Free closeout checklist · State job · Missouri

Closeout checklist: Upgrade Lighting to LED, Joint Forces Reserve Center (Missouri FMDC, MO)

Every closeout item we found in the public spec book for this job: 23 items across Division 01, 1 trade division and the contract conditions, including 7 warranties, 4 O&M manual items and 3 tests and certificates. Each one is tied to its spec section and the PDF page it sits on.

Owner
State of Missouri, Office of Administration, Division of Facilities Management, Design and Construction (FMDC)
Number
FMDC project T2143-01
Location
St. Louis, MO
Bid date
2025-07-08
Public spec book
Spec book PDF on the Missouri FMDC bid listing
FMDC bid listing
Spec book size
133 PDF pages
Checklist built
2026-10-21

Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.

What this job asks for at closeout

7Warranties
4O&M manuals
3Tests and certificates
2Training
0Record documents
0Spare parts
6Payment release
1Closeout steps

All 23 items, by trade

Division 01 General requirements 7 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MThe Contractor shall submit to the Designer, within ten (10) ...Schedule – Bar Chart01 32 00 3.1.A · PDF p. 76
Spec wording
“A. The Contractor shall submit to the Designer, within ten (10) working days following the Notice to Proceed, a Progress Schedule including Schedule of Values showing the rate of progress the Contractor agrees to maintain and the order in which he proposed to carry out the various phases of Work. No payments shall be made to the Contractor until the Progress Schedule has been approved by the Owner. 1. The Schedule ...”
01 32 00 3.1.A76–
WarrantyWarrantyThe Contractor shall submit all required manufacturer's operating instructions, maintenance/service ...Submittals01 33 00 1.7.A · PDF p. 82
Spec wording
“A. The Contractor shall submit all required manufacturer's operating instructions, maintenance/service manuals, and warranties in accordance with the General Conditions, Article 3.5, and Supplementary Conditions along with this and other Sections of the Contract Documents.”
01 33 00 1.7.A82–
Test / cert.Test / cert.Contractor shall submit the following information for materials and equipment ...Submittals01 33 00 2.1.A · PDF p. 82
Spec wording
“A. Contractor shall submit the following information for materials and equipment to be provided under this contract. SPEC TITLE CATEGORY SECTION 013100 Key Personnel Names Coordination 013200 Construction Progress Schedule Construction Schedule 013200 Schedule of Submittals Shop Drawings 013200 Schedule of Values Schedules 013200 Progress Reports Construction Schedule 013200 Payment Requests Construction Schedule ...”
01 33 00 2.1.A82–
WarrantyWarrantyTraining ModulesDemonstration And Training01 79 00 2.1.A · PDF p. 96-97
Spec wording
“A. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following as applicable to the system, equipment, or component: 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: a. System and equipment ...”
01 79 00 2.1.A96-97–
Closeout stepCloseout stepAssemble educational materials necessary for instructionDemonstration And Training01 79 00 3.1.A · PDF p. 97
Spec wording
“A. Assemble educational materials necessary for instruction.”
01 79 00 3.1.A97–
TrainingTrainingInstruct Owner's personnel to adjust, operate, and maintain systems, subsystems, ...Demonstration And Training01 79 00 3.2.A · PDF p. 97
Spec wording
“A. Instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.”
01 79 00 3.2.A97–
TrainingTrainingSchedulingDemonstration And Training01 79 00 3.2.B · PDF p. 97
Spec wording
“B. Scheduling: Provide instruction at mutually agreed on times. 1. Schedule training with Owner with at least seven days' advance notice.”
01 79 00 3.2.B97–

Division 26 Electrical 4 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyWarrantyExterior Lighting26 56 00 1.4.A · PDF p. 130
Spec wording
“A. Warranty: Sample warranty.”
26 56 00 1.4.A130–
WarrantyWarrantyWarrantyExterior Lighting26 56 00 1.6.A · PDF p. 130
Spec wording
“A. Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace devices that fail in materials or workmanship within specified warranty period.”
26 56 00 1.6.A130–
WarrantyWarrantyWarrantyExterior Lighting26 56 00 1.8.A · PDF p. 131
Spec wording
“A. Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace devices that fail in materials or workmanship; that corrode, fade, stain, perforate, erode or chalk due to effects of weather or solar radiation within specified warranty period. Manufacturer may exclude lightning or hail damage, vandalism, or unauthorized repairs or alterations from special warranty coverage. 1. Warranty ...”
26 56 00 1.8.A131–
Test / cert.Test / cert.Prepare a written report of inspections, observations, and verifications indicating ...Exterior Lighting26 56 00 3.2.C · PDF p. 133
Spec wording
“C. Prepare a written report of inspections, observations, and verifications indicating and interpreting results. Replace any malfunctioning or damaged lighting units. END OF 26 56 00”
26 56 00 3.2.C133–

Front end Contract conditions (final payment, releases, retainage) 12 items

TypeItemSpec sectionPDF pageCopies / format
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 22
Spec wording
“DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION FINAL RECEIPT OF PAYMENT AND RELEASE KNOW ALL MEN BY THESE PRESENT THAT: hereinafter called "Subcontractor" who heretofore entered into an agreement with hereinafter called "Contractor", for the performance of work and/or furnishing of material for the construction of the project entitled (PROJECT TITLE, PROJECT LOCATION, AND PROJECT NUMBER) at (ADDRESS OF ...”
Conditions Of The Contract (Find Heading On The Cited Page)22–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 33
Spec wording
“The Contractor shall update a complete set of the construction drawings, shop drawings and schedules of all work monthly by marking changes, and at the completion of their work (prior to submission of request for final payment) note all changes and turn the set over to the Construction Representative.”
Conditions Of The Contract (Find Heading On The Cited Page)33–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 34
Spec wording
“Prior to the final payment, furnish to the Designer three (4) copies of parts catalogs for each piece of equipment furnished by him/her on the project with the components identified by number for replacement ordering.”
Conditions Of The Contract (Find Heading On The Cited Page)34three (4) copies
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 40
Spec wording
“The Contractor shall be allowed to include in the Application and Certification for Payment, one hundred (100%) of the value, subject to retainage, of major equipment and material stored off the site if all of the following conditions are met: 1.”
Conditions Of The Contract (Find Heading On The Cited Page)40–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 41
Spec wording
“The final payment shall not become due until the Contractor delivers to the Construction Representative: a) A complete file of releases, on the standard form included in the contract documents as "Final Receipt of Payment and Release Form", from subcontractors and material suppliers evidencing payment in full for services, equipment and materials, as the case may require, if the Owner approves, or a consent from ...”
Conditions Of The Contract (Find Heading On The Cited Page)41–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 53
Spec wording
“The Contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed.”
Conditions Of The Contract (Find Heading On The Cited Page)53–
WarrantyWarrantyA. General Guaranty 1. Neither the final certificate of payment ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 33
Spec wording
“A. General Guaranty 1. Neither the final certificate of payment nor any provision in the contract documents nor partial use or occupancy of the premises by the Owner shall constitute an acceptance of work not done in accordance with contract requirements. 2. The Contractor or surety shall remedy any defects in the work and pay for any damage to property resulting there from which shall appear within a period of one ...”
Conditions Of The Contract ARTICLE.A33–
WarrantyWarrantyB. Extended Warranty Manufacturer's certificates of warranty shall be obtained ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 33
Spec wording
“B. Extended Warranty Manufacturer's certificates of warranty shall be obtained for all major equipment. Warranty shall be obtained for at least one year. Where a longer period is offered at no additional cost or called for in the specific equipment specifications, the longer period shall govern.”
Conditions Of The Contract ARTICLE.B33–
O&MO&MA. Immediately after equipment submittals are approved and no later ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 33-34
Spec wording
“A. Immediately after equipment submittals are approved and no later than ten (10) working days prior to the substantial completion inspection, the Contractor shall provide to the Designer three (3) copies of operating instructions and service manuals, containing the following: 1. Start-up and Shut-down Procedures: Provide a step-by-step write up of all major equipment. When manufacturer's printed start-up, trouble ...”
Conditions Of The Contract ARTICLE.A33-34three (3) copies; three (4) copies
O&MO&MB. Submission of operating instructions shall be done in the ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 34
Spec wording
“B. Submission of operating instructions shall be done in the following manner. 1. Manuals shall be in quadruplicate, and all materials shall be bound into volumes of standard 8½" x 11" hard binders. Large drawings too bulky to be folded into 8½" x 11" shall be separately bound or folded and in envelopes, cross referenced and indexed with the manuals. 2. The manuals shall identify project name, project number, and ...”
Conditions Of The Contract ARTICLE.B34binders; binder
O&MO&MA. Substantial Completion. A Project is substantially complete when construction ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 38-39
Spec wording
“A. Substantial Completion. A Project is substantially complete when construction is essentially complete and work items remaining to be completed can be done without interfering with the Owner's ability to use the Project for its intended purpose. 1. Once the Contractor has reached what they believe is Substantial Completion, the Contractor shall notify the Designer and the Construction Representative of the ...”
Conditions Of The Contract ARTICLE.A38-39–
Test / cert.Test / cert.C. Final Completion. The Project is finally complete when the ...Conditions Of The ContractConditions Of The Contract ARTICLE.C · PDF p. 39
Spec wording
“C. Final Completion. The Project is finally complete when the Certificate of Substantial Completion has been issued and all work items identified therein as incomplete have been completed, and when all administrative items required by the contract have been completed. Final Completion entitles the Contractor to payment of the outstanding balance of the contract amount including all change orders and retainage. ...”
Conditions Of The Contract ARTICLE.C39–

Don't want to chase all of this yourself?

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.