of instructions for each procedure.” | 01000 1.07.C | 13 | – |
| O&M | O&MContent, for each unit of equipment and system, as appropriate:General Requirements01000 1.07.D · PDF p. 13-14Spec wording“D. Content, for each unit of equipment and system, as appropriate: 1. Description of unit and component parts; a. Function, normal operating characteristics, and limiting conditions. b. Performance curves, engineering data, and test results. c. Complete nomenclature and commercial number of replaceable parts. 2. Operating procedures; a. Start-up, break-in, routine, and normal operating instructions. b. Regulation, ...” | 01000 1.07.D | 13-14 | – |
| O&M | O&MPrepare and include additional data when the need for such ...General Requirements01000 1.07.E · PDF p. 14Spec wording“E. Prepare and include additional data when the need for such data becomes apparent for the training of government personnel.” | 01000 1.07.E | 14 | – |
| Warranty | WarrantyAll materials and workmanship shall be warranted by the Contractor ...General Requirements01000 1.12.A · PDF p. 15Spec wording“A. All materials and workmanship shall be warranted by the Contractor for a period of not less than one year from the date of final acceptance by the Government, except when longer warranties are required from the Contractor as stated in each specification section.” | 01000 1.12.A | 15 | – |
| Warranty | WarrantyFor products and materials that are normally warranted by the ...General Requirements01000 1.12.B · PDF p. 15Spec wording“B. For products and materials that are normally warranted by the manufacturer or supplier for more than one year, the Contractor shall provide the Government with a written warranty, or certification, indicating the manufacturer's or supplier's terms and conditions of the warranty.” | 01000 1.12.B | 15 | – |
| Warranty | WarrantyContractor shall populate and submit a Warranty Item Tracking spreadsheet; ...General Requirements01000 1.12.C · PDF p. 15-16Spec wording“C. Contractor shall populate and submit a Warranty Item Tracking spreadsheet; that which is covered under part A. The spreadsheet shall be provided to the contractor upon request of the government COR. The spreadsheet shall outline each piece of extended warranty equipment provided. Extended warranty shall be anything beyond one calendar year from the Beneficial Occupancy Date. Item information will include the ...” | 01000 1.12.C | 15-16 | – |
| Warranty | WarrantyContractor shall develop, populate, and submit a Warranty Item Tracking ...General Requirements01000 1.12.D · PDF p. 16Spec wording“D. Contractor shall develop, populate, and submit a Warranty Item Tracking spreadsheet for Equipment that has been demolished or replaced during a renovation. Demolished or removed equipment shall be reported on a Removed Item Tracking spreadsheet. Contractor shall develop, populate, and submit the spreadsheet with equipment information to include: equipment description, make, model, serial number, capacity and ...” | 01000 1.12.D | 16 | – |
| Test / cert. | Test / cert.Contractor must complete all required paperwork as identified in Section ...Hazardous Material Abatement01031 2.01.B · PDF p. 31Spec wording“B. Contractor must complete all required paperwork as identified in Section 1.02 above. All reports must be filed with the appropriate agencies. Copies of all reports shall be submitted at the same time to the KO, Construction Inspector/Asbestos Supervisor, Environmental Division.” | 01031 2.01.B | 31 | – |
| Test / cert. | Test / cert.Contractor may not start construction on buildings assigned to the ...Hazardous Material Abatement01031 2.01.D · PDF p. 31Spec wording“D. Contractor may not start construction on buildings assigned to the contract until all ACM is removed and all clearance sample results are back from the certified laboratory. Air Clearance Samples, if done, must test .01 f/cc or less before construction begins.” | 01031 2.01.D | 31 | – |
Division 03 Concrete 2 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Test Reports:Quality Control - Concrete03030 1.03 · PDF p. 48Spec wording“Test Reports: 1. Field Reports: Slump and Air Content Test Reports 2. Laboratory Reports: Compressive Strength Test Reports” | 03030 1.03 | 48 | – |
| Test / cert. | Test / cert.Delivery Tickets – Ready-mixed concrete producer shall furnish duplicate delivery ...Cast-In-Place Concrete03300 1.04.B · PDF p. 58Spec wording“B. Delivery Tickets – Ready-mixed concrete producer shall furnish duplicate delivery tickets. Contractor shall retain one ticket and attach other to laboratory test report (Section 03030). Delivery tickets shall indicate delivery date, type or concrete, class, cement content, and amount of water.” | 03300 1.04.B | 58 | – |
Division 06 Wood and plastics 4 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.SD-06 Test Reports Test Report ResultsSolid Surfacing Fabrications06 61 16 1.3 · PDF p. 81-82Spec wording“SD-06 Test Reports Test Report Results” | 06 61 16 1.3 | 81-82 | – |
| Test / cert. | Test / cert.SD-07 Certificates Qualifications Indoor Air Quality for solid surface ...Solid Surfacing Fabrications06 61 16 1.3 · PDF p. 81-82Spec wording“SD-07 Certificates Qualifications Indoor Air Quality for solid surface fabrication products; S” | 06 61 16 1.3 | 81-82 | – |
| O&M | O&MSD-10 Operation and Maintenance Data Solid Polymer, Data Package 1; G ...Solid Surfacing Fabrications06 61 16 1.3 · PDF p. 81-82Spec wording“SD-10 Operation and Maintenance Data Solid Polymer, Data Package 1; G Quartz Agglomerate Material, Data Package 1; G” | 06 61 16 1.3 | 81-82 | – |
| Warranty | WarrantyProvide manufacturer's warranty to repair or replace defective materials[, excluding ...Solid Surfacing Fabrications06 61 16 1.6 · PDF p. 83Spec wording“Provide manufacturer's warranty to repair or replace defective materials[, excluding damages caused by physical or chemical abuse or excessive heat, and workmanship for a period of 10 years from date of final acceptance of the work.” | 06 61 16 1.6 | 83 | – |
Division 07 Roofing, insulation and waterproofing 12 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Warranty | WarrantyManufacturer's WarrantySheet Waterproofing07130 1.03.D · PDF p. 90Spec wording“D. Manufacturer's Warranty: 5 years from installation date on material (3 copies).” | 07130 1.03.D | 90 | 3 copies |
| Test / cert. | Test / cert.Product Test ReportsVapor Retarders07260 1.4 · PDF p. 104Spec wording“Product Test Reports: For each product, for tests performed by a qualified testing agency.” | 07260 1.4 | 104 | – |
| Warranty | WarrantyWarrantyAsphalt Shingles07310 1.03.C · PDF p. 106Spec wording“C. Warranty: Shingle manufacturer's 30-year warranty” | 07310 1.03.C | 106 | – |
| Warranty | WarrantyMaintenance ManualMetal Soffit And Facia Systems07461 1.03.D · PDF p. 110Spec wording“D. Maintenance Manual: Provide to Owner, maintenance and warranty data in "Maintenance Manual" at maintenance demonstration at Substantial Completion.” | 07461 1.03.D | 110 | – |
| Test / cert. | Test / cert.Product Test ReportsFiber-Cement Siding07464 1.5.B · PDF p. 114Spec wording“B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for fiber-cement siding.” | 07464 1.5.B | 114 | – |
| O&M | O&MMaintenance DataFiber-Cement Siding07464 1.6 · PDF p. 115Spec wording“Maintenance Data: For each type of product, including related accessories, to include in maintenance manuals.” | 07464 1.6 | 115 | – |
| Spare parts | Spare partsFurnish extra materials that match products installed and that are ...Fiber-Cement Siding07464 1.7 · PDF p. 115Spec wording“Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. Furnish full lengths of fiber-cement siding including related accessories equal to 2% of amount installed.” | 07464 1.7 | 115 | – |
| Warranty | WarrantySpecial WarrantyFiber-Cement Siding07464 1.10 · PDF p. 115Spec wording“Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or workmanship within specified warranty period.” | 07464 1.10 | 115 | – |
| Warranty | WarrantyFailures include, but are not limited to, the following:Fiber-Cement Siding07464 1.10.A · PDF p. 115Spec wording“A. Failures include, but are not limited to, the following: 1. Structural failures including cracking and deforming. 2. Deterioration of materials beyond normal weathering.” | 07464 1.10.A | 115 | – |
| Warranty | WarrantyWarranty PeriodFiber-Cement Siding07464 1.10.B · PDF p. 115Spec wording“B. Warranty Period: 25 years from date of Substantial Completion.” | 07464 1.10.B | 115 | – |
| Warranty | WarrantySpecial Installer's WarrantyJoint Sealants07920 1.05.A · PDF p. 120Spec wording“A. Special Installer's Warranty: Installer's standard form in which Installer agrees to repair or replace elastomeric joint sealants that do not comply with performance and other requirements specified within two (2) years from date of Government acceptance.” | 07920 1.05.A | 120 | – |
| Warranty | WarrantySpecial Manufacturer's WarrantyJoint Sealants07920 1.05.B · PDF p. 120Spec wording“B. Special Manufacturer's Warranty: Manufacturer's standard form in which elastomeric sealant manufacturer agrees to furnish elastomeric joint sealants to repair or replace those that do not comply with performance and other requirements specified within two (2) years from date of Government acceptance.” | 07920 1.05.B | 120 | – |
Division 08 Doors, windows and hardware 14 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Warranty | WarrantyWarrantyFlush Wood Doors08211 1.03.C · PDF p. 130Spec wording“C. Warranty: Provide manufacturer's 5-year written guarantee for door assembly. Include coverage for delaminating of veneer, warping beyond specified installation tolerances, defective materials and telegraphing core construction.” | 08211 1.03.C | 130 | – |
| Record docs | Record docsRecord DocumentsAccess Doors And Frames08311 1.4 · PDF p. 132Spec wording“Record Documents: For fire-rated doors, list of applicable room name and number in which access door is located.” | 08311 1.4 | 132 | – |
| Record docs | Record docsRecord DocumentsFloor Doors08348 1.4.A · PDF p. 135Spec wording“A. Record Documents: For fire-rated floor doors, list of applicable room name and number in which floor door is located.” | 08348 1.4.A | 135 | – |
| Test / cert. | Test / cert.Test Results:Aluminum-Framed Entrances And Storefronts08412 1.03.F · PDF p. 139Spec wording“F. Test Results: 1. Product Test Reports: Based on evaluation of comprehensive tests performed by qualified testing agency, for aluminum-framed systems. 2. Field quality-control test and inspection reports.” | 08412 1.03.F | 139 | – |
| O&M | O&MMaintenance DataAluminum-Framed Entrances And Storefronts08412 1.03.G · PDF p. 139Spec wording“G. Maintenance Data: For aluminum-framed systems to include in maintenance manuals.” | 08412 1.03.G | 139 | – |
| Warranty | WarrantyWarrantiesAluminum-Framed Entrances And Storefronts08412 1.03.H · PDF p. 139Spec wording“H. Warranties: Special warranties specified in this Section.” | 08412 1.03.H | 139 | – |
| Warranty | WarrantySpecial Assembly WarrantyAluminum-Framed Entrances And Storefronts08412 1.06.A · PDF p. 140Spec wording“A. Special Assembly Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of aluminum-framed systems that do not comply with requirements or that deteriorate as defined in this Section within specified warranty period. 1. Failures include, but are not limited to, following: a. Structural failures including, but not limited to, excessive deflection. b. Noise or vibration ...” | 08412 1.06.A | 140 | – |
| Warranty | WarrantySpecial Finish WarrantyAluminum-Framed Entrances And Storefronts08412 1.06.B · PDF p. 140Spec wording“B. Special Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components on which finishes fail within specified warranty period. Warranty does not include normal weathering. 1. Warranty Period: 20 years from date of Substantial Completion.” | 08412 1.06.B | 140 | – |
| Test / cert. | Test / cert.Test Reports and Calculations (if requested):Aluminum Windows08520 1.04.D · PDF p. 148Spec wording“D. Test Reports and Calculations (if requested): 1. Submit certified independent laboratory test reports verifying compliance with all test requirements. 2. Submit structural calculations prepared by a Registered Professional Engineer indicating adequacy of all materials furnished under this section, to meet the uniform and structural load requirements.” | 08520 1.04.D | 148 | – |
| Warranty | WarrantyAluminum Window Warranty:Aluminum Windows08520 1.07.A · PDF p. 149Spec wording“A. Aluminum Window Warranty: 1. Products: Submit a written warranty, executed by the window manufacturer, for a period of 10 years from the date of manufacture, against defective materials or workmanship, including substantial non-compliance with applicable specification requirements and industry standards, which result in premature failure of the windows, finish, factory-glazed glass, or parts, outside of normal ...” | 08520 1.07.A | 149 | – |
| Warranty | WarrantyInstallationAluminum Windows08520 1.07.B · PDF p. 149Spec wording“B. Installation: Submit a written warranty, executed by the window installer, for a period of 5 years from the date of substantial completion, against defective materials or workmanship, including substantial non-compliance with applicable specification requirements, which result in premature failure. In the event that installation of windows or components is found to be defective, installer will repair or provide ...” | 08520 1.07.B | 149 | – |
| Test / cert. | Test / cert.Preconstruction adhesion and compatibility test reportGlazing08810 1.4 · PDF p. 158Spec wording“Preconstruction adhesion and compatibility test report.” | 08810 1.4 | 158 | – |
| Warranty | WarrantyManufacturer's Special Warranty for Insulating GlassGlazing08810 1.7 · PDF p. 159Spec wording“Manufacturer's Special Warranty for Insulating Glass: Manufacturer agrees to replace insulating-glass units that deteriorate within specified warranty period. Deterioration of insulating glass is defined as failure of hermetic seal under normal use that is not attributed to glass breakage or to maintaining and cleaning insulating glass contrary to manufacturer's written instructions. Evidence of failure is the ...” | 08810 1.7 | 159 | – |
| Warranty | WarrantyProvide manufacturer's written 20-year warranty for materials and workmanship ...Louvers And Vents08900 1.07 · PDF p. 164Spec wording“Provide manufacturer's written 20-year warranty for materials and workmanship.” | 08900 1.07 | 164 | – |
Division 09 Finishes 14 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Warranty | WarrantyWarranty Provide manufacturer's standard one-year warranty against defects in manufacturing ...Resilient Vinyl Sheet Flooring09653 1.03.C · PDF p. 177Spec wording“C. Warranty Provide manufacturer's standard one-year warranty against defects in manufacturing and workmanship of resilient flooring products. Provide manufacturer's standard limited wear warranty/conductivity warranty as specified under each product as applicable.” | 09653 1.03.C | 177 | – |
| Warranty | WarrantyWhen the installation is complete, the manufacturer shall submit (1) ...Carpet - Broadloom09680 1.05.A · PDF p. 183Spec wording“A. When the installation is complete, the manufacturer shall submit (1) a certificate of recycling, which describes the method by which the uplifted carpet was recycled; and (2) a warranty of recycling, which specifies the method by which the new carpet tile will be recycled at the end of its useful life.” | 09680 1.05.A | 183 | – |
| O&M | O&MOperation and Maintenance Data (O&M):Carpet - Broadloom09680 1.05.B · PDF p. 183Spec wording“B. Operation and Maintenance Data (O&M): 1. Methods for maintaining carpet, including manufacturer's recommended frequency for maintaining carpet. 2. Precautions for cleaning materials and methods that could be detrimental to finishes and performance. 3. Include cleaning and stain-removal products and procedures.” | 09680 1.05.B | 183 | – |
| Warranty | WarrantyProvide carpet manufacturer's 10-year warranty against defects in materials ...Carpet - Broadloom09680 1.12.A · PDF p. 184Spec wording“A. Provide carpet manufacturer's 10-year warranty against defects in materials.” | 09680 1.12.A | 184 | – |
| Warranty | WarrantyWarrantyCarpet - Broadloom09680 1.12.B · PDF p. 184-185Spec wording“B. Warranty: Include coverage for: 1. Surface Wear: Not more than 10 percent by weight throughout life of product. 2. Static: Maintain static generation at less than 3.5 kV at 70 degrees F, and 20 percent R.H. throughout life of product. 3. No delamination throughout life of product. 4. No edge ravels throughout life of product. 5. Provide tuft bind consistent with industry standards. 6. Recycling: Used broadloom ...” | 09680 1.12.B | 184-185 | – |
| Warranty | WarrantyWhen the installation is complete, the manufacturer shall deliver:Tile Carpeting09681 1.05.A · PDF p. 192Spec wording“A. When the installation is complete, the manufacturer shall deliver: 1. A certificate of recycling, which describes the method by which the uplifted carpet was recycled. 2. A warranty of recycling, which specifies the method by which the new carpet tile will be recycled at the end of its useful life.” | 09681 1.05.A | 192 | – |
| O&M | O&MOperation and Maintenance Data (O&M):Tile Carpeting09681 1.05.B · PDF p. 192Spec wording“B. Operation and Maintenance Data (O&M): 1. Methods for maintaining carpet, including manufacturer's recommended fre-quency for maintaining carpet. 2. Precautions for cleaning materials and methods that could be detrimental to fin-ishes and performance. 3. Include cleaning and stain-removal products and procedures.” | 09681 1.05.B | 192 | – |
| Warranty | WarrantyProvide carpet manufacturer's 10-year warranty against defects in materials ...Tile Carpeting09681 1.12.A · PDF p. 193Spec wording“A. Provide carpet manufacturer's 10-year warranty against defects in materials.” | 09681 1.12.A | 193 | – |
| Warranty | WarrantyWarrantyTile Carpeting09681 1.12.B · PDF p. 193-194Spec wording“B. Warranty: Include coverage for: 1. Surface Wear: Not more than 10 percent by weight throughout life of product. 2. Static: Maintain static generation at less than 3.5 kV at 70 degrees F, and 20 per-cent R.H. throughout life of product. 3. No delamination throughout life of product. 4. No edge ravels throughout life of product. 5. Provide tuft bind consistent with industry standards. 6. Recycling: Used carpet ...” | 09681 1.12.B | 193-194 | – |
| Spare parts | Spare partsFurnish extra materials, from the same product run, that match ...Tile Carpeting09681 1.13 · PDF p. 194Spec wording“Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.” | 09681 1.13 | 194 | – |
| Spare parts | Spare partsCarpet TileTile Carpeting09681 1.13.A · PDF p. 194Spec wording“A. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10.67 sq. yd.” | 09681 1.13.A | 194 | Full-size |
| Spare parts | Spare partsExtra material to be turned to over Government; contact Work ...Tile Carpeting09681 1.13.B · PDF p. 194Spec wording“B. Extra material to be turned to over Government; contact Work Reception Help Desk at 608-388-4357.” | 09681 1.13.B | 194 | – |
| Warranty | WarrantySubmit written proof of ability to supply a 100% two ...Interior Repainting09920 1.06.B · PDF p. 206Spec wording“B. Submit written proof of ability to supply a 100% two (2) year Maintenance Bond, if Paint Association warranty option is not used with Bid Submission.” | 09920 1.06.B | 206 | – |
| Spare parts | Spare partsAt project completion provide properly packaged maintenance materials as noted ...Interior Repainting09920 1.06.H · PDF p. 207Spec wording“H. At project completion provide properly packaged maintenance materials as noted herein and obtain a signed receipt.” | 09920 1.06.H | 207 | – |
Division 10 Specialties 2 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| O&M | O&MSD-10 Operation and Maintenance Data Approved Manufacturer's Instructi ...Interior Signage10 14 00.20 1.2 · PDF p. 217-218Spec wording“SD-10 Operation and Maintenance Data Approved Manufacturer's Instructions; G Protection and Cleaning; G 1.3 EXTRA MATERIALS – Not used.” | 10 14 00.20 1.2 | 217-218 | – |
| Warranty | WarrantyProvide manufacturer's warranty to repair or replace defective interior signage ...Interior Signage10 14 00.20 1.6 · PDF p. 219Spec wording“Provide manufacturer's warranty to repair or replace defective interior signage materials and workmanship for a period of two (2) years from date of final acceptance of the work.” | 10 14 00.20 1.6 | 219 | – |
Division 13 Special construction 6 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| O&M | O&MSubmit sufficient quantities of data sheets and shop drawings to ...Common Work Results For Fire Suppression13900 1.14.G · PDF p. 236Spec wording“G. Submit sufficient quantities of data sheets and shop drawings to allow the following distribution: 1. Operating and Maintenance Manuals 2 Copies. 2. Contracting Officer / COR 3 Copies.” | 13900 1.14.G | 236 | 2 Copies; 3 Copies |
| O&M | O&MAll Operations and Maintenance (O&M) Data shall comply with the ...Common Work Results For Fire Suppression13900 1.15.A · PDF p. 236Spec wording“A. All Operations and Maintenance (O&M) Data shall comply with the submission and content requirements specified under Division 01.” | 13900 1.15.A | 236 | – |
| O&M | O&MIn addition to the general content specified under Division 01 ...Common Work Results For Fire Suppression13900 1.15.B · PDF p. 237Spec wording“B. In addition to the general content specified under Division 01 supply the following additional documentation. The Engineer and Commissioning Provider to define detailed operation and maintenance data requirements for equipment specifications added to this section. 1. Copies of all approved submittals along with approval letters. 2. Manufacturer's wiring diagrams for electrically powered equipment. 3. Records of ...” | 13900 1.15.B | 237 | – |
| Training | TrainingInstruct Government personnel in the proper operation, maintenance and testing ...Common Work Results For Fire Suppression13900 1.16 · PDF p. 237Spec wording“Instruct Government personnel in the proper operation, maintenance and testing of systems and equipment provided as part of this project. Include not less than 4 hours of instruction, using the Operating and Maintenance manuals and record drawings during this instruction. Demonstrate testing, startup and shutdown procedures for all equipment. All training to be during normal working hours. Videotape all ...” | 13900 1.16 | 237 | – |
| Record docs | Record docsRefer to Division 1, General RequirementsCommon Work Results For Fire Suppression13900 1.17.A · PDF p. 237Spec wording“A. Refer to Division 1, General Requirements.” | 13900 1.17.A | 237 | – |
| Record docs | Record docsIn addition to the data indicated in the General Requirements, ...Common Work Results For Fire Suppression13900 1.17.B · PDF p. 237Spec wording“B. In addition to the data indicated in the General Requirements, maintain fire protection layout record drawings and hydraulic calculations on originals prepared by the installing Contractor/Subcontractor. Include copies of these record drawings and calculations with the Operating and Maintenance manuals.” | 13900 1.17.B | 237 | – |
Division 14 Elevators and conveying 1 item
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| O&M | O&MTwo (2) copies of the manufacturer's standard maintenance manual shall ...Vertical Platform Lift14300 1.03.D · PDF p. 256Spec wording“D. Two (2) copies of the manufacturer's standard maintenance manual shall be turned over to the General Contractor for inclusion by him in the overall project Maintenance Manuals prior to the Date of Substantial Completion in accordance with Section 01000.” | 14300 1.03.D | 256 | Two (2) copies |
Division 15 Mechanical (plumbing, HVAC, fire) 75 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| O&M | O&MAll operations and maintenance (O&M) data shall comply with the ...Common Work Results For Plumbing15050 1.13.A · PDF p. 266Spec wording“A. All operations and maintenance (O&M) data shall comply with the submission and content requirements specified under Division 01.” | 15050 1.13.A | 266 | – |
| O&M | O&MIn addition to the general content specified under Division 01 ...Common Work Results For Plumbing15050 1.13.B · PDF p. 266Spec wording“B. In addition to the general content specified under Division 01 supply the following additional documentation: 1. Records of tests performed to certify compliance with system requirements. 2. Manufacturer's wiring diagrams for electrically powered equipment. 3. Certificates of inspection by regulatory agencies. 4. Valve schedules. 5. Lubrication instructions, including list/frequency of lubrication. 6. Parts ...” | 15050 1.13.B | 266 | – |
| Training | TrainingInstruct Government's personnel in the proper operation and maintenance of ...Common Work Results For Plumbing15050 1.14 · PDF p. 267Spec wording“Instruct Government's personnel in the proper operation and maintenance of systems and equipment provided as part of this project. Include not less than 8 hours of instruction, using the Operating and Maintenance manuals during this instruction. Demonstrate startup, operation and shutdown procedures for all equipment. All training to be during normal working hours. Videotape all instructions and provide the COR a ...” | 15050 1.14 | 267 | – |
| Record docs | Record docsRefer to Division 01, General Requirements, Record DrawingsCommon Work Results For Plumbing15050 1.15 · PDF p. 267Spec wording“Refer to Division 01, General Requirements, Record Drawings.” | 15050 1.15 | 267 | – |
| Training | TrainingContractor to provide factory authorized representative and/or field personnel knowledgeable ...Common Work Results For Plumbing15050 3.09 · PDF p. 271Spec wording“Contractor to provide factory authorized representative and/or field personnel knowledgeable with the operations, maintenance and troubleshooting of the system and/or components defined within this section for a minimum period of 8 hours.” | 15050 3.09 | 271 | – |
| O&M | O&MAssemble material in three ring or post binders, using an ...Common Work Results For Hvac15051 1.10.A · PDF p. 274Spec wording“A. Assemble material in three ring or post binders, using an index at the front of each volume and tabs for each system or type of equipment. In addition to the data indicated in the Division 01 - General Requirements, include the following: 1. Copies of all approved shop drawings. 2. Manufacturer's wiring diagrams for electrically powered equipment. 3. Records of tests performed to certify compliance with system ...” | 15051 1.10.A | 274 | binders |
| O&M | O&MProvide to the COR a PDF file copy of all O&M ManualsCommon Work Results For Hvac15051 1.10.B · PDF p. 274Spec wording“B. Provide to the COR a PDF file copy of all O&M Manuals.” | 15051 1.10.B | 274 | |
| Training | TrainingInstruct Government personnel in the proper operation and maintenance of ...Common Work Results For Hvac15051 1.11 · PDF p. 274Spec wording“Instruct Government personnel in the proper operation and maintenance of systems and equipment provided as part of this project; video tape all training sessions. Include not less than 16 hours of instruction, using the O&M manuals during this instruction. Demonstrate startup and shutdown procedures for all equipment. All training to be during normal working hours.” | 15051 1.11 | 274 | – |
| Record docs | Record docsIn addition to the data indicated in the Division 01 ...Common Work Results For Hvac15051 1.12 · PDF p. 275Spec wording“In addition to the data indicated in the Division 01 - General Requirements, maintain temperature control record drawings on originals prepared by the installing Contractor/Subcontractor. Include copies of these record drawings with the Operating and Maintenance manuals.” | 15051 1.12 | 275 | – |
| Training | TrainingAll training provided for the Government shall comply with the ...Common Work Results For Hvac15051 3.11 · PDF p. 280Spec wording“All training provided for the Government shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 15051 3.11 | 280 | – |
| O&M | O&MOperations and Maintenance (O&M) data shall comply with the submission ...Plumbing Insulation15080 1.09 · PDF p. 296Spec wording“Operations and Maintenance (O&M) data shall comply with the submission and content requirements specified under Division 01.” | 15080 1.09 | 296 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Hvac Insulation15081 1.09 · PDF p. 302Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15081 1.09 | 302 | – |
| O&M | O&MOperations and Maintenance (O&M) data shall comply with the submission ...General Duty Valves For Plumbing Piping15110 1.07 · PDF p. 314Spec wording“Operations and Maintenance (O&M) data shall comply with the submission and content requirements specified under Division 01.” | 15110 1.07 | 314 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...General-Duty Valves For Hvac Piping15112 1.06 · PDF p. 319Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15112 1.06 | 319 | – |
| O&M | O&MOperations and Maintenance (O&M) data shall comply with the submission ...Plumbing Specialties15118 1.07 · PDF p. 330Spec wording“Operations and Maintenance (O&M) data shall comply with the submission and content requirements specified under Division 01.” | 15118 1.07 | 330 | – |
| O&M | O&MOperations and Maintenance (O&M) data shall comply with the submission ...Plumbing Piping Specialties15119 1.07 · PDF p. 336Spec wording“Operations and Maintenance (O&M) data shall comply with the submission and content requirements specified under Division 1.” | 15119 1.07 | 336 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Piping Specialties15120 1.06 · PDF p. 340Spec wording“All O&M data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15120 1.06 | 340 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Hydronic Pumps15130 1.06 · PDF p. 346Spec wording“All O&M data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15130 1.06 | 346 | – |
| Training | TrainingAll training provided for Government shall comply with the format, ...Hydronic Pumps15130 3.04 · PDF p. 348Spec wording“All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 15130 3.04 | 348 | – |
| Warranty | WarrantySee Division 1, for additional warranty requirementsPropylene Glycol System15181 1.07.A · PDF p. 378Spec wording“A. See Division 1, for additional warranty requirements.” | 15181 1.07.A | 378 | – |
| Warranty | WarrantyReplace propylene glycol solution lost from the system from any ...Propylene Glycol System15181 1.07.B · PDF p. 378Spec wording“B. Replace propylene glycol solution lost from the system from any cause other than neglect by the Government during the first year of operation.” | 15181 1.07.B | 378 | – |
| Warranty | WarrantyMaintain a log of propylene glycol replacement quantities and datesPropylene Glycol System15181 1.07.C · PDF p. 378Spec wording“C. Maintain a log of propylene glycol replacement quantities and dates.” | 15181 1.07.C | 378 | – |
| Warranty | WarrantyRecharge loop field to proper pressure one year following substantial ...Propylene Glycol System15181 1.07.D · PDF p. 378Spec wording“D. Recharge loop field to proper pressure one year following substantial completion.” | 15181 1.07.D | 378 | – |
| Warranty | WarrantyProvide two 55-gallon drums of premix propylene glycol, dolly for ...Propylene Glycol System15181 1.07.E · PDF p. 378Spec wording“E. Provide two 55-gallon drums of premix propylene glycol, dolly for 55 gallon drum, and 15 gallon transfer pail.” | 15181 1.07.E | 378 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Common Motor Requirements For Hvac Equipment15227 1.07.A · PDF p. 382Spec wording“A. All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15227 1.07.A | 382 | – |
| O&M | O&MIn addition to the general content specified under Section 01700 ...Common Motor Requirements For Hvac Equipment15227 1.07.B · PDF p. 382Spec wording“B. In addition to the general content specified under Section 01700 - Execution and Closeout Requirements supply the following additional documentation: 1. Lubrication instructions, including list/frequency of lubrication 2. Table noting full load power factor, service factor, NEMA design designation, insulation class and frame type for each motor provided” | 15227 1.07.B | 382 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Variable Frequency Drives15260 1.06 · PDF p. 386Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15260 1.06 | 386 | – |
| Training | TrainingProvide the services of a factory trained and certified technician ...Variable Frequency Drives15260 1.07 · PDF p. 386Spec wording“Provide the services of a factory trained and certified technician to approve the installation; start-up, test, and adjust for proper operation of the unit(s). Upon completion of the equipment startup, submit a complete manufacturer's field report, including startup and test log, signed by the factory trained technician. Coordinate with the Temperature Control Contractor and the Balancing Contractor. The startup ...” | 15260 1.07 | 386 | – |
| Warranty | WarrantyThe warranty shall be for a period of twenty-four (24) ...Variable Frequency Drives15260 1.08 · PDF p. 387Spec wording“The warranty shall be for a period of twenty-four (24) months from the date of project Substantial Completion. Further, the warranty shall include all parts, labor, travel time, administrative costs, overhead, travel expenses, technical support and any and all other costs to provide the warranty service.” | 15260 1.08 | 387 | – |
| Training | TrainingAll training provided for Government shall comply with the format, ...Variable Frequency Drives15260 3.04.A · PDF p. 392Spec wording“A. All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 15260 3.04.A | 392 | – |
| Training | TrainingContractor to provide factory authorized representative and/or field personnel knowledgeable ...Variable Frequency Drives15260 3.04.B · PDF p. 392Spec wording“B. Contractor to provide factory authorized representative and/or field personnel knowledgeable with the operations, maintenance and troubleshooting of the system and/or components defined within this section for a minimum period of 4 hours.” | 15260 3.04.B | 392 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Plumbing Equipment15400 1.06 · PDF p. 393Spec wording“All O&M data shall comply with the submission and content requirements specified under Division 01.” | 15400 1.06 | 393 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Commercial Plumbing Fixtures15402 1.06 · PDF p. 396Spec wording“All O&M data shall comply with the submission and content requirements specified under Division 01.” | 15402 1.06 | 396 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Heating Boilers15510 1.07 · PDF p. 400Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15510 1.07 | 400 | – |
| Warranty | Warranty1 year Boiler pressure vessel warranty against leakage due to ...Heating Boilers15510 1.09.A · PDF p. 401Spec wording“A. 1 year Boiler pressure vessel warranty against leakage due to defective workmanship. 1 year period heat exchanger tubes/combustion chamber assembly warranty against failure due to thermal stress or failure of condensate corrosion. All other boiler, burner and control parts warranted for one year from startup.” | 15510 1.09.A | 401 | – |
| Warranty | WarrantySealed combustion boiler, condensing, hi-efficiency, helical heat exchanger/combustion chamber design ...Heating Boilers15510 1.09.B · PDF p. 401Spec wording“B. Sealed combustion boiler, condensing, hi-efficiency, helical heat exchanger/combustion chamber design that will be self-supporting and warranted for a period of 5 years to withstand thermal shock. Heat exchanger shall be warranted against leakage for a period of 5 years.” | 15510 1.09.B | 401 | – |
| Test / cert. | Test / cert.Perform tests and inspections and prepare test reports. Manufacturer's Field ...Heating Boilers15510 3.05.A · PDF p. 403-404Spec wording“A. Perform tests and inspections and prepare test reports. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies and equipment installations, including connections, and to assist in testing.” | 15510 3.05.A | 403-404 | – |
| Training | TrainingAll training provided for Government shall comply with the format, ...Heating Boilers15510 3.08.A · PDF p. 405Spec wording“A. All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 15510 3.08.A | 405 | – |
| Training | TrainingContractor to provide factory authorized representative and/or field personnel knowledgeable ...Heating Boilers15510 3.08.B · PDF p. 405Spec wording“B. Contractor to provide factory authorized representative and/or field personnel knowledgeable with the operations, maintenance and troubleshooting of the system and/or components defined within this section for a minimum period of 4 hours.” | 15510 3.08.B | 405 | – |
| O&M | O&MManufacturer's Literature and DataPackaged Air-Cooled Chiller15620 1.06.B · PDF p. 406-407Spec wording“B. Manufacturer's Literature and Data: Chiller, including motor starters, control panels, and vibration isolators, and remote condenser data shall include the following: 1. Rated capacity. 2. Pressure drop. 3. Efficiency at full load and part load WITHOUT applying any tolerance indicated in the AHRI 550/590/Standard. 4. Refrigerant. 5. Fan performance (Air-Cooled Chillers only.) 6. Accessories. 7. Installation ...” | 15620 1.06.B | 406-407 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Packaged Air-Cooled Chiller15620 1.07 · PDF p. 407Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under section GENERAL REQUIREMENTS.” | 15620 1.07 | 407 | – |
| Warranty | WarrantyProvide a one-year parts and labor warranty on the entire ...Packaged Air-Cooled Chiller15620 1.09.A · PDF p. 407Spec wording“A. Provide a one-year parts and labor warranty on the entire unit beginning upon substantial completion of project.” | 15620 1.09.A | 407 | – |
| Warranty | WarrantyProvide a five-year parts warranty on the compressor(s) beginning upon ...Packaged Air-Cooled Chiller15620 1.09.B · PDF p. 407Spec wording“B. Provide a five-year parts warranty on the compressor(s) beginning upon substantial completion of project.” | 15620 1.09.B | 407 | – |
| Test / cert. | Test / cert.Adjust units for maximum operating efficiency, adjust all controls to ...Packaged Air-Cooled Chiller15620 3.02 · PDF p. 410Spec wording“Adjust units for maximum operating efficiency, adjust all controls to required final settings and demonstrate that all components are functioning properly. Submit four copies of a written startup report following the initial startup. Include in the report: work done to the system, all readings taken, a statement certifying that the refrigeration system(s) are leak free and a statement certifying that the unit(s) ...” | 15620 3.02 | 410 | four copies |
| Training | TrainingAll training provided for agency shall comply with the format, ...Packaged Air-Cooled Chiller15620 3.05.A · PDF p. 411Spec wording“A. All training provided for agency shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 15620 3.05.A | 411 | – |
| Training | TrainingContractor to provide factory authorized representative and/or field personnel knowledgeable ...Packaged Air-Cooled Chiller15620 3.05.B · PDF p. 411Spec wording“B. Contractor to provide factory authorized representative and/or field personnel knowledgeable with the operations, maintenance and troubleshooting of the system and/or components defined within this section for a minimum period of 4 hours.” | 15620 3.05.B | 411 | – |
| Record docs | Record docsProject Record DocumentsSmall Split-System Heating And Cooling15730 1.04.F · PDF p. 413Spec wording“F. Project Record Documents: Record actual locations of components and connections.” | 15730 1.04.F | 413 | – |
| O&M | O&MOperation and Maintenance DataSmall Split-System Heating And Cooling15730 1.04.G · PDF p. 413Spec wording“G. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, installation instructions, maintenance and repair data, and parts listing.” | 15730 1.04.G | 413 | – |
| Warranty | WarrantyWarrantySmall Split-System Heating And Cooling15730 1.04.H · PDF p. 413Spec wording“H. Warranty: Submit manufacturer's warranty and ensure forms have been filled out in Government's name and registered with manufacturer.” | 15730 1.04.H | 413 | – |
| Spare parts | Spare partsMaintenance MaterialsSmall Split-System Heating And Cooling15730 1.04.I · PDF p. 413Spec wording“I. Maintenance Materials: Furnish the following for Government's use in maintenance of project. 1. Refer to Section 01600 - Product Requirements, for additional provisions. 2. Extra Filters: Two for each unit; of each type and size.” | 15730 1.04.I | 413 | – |
| Warranty | WarrantyProvide five year manufacturer's warranty for condensing units; compressors ...Small Split-System Heating And Cooling15730 1.06 · PDF p. 413Spec wording“Provide five year manufacturer's warranty for condensing units; compressors.” | 15730 1.06 | 413 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Heating And Cooling Terminal Units15760 1.07 · PDF p. 417Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15760 1.07 | 417 | – |
| Training | TrainingAll training provided for Government shall comply with the format, ...Heating And Cooling Terminal Units15760 3.08 · PDF p. 421Spec wording“All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 15760 3.08 | 421 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Air Duct Accessories15820 1.07 · PDF p. 430Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15820 1.07 | 430 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Hvac Fans And Seismic Controls15830 1.07 · PDF p. 437Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15830 1.07 | 437 | – |
| Training | TrainingAll training provided for Government shall comply with the format, ...Hvac Fans And Seismic Controls15830 3.04 · PDF p. 439Spec wording“All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under Division 1.” | 15830 3.04 | 439 | – |
| O&M | O&MMaintenance DataDirect Digital Control System For Hvac15911 1.07.C · PDF p. 446Spec wording“C. Maintenance Data: Submit maintenance data and spare parts lists for each control device. Include this data in maintenance manual.” | 15911 1.07.C | 446 | – |
| Record docs | Record docsRecord Drawings:Direct Digital Control System For Hvac15911 1.07.D · PDF p. 446Spec wording“D. Record Drawings: 1. Prior to request for final payment provide complete composite record drawings to incorporate the DDC and Electric field work. All software addressing for device communication shall be noted for all devices provided under this section and the communication addressing required for devices provided by others that are integrated into the direct digital control system provided under this section. ...” | 15911 1.07.D | 446 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Direct Digital Control System For Hvac15911 1.08.A · PDF p. 446Spec wording“A. All operations and maintenance data shall comply with the submission and content requirements specified under Division 01.” | 15911 1.08.A | 446 | – |
| O&M | O&MIn addition to the general content specified under Division 01 ...Direct Digital Control System For Hvac15911 1.08.B · PDF p. 446Spec wording“B. In addition to the general content specified under Division 01 supply the following additional documentation: Engineer and commissioning provider to define detailed operation and maintenance data requirements for equipment specifications added to this section.” | 15911 1.08.B | 446 | – |
| Warranty | WarrantyProvide a 2 year warranty on all materials and workmanshipDirect Digital Control System For Hvac15911 1.10 · PDF p. 446Spec wording“Provide a 2 year warranty on all materials and workmanship.” | 15911 1.10 | 446 | – |
| Training | TrainingAll training provided for the Government shall comply with the ...Direct Digital Control System For Hvac15911 3.03.A · PDF p. 459Spec wording“A. All training provided for the Government shall comply with the format, general content requirements and submission guidelines specified under Division 1.” | 15911 3.03.A | 459 | – |
| Training | TrainingContractor to provide factory authorized representative and/or field personnel knowledgeable ...Direct Digital Control System For Hvac15911 3.03.B · PDF p. 459Spec wording“B. Contractor to provide factory authorized representative and/or field personnel knowledgeable with the operations, maintenance and troubleshooting of the system and/or components defined within this section for a minimum period of 24 hours.” | 15911 3.03.B | 459 | – |
| Training | TrainingProvide two follow-up visits for troubleshooting and instruction, one six ...Direct Digital Control System For Hvac15911 3.03.C · PDF p. 460Spec wording“C. Provide two follow-up visits for troubleshooting and instruction, one six months after substantial completion and the other at the end of the warranty period. Length of each visit to be not less than 16 hours or the time necessary to provide required information and complete troubleshooting and inspection activity for all controls installed under 15920, and 15940. Coordinate the visit with the COR and provide an ...” | 15911 3.03.C | 460 | – |
| Test / cert. | Test / cert.Contractor shall include 16 hours for their technician to be ...Direct Digital Control System For Hvac15911 3.04.A · PDF p. 460Spec wording“A. Contractor shall include 16 hours for their technician to be on-site to demonstrate functionality of the following systems for the Government: 1. Fan Coil Units. 2. Boilers. 3. Chillers. 4. Hot and chilled water distribution systems.” | 15911 3.04.A | 460 | – |
| Test / cert. | Test / cert.Contractor shall include a minimum of 16 hours to assist ...Direct Digital Control System For Hvac15911 3.04.B · PDF p. 460Spec wording“B. Contractor shall include a minimum of 16 hours to assist the section 15950 Contractor with the testing requirements defined in that section.” | 15911 3.04.B | 460 | – |
| Record docs | Record docsInclude the following information:Instrumentation And Control Devices For Hvac15920 1.08.B · PDF p. 462Spec wording“B. Include the following information: 1. Manufacturer's data sheets indicating model number, pressure/temperature ratings, capacity, methods and materials of construction, installation instructions, and recommended maintenance. General catalog sheets showing a series of the same device is not acceptable unless the specific model is clearly marked. 2. Schematic flow diagrams of systems showing fans, pumps, coils, ...” | 15920 1.08.B | 462 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Instrumentation And Control Devices For Hvac15920 1.11 · PDF p. 463Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15920 1.11 | 463 | – |
| Warranty | WarrantyProvide a 1-year warranty on all materials and workmanshipInstrumentation And Control Devices For Hvac15920 1.12 · PDF p. 463Spec wording“Provide a 1-year warranty on all materials and workmanship.” | 15920 1.12 | 463 | – |
| Training | TrainingContractor to provide factory authorized representative and/or field personnel knowledgeable ...Instrumentation And Control Devices For Hvac15920 3.13 · PDF p. 474Spec wording“Contractor to provide factory authorized representative and/or field personnel knowledgeable with the operations, maintenance and troubleshooting of the system and/or components defined within this section for a minimum period of 8 hours.” | 15920 3.13 | 474 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Sequence Of Operation For Hvac Controls15940 1.06.A · PDF p. 476Spec wording“A. All operations and maintenance data shall comply with the submission and content requirements specified under Section 01700 - Execution and Closeout Requirements.” | 15940 1.06.A | 476 | – |
| O&M | O&MIn addition to the general content specified under Section 01700 ...Sequence Of Operation For Hvac Controls15940 1.06.B · PDF p. 476Spec wording“B. In addition to the general content specified under Section 01700 - Execution and Closeout Requirements supply the following additional documentation: All final setpoints and terminal unit air flow correction factors ("K" factors) shall be documented on the as-built control drawings as determined by working in conjunction with the balancing Contractor.” | 15940 1.06.B | 476 | – |
| Test / cert. | Test / cert.Measure and record static air pressure conditions across fans, coils ...Testing, Adjusting And Balancing For Hvac15950 3.03.G · PDF p. 486Spec wording“G. Measure and record static air pressure conditions across fans, coils and filters. Indicate in report if cooling coil measurements were made on a wet or dry coil and if filter measurements were made on a clean or dirty filter. Spot check static air pressure conditions directly ahead of terminal units.” | 15950 3.03.G | 486 | – |
| Test / cert. | Test / cert.Contact the temperature control Contractor for assistance in operation and ...Testing, Adjusting And Balancing For Hvac15950 3.03.N · PDF p. 487Spec wording“N. Contact the temperature control Contractor for assistance in operation and adjustment of controls during testing, adjusting and balancing procedures. Cycle controls and verify proper operation and setpoints. Include in report description of temperature control operation and any deficiencies found.” | 15950 3.03.N | 487 | – |
| Test / cert. | Test / cert.Verify and record, in the T&B Report, "K" factors for ...Testing, Adjusting And Balancing For Hvac15950 3.03.Q · PDF p. 487Spec wording“Q. Verify and record, in the T&B Report, "K" factors for all VAV air terminal devices and air flow stations.” | 15950 3.03.Q | 487 | – |
Division 16 Electrical 30 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Training | TrainingThe Contractor shall check and test the electrical systems to ...Basic Electrical Requirements16050 3.04.A · PDF p. 490Spec wording“A. The Contractor shall check and test the electrical systems to verify proper continuity and proper connections to equipment have been made, that no shorts or improper grounds exist, to ensure a safe, sound, functional, NEC compliant installation.” | 16050 3.04.A | 490 | – |
| Training | TrainingUpon completion of the work, the Contractor shall demonstrate to ...Basic Electrical Requirements16050 3.04.B · PDF p. 490Spec wording“B. Upon completion of the work, the Contractor shall demonstrate to the Fort McCoy Construction Inspector that the systems are properly wired and that all systems and equipment perform and operate as specified.” | 16050 3.04.B | 490 | – |
| Record docs | Record docsAccurately record actual locations of grounding electrodesGrounding And Bonding For Electrical Systems16060 1.06 · PDF p. 491Spec wording“Accurately record actual locations of grounding electrodes.” | 16060 1.06 | 491 | – |
| Test / cert. | Test / cert.Submit factory test reportsLow-Voltage Electrical Power Conductors And Cables16120 1.05.C · PDF p. 503Spec wording“C. Submit factory test reports: Indicate procedures and values obtained.” | 16120 1.05.C | 503 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Wiring Devices16140 1.05 · PDF p. 514Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Division 01.” | 16140 1.05 | 514 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Disconnect Switches16145 1.04 · PDF p. 519Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under Division 01.” | 16145 1.04 | 519 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Panelboards16160 1.04 · PDF p. 520Spec wording“All O&M data shall comply with the submission and content requirements specified under Division 01.” | 16160 1.04 | 520 | – |
| Spare parts | Spare partsKeysPanelboards16160 1.05 · PDF p. 520Spec wording“Keys: Furnish two (2) keys for each panelboard to the COR.” | 16160 1.05 | 520 | – |
| Training | TrainingAll training provided for the Government shall comply with the ...Panelboards16160 3.03 · PDF p. 521Spec wording“All training provided for the Government shall comply with the format, general content requirements and submission guidelines specified under Division 01.” | 16160 3.03 | 521 | – |
| O&M | O&MAll operations and maintenance data shall comply with the submission ...Packaged Generator Assemblies16230 1.06 · PDF p. 522Spec wording“All operations and maintenance data shall comply with the submission and content requirements specified under the front-end documents Closeout Submittals.” | 16230 1.06 | 522 | – |
| Spare parts | Spare partsProvide two additional sets of each fuel, oil, and air ...Packaged Generator Assemblies16230 1.08 · PDF p. 522Spec wording“Provide two additional sets of each fuel, oil, and air filter elements required for the engine generator system and one additional set of all required belts.” | 16230 1.08 | 522 | two additional sets; one additional set |
| Training | TrainingAll training provided for Government shall comply with the format, ...Packaged Generator Assemblies16230 3.04 · PDF p. 527Spec wording“All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under the front-end documents.” | 16230 3.04 | 527 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Transfer Switches16280 1.05.A · PDF p. 528Spec wording“A. All O&M data shall comply with the submission and content requirements specified under the front-end documents Closeout Submittals.” | 16280 1.05.A | 528 | – |
| O&M | O&MIn addition to the general content specified under the front-end ...Transfer Switches16280 1.05.B · PDF p. 528Spec wording“B. In addition to the general content specified under the front-end documents Closeout Submittals, supply the following additional documentation: Instructions for operating equipment under test and emergency conditions.” | 16280 1.05.B | 528 | – |
| Training | TrainingAll training provided for Government shall comply with the format, ...Transfer Switches16280 3.03 · PDF p. 530Spec wording“All training provided for Government shall comply with the format, general content requirements and submission guidelines specified under the front-end specifications.” | 16280 3.03 | 530 | – |
| Warranty | WarrantyThe manufacturer shall provide a 5-year warranty from the date ...Surge Protective Devices For Low-Voltage Electrical Power Circuits16416 1.05 · PDF p. 531Spec wording“The manufacturer shall provide a 5-year warranty from the date of shipment of the SPD.” | 16416 1.05 | 531 | – |
| O&M | O&MAll O&M data shall comply with the submission and content ...Surge Protective Devices For Low-Voltage Electrical Power Circuits16416 1.07 · PDF p. 531Spec wording“All O&M data shall comply with the submission and content requirements specified under Division 01.” | 16416 1.07 | 531 | – |
| Training | TrainingAll training provided for the Government shall comply with the ...Surge Protective Devices For Low-Voltage Electrical Power Circuits16416 3.02 · PDF p. 533Spec wording“All training provided for the Government shall comply with the format, general content requirements and submission guidelines specified under Division 01” | 16416 3.02 | 533 | – |
| Warranty | WarrantySystem Documentation:Interior And Exterior Luminaires General16510 1.03.B · PDF p. 534Spec wording“B. System Documentation: 1. Warranty. 2. Provide minimum of a five-year warranty for emergency power battery.” | 16510 1.03.B | 534 | – |
| Record docs | Record docsSubmit and record documents under provisions of 16050Communications Cable And Equipment16700 1.07.A · PDF p. 541Spec wording“A. Submit and record documents under provisions of 16050.” | 16700 1.07.A | 541 | – |
| Record docs | Record docsAccurately record exact sizes, locations and quantities of cablesCommunications Cable And Equipment16700 1.07.B · PDF p. 541Spec wording“B. Accurately record exact sizes, locations and quantities of cables.” | 16700 1.07.B | 541 | – |
| Record docs | Record docsDrawings included with the specifications set shall be modified by ...Communications Cable And Equipment16700 3.07.A · PDF p. 565Spec wording“A. Drawings included with the specifications set shall be modified by the Contractor to denote as-built information.” | 16700 3.07.A | 565 | – |
| Record docs | Record docsThe drawings are to include cable routes and outlet locations. ...Communications Cable And Equipment16700 3.07.B · PDF p. 566Spec wording“B. The drawings are to include cable routes and outlet locations. Outlet locations shall be identified by their sequential number as defined elsewhere in this document. Numbering, icons and drawing conventions used shall be consistent throughout all documentation provided.” | 16700 3.07.B | 566 | – |
| Record docs | Record docsThe COR through the Consultant will provide floor plans in ...Communications Cable And Equipment16700 3.07.C · PDF p. 566Spec wording“C. The COR through the Consultant will provide floor plans in paper and electronic (".dwg", AutoCAD) formats on which as-built construction information can be added. These documents will be modified accordingly by the Contractor to denote as-built information as defined above and returned to the Consultant for acceptance. This information shall be supplied to the COR no later than four (4) weeks prior to the ...” | 16700 3.07.C | 566 | AutoCAD |
| Record docs | Record docsThe Contractors shall annotate the base drawings and return to ...Communications Cable And Equipment16700 3.07.D · PDF p. 566Spec wording“D. The Contractors shall annotate the base drawings and return to the COR in hard copy (same plot size as originals) and AutoCAD form.” | 16700 3.07.D | 566 | hard copy; AutoCAD |
| Record docs | Record docsEach drawing submitted by the Contractor as part of the ...Communications Cable And Equipment16700 3.07.E · PDF p. 566Spec wording“E. Each drawing submitted by the Contractor as part of the Project Documentation shall be identified as an "As-built" drawing and include the following (1) The Contractor name and/or logo (2) The date of the drawing.” | 16700 3.07.E | 566 | – |
| Record docs | Record docsAll fonts, color, layer, Model Space/Paper Space conventions established in ...Communications Cable And Equipment16700 3.07.F · PDF p. 566Spec wording“F. All fonts, color, layer, Model Space/Paper Space conventions established in the base drawings shall be retained by the Contractor in preparation of the As-built drawings.” | 16700 3.07.F | 566 | – |
| Record docs | Record docsPrior to generation of the drawings, the Contractor shall provide ...Communications Cable And Equipment16700 3.07.G · PDF p. 566Spec wording“G. Prior to generation of the drawings, the Contractor shall provide a sample file and test plot to the COR for review and approval.” | 16700 3.07.G | 566 | – |
| Record docs | Record docsAll documentation, including hard copy and electronic forms shall become ...Communications Cable And Equipment16700 3.07.H · PDF p. 566Spec wording“H. All documentation, including hard copy and electronic forms shall become the property of the Government.” | 16700 3.07.H | 566 | hard copy |
| Warranty | WarrantyContractor shall guarantee all materials, equipment, etc., two (2) years ...Communications Cable And Equipment16700 3.08 · PDF p. 566Spec wording“Contractor shall guarantee all materials, equipment, etc., two (2) years from date of substantial completion of this work. In the case of data cabling the Contractor shall furnish complete Category 6 system warranty consisting of no less than fifteen (15) years. This guarantee shall include all labor, material and travel time. In the case of fiber optic cabling the Contractor shall furnish a complete system ...” | 16700 3.08 | 566 | – |
Division 31 Earthwork 1 item
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.If, in the opinion of the COR, based on reports ...Backfill/Fill Material31 23 23 1.03.F · PDF p. 582Spec wording“F. If, in the opinion of the COR, based on reports of the testing agency and inspection, subgrade or fills which have been placed are below specified density, provide additional compaction and testing at no additional cost to the Government.” | 31 23 23 1.03.F | 582 | – |
Division 32 Paving and site improvements 1 item
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Contractor shall have on site, a qualified, independent testing firm ...Base Course32 11 00 1.03.A · PDF p. 587Spec wording“A. Contractor shall have on site, a qualified, independent testing firm to test materials for compliance with standards set forth in this specification. Submit report to COR for all materials as required.” | 32 11 00 1.03.A | 587 | – |
Don't want to chase all of this yourself?
Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.
Email [email protected]Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.