Free closeout checklist · State job · Missouri

Closeout checklist: Latrines and Shower Renovations, Building 233, St. Louis Lambert Readiness Center (Missouri FMDC, MO)

Every closeout item we found in the public spec book for this job: 155 items across Division 01, 10 trade divisions and the contract conditions, including 41 O&M manual items, 34 warranties and 33 tests and certificates. Each one is tied to its spec section and the PDF page it sits on.

Owner
State of Missouri, Office of Administration, Division of Facilities Management, Design and Construction (FMDC)
Number
FMDC project T2417-01
Location
Bridgeton, MO
Bid date
2025-09-04
Public spec book
Spec book PDF on the Missouri FMDC bid listing
FMDC bid listing
Spec book size
510 PDF pages
Checklist built
2026-10-21

Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.

What this job asks for at closeout

34Warranties
41O&M manuals
33Tests and certificates
22Training
11Record documents
5Spare parts
6Payment release
3Closeout steps

All 155 items, by trade

Division 01 General requirements 30 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MThe Contractor shall submit to the Designer, within ten (10) ...Schedule – Bar Chart01 32 00 3.1.A · PDF p. 80
Spec wording
“A. The Contractor shall submit to the Designer, within ten (10) working days following the Notice to Proceed, a Progress Schedule including Schedule of Values showing the rate of progress the Contractor agrees to maintain and the order in which he proposed to carry out the various phases of Work. No payments shall be made to the Contractor until the Progress Schedule has been approved by the Owner. 1. The Schedule ...”
01 32 00 3.1.A80–
WarrantyWarrantyThe Contractor shall submit all required manufacturer's operating instructions, maintenance/service ...Submittals01 33 00 1.8.A · PDF p. 88
Spec wording
“A. The Contractor shall submit all required manufacturer's operating instructions, maintenance/service manuals, and warranties in accordance with the General Conditions, Article 3.5, and Supplementary Conditions along with this and other Sections of the Contract Documents.”
01 33 00 1.8.A88–
WarrantyWarrantyContractor shall submit the following information for materials and equipment ...Submittals01 33 00 3.1.A · PDF p. 88-89
Spec wording
“A. Contractor shall submit the following information for materials and equipment to be provided under this contract. SPEC TITLE CATEGORY SECTION 042200 Concrete Masonry Units Product Data, Shop Drawings 061053 Rough Carpentry Product Data 066400 Plastic Paneling Product Data, Certification 081113 Hollow Metal Doors & Frames Product Data, Shop Drawings, Certifica-tion 087100 Door Hardware Product Data, Shop ...”
01 33 00 3.1.A88-89–
WarrantyWarrantyList of required submittals:Site Security And Health Requirements01 35 13.28 1.2.A · PDF p. 90
Spec wording
“A. List of required submittals: 1. Materials Safety Data Sheets for all hazardous materials to be brought onsite. 2. Schedule of proposed shutdowns, if applicable. 3. Required fingerprinting for criminal background and warrants check. A list of the names of all employees who will submit fingerprints for a background check and the signed privacy documents identified below for each employee.”
01 35 13.28 1.2.A90–
WarrantyWarrantyCHECKSite Security And Health Requirements01 35 13.28 3.4 · PDF p. 91
Spec wording
“CHECK”
01 35 13.28 3.491–
WarrantyWarrantyAll employees of the Contractor are required to submit fingerprints ...Site Security And Health Requirements01 35 13.28 3.4.A · PDF p. 91
Spec wording
“A. All employees of the Contractor are required to submit fingerprints to the Missouri State Highway Patrol to enable the Office of Administration, Division of Facilities Management, Design and Construction (FMDC) to receive state and national criminal background checks on such employees. FMDC will also check with law enforcement to determine if any of the Contractor's employees has an outstanding warrant for his ...”
01 35 13.28 3.4.A91–
WarrantyWarrantyThe Contractor shall ensure all of its employees submit fingerprints ...Site Security And Health Requirements01 35 13.28 3.4.B · PDF p. 91-92
Spec wording
“B. The Contractor shall ensure all of its employees submit fingerprints to the Missouri State Highway Patrol and pay for the cost of such background checks. The Contractor shall submit to FMDC a list of the names of the Contractor's employees who will be fingerprinted and a signed Missouri Applicant Fingerprint Privacy Notice, Applicant Privacy Rights and Privacy Act Statement for each employee. All employees of ...”
01 35 13.28 3.4.B91-92–
WarrantyWarrantyPursuant to section 43.540, RSMo, FMDC participates in the Missouri ...Site Security And Health Requirements01 35 13.28 3.4.C · PDF p. 92
Spec wording
“C. Pursuant to section 43.540, RSMo, FMDC participates in the Missouri Rap Back and National Rap Back programs as of August 28, 2018. This means that the Missouri State Highway Patrol, Central Records Repository, and the Federal Bureau of Investigation will retain the fingerprints submitted by each of the Contractor's employees, and those fingerprints will be searched against other fingerprints on file, including ...”
01 35 13.28 3.4.C92–
WarrantyWarrantyAs part of the Missouri and National Rap Back programs, ...Site Security And Health Requirements01 35 13.28 3.4.D · PDF p. 92
Spec wording
“D. As part of the Missouri and National Rap Back programs, FMDC will receive notification if a new arrest is reported for an employee whose fingerprints have been submitted for FMDC after August 28, 2018. If the employee is performing work on a State contract at the time of the arrest notification, FMDC will request and receive the employee's updated criminal history records. If the employee is no longer performing ...”
01 35 13.28 3.4.D92–
WarrantyWarrantyPursuant to section 43.540, RSMo, the Missouri State Highway Patrol ...Site Security And Health Requirements01 35 13.28 3.4.E · PDF p. 92
Spec wording
“E. Pursuant to section 43.540, RSMo, the Missouri State Highway Patrol will provide the results of the employee's background check directly to FMDC. FMDC may NOT release the results of a background check to the Contractor or provide the Contractor any information obtained from a background check, either verbally or in writing. FMDC will notify the Contractor only whether an employee is approved to work on State ...”
01 35 13.28 3.4.E92–
WarrantyWarrantyEach employee who submits fingerprints to the Missouri State Highway ...Site Security And Health Requirements01 35 13.28 3.4.F · PDF p. 92
Spec wording
“F. Each employee who submits fingerprints to the Missouri State Highway Patrol has a right to obtain a copy of the results of his or her background check. The employee may challenge the accuracy and completeness of the information contained in a background check report and obtain a determination from the Missouri State Highway Patrol and/or the FBI regarding the validity of such challenge prior to FMDC making a ...”
01 35 13.28 3.4.F92–
WarrantyWarrantyThe Contractor shall notify FMDC if an employee is terminated ...Site Security And Health Requirements01 35 13.28 3.4.G · PDF p. 92
Spec wording
“G. The Contractor shall notify FMDC if an employee is terminated or resigns from employment with the Contractor. If the Contractor does not anticipate performing work on a State contract in the future, the Contractor may request that FMDC remove its employees from the Rap Back programs. However, if removed from the Rap Back programs, employees will be required to submit new fingerprints should the contractor be ...”
01 35 13.28 3.4.G92–
WarrantyWarrantyUpon award of a Contract, the Contractor should contact FMDC ...Site Security And Health Requirements01 35 13.28 3.4.H · PDF p. 92
Spec wording
“H. Upon award of a Contract, the Contractor should contact FMDC to determine if its employees need to provide a new background check. If a Contractor's employee has previously submitted a fingerprint background check to FMDC as part of the Missouri and National Rap Back programs, the employee may not need to submit another fingerprint search for a period of three to six years, depending upon the circumstances. The ...”
01 35 13.28 3.4.H92–
TrainingTrainingInstruction ProgramDemonstration And Training01 79 00 1.3.A · PDF p. 104
Spec wording
“A. Instruction Program: Submit outline of instructional program for demonstration and training, including a list of training modules and a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module.”
01 79 00 1.3.A104–
TrainingTrainingAttendance RecordDemonstration And Training01 79 00 1.3.B · PDF p. 104
Spec wording
“B. Attendance Record: For each training module, submit list of participants and length of instruction time.”
01 79 00 1.3.B104–
TrainingTrainingEvaluationsDemonstration And Training01 79 00 1.3.C · PDF p. 104
Spec wording
“C. Evaluations: For each participant and for each training module, submit results and documentation of performance-based test.”
01 79 00 1.3.C104–
TrainingTrainingDemonstration and Training Video RecordingsDemonstration And Training01 79 00 1.4.A · PDF p. 104
Spec wording
“A. Demonstration and Training Video Recordings: Submit two copies within seven days of end of each training module. 1. Identification: On each copy, provide an applied label with the following information: a. Name of Project. b. Name and address of videographer. c. Name of Architect. d. Name of Construction Manager. e. Name of Contractor. f. Date of video recording. 2. Transcript: Prepared in PDF electronic format. ...”
01 79 00 1.4.A104two copies; PDF; electronic format; electronic file
TrainingTrainingFacilitator QualificationsDemonstration And Training01 79 00 1.5.A · PDF p. 105
Spec wording
“A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance.”
01 79 00 1.5.A105–
TrainingTrainingPreinstruction ConferenceDemonstration And Training01 79 00 1.5.C · PDF p. 105
Spec wording
“C. Preinstruction Conference: Conduct conference at Project site to comply with requirements in Section 013100 "Coordination". Review methods and procedures related to demonstration and training including, but not limited to, the following: 1. Inspect and discuss locations and other facilities required for instruction. 2. Review and finalize instruction schedule and verify availability of educational materials, ...”
01 79 00 1.5.C105–
O&MO&MCoordinate content of training modules with content of approved emergency, ...Demonstration And Training01 79 00 1.6.C · PDF p. 105
Spec wording
“C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Architect.”
01 79 00 1.6.C105–
WarrantyWarrantyTraining ModulesDemonstration And Training01 79 00 2.1.B · PDF p. 105-107
Spec wording
“B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following as applicable to the system, equipment, or component: 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: a. System, subsystem, and equipment ...”
01 79 00 2.1.B105-107–
TrainingTrainingAssemble educational materials necessary for instruction, including documentation and training ...Demonstration And Training01 79 00 3.1.A · PDF p. 107
Spec wording
“A. Assemble educational materials necessary for instruction, including documentation and training module.”
01 79 00 3.1.A107–
TrainingTrainingEngage qualified instructors to instruct Owner's personnel to adjust, operate, ...Demonstration And Training01 79 00 3.2.A · PDF p. 107
Spec wording
“A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. 1. Architect will furnish an instructor to describe basis of system design, operational requirements, criteria, and regulatory requirements. 2. Owner will furnish an instructor to describe Owner's operational philosophy. 3. Owner will furnish Contractor with names ...”
01 79 00 3.2.A107–
TrainingTrainingSchedulingDemonstration And Training01 79 00 3.2.B · PDF p. 107
Spec wording
“B. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season. 1. Schedule training with Owner with at least seven days' advance notice.”
01 79 00 3.2.B107–
TrainingTrainingGeneralDemonstration And Training01 79 00 3.3.A · PDF p. 108
Spec wording
“A. General: Engage a qualified commercial videographer to record demonstration and training video recordings. Record each training module separately. Include classroom instructions and demonstrations, board diagrams, and other visual aids, but not student practice. 1. At beginning of each training module, record each chart containing learning objective and lesson outline.”
01 79 00 3.3.A108–
TrainingTrainingVideoDemonstration And Training01 79 00 3.3.B · PDF p. 108
Spec wording
“B. Video: Provide minimum 640 x 480 video resolution converted to format file type acceptable to Owner, on electronic media. 1. Electronic Media: Read-only format compact disc acceptable to Owner, with commercial-grade graphic label. 2. File Hierarchy: Organize folder structure and file locations according to project manual table of contents. Provide complete screen-based menu. 3. File Names: Utilize file names ...”
01 79 00 3.3.B108electronic media; DVD
TrainingTrainingLight LevelsDemonstration And Training01 79 00 3.3.D · PDF p. 108
Spec wording
“D. Light Levels: Verify light levels are adequate to properly light equipment. Verify equipment markings are clearly visible prior to recording. 1. Furnish additional portable lighting as required.”
01 79 00 3.3.D108–
TrainingTrainingNarrationDemonstration And Training01 79 00 3.3.E · PDF p. 109
Spec wording
“E. Narration: Describe scenes on video recording by audio narration by microphone while video recording is recorded. Include description of items being viewed.”
01 79 00 3.3.E109–
TrainingTrainingTranscriptDemonstration And Training01 79 00 3.3.F · PDF p. 109
Spec wording
“F. Transcript: Provide a transcript of the narration. Display images and running time captured from videotape opposite the corresponding narration segment.”
01 79 00 3.3.F109–
TrainingTrainingPreproduced Video RecordingsDemonstration And Training01 79 00 3.3.G · PDF p. 109
Spec wording
“G. Preproduced Video Recordings: Provide video recordings used as a component of training modules in same format as recordings of live training.”
01 79 00 3.3.G109–

Division 02 Existing conditions 4 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyWarrantiesSelective Demolition02 41 19 1.5.G · PDF p. 139
Spec wording
“G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.”
02 41 19 1.5.G139–
Closeout stepCloseout stepInventorySelective Demolition02 41 19 1.6.A · PDF p. 139
Spec wording
“A. Inventory: Submit a list of items that have been removed and salvaged.”
02 41 19 1.6.A139–
WarrantyWarrantyExisting WarrantiesSelective Demolition02 41 19 1.9.A · PDF p. 140
Spec wording
“A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding.”
02 41 19 1.9.A140–
WarrantyWarrantyNotify warrantor on completion of selective demolition, and obtain documentation ...Selective Demolition02 41 19 1.9.B · PDF p. 140
Spec wording
“B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.”
02 41 19 1.9.B140–

Division 04 Masonry 2 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Material CertificatesConcrete Masonry Units04 22 00 1.5.A · PDF p. 147
Spec wording
“A. Material Certificates: For each type and size of the following: 1. Masonry units. a. Include material test reports substantiating compliance with requirements. b. For masonry units used in structural masonry, include data and calculations establishing average net-area compressive strength of units. 2. Cementitious materials. Include name of manufacturer, brand name, and type. 3. Mortar admixtures. 4. Preblended, ...”
04 22 00 1.5.A147–
Test / cert.Test / cert.Mix DesignsConcrete Masonry Units04 22 00 1.5.B · PDF p. 147-148
Spec wording
“B. Mix Designs: For each type of mortar and grout. Include description of type and proportions of ingredients. 1. Include test reports for mortar mixes required to comply with property specification. Test in accordance with ASTM C109/C109M for compressive strength, ASTM C1506 for water retention, and ASTM C91/C91M for air content. 2. Include test reports, in accordance with ASTM C1019, for grout mixes required to ...”
04 22 00 1.5.B147-148–

Division 06 Wood and plastics 2 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MMaintenance DataPlastic Paneling06 64 00 1.3.D · PDF p. 161
Spec wording
“D. Maintenance Data: Panel maintenance and cleaning recommendations.”
06 64 00 1.3.D161–
WarrantyWarrantyManufacturer WarrantyPlastic Paneling06 64 00 1.7.A · PDF p. 161
Spec wording
“A. Manufacturer Warranty: Provide 10-year manufacturer warranty for products free from manufacturing defects. Complete forms in Owner's name and register with manufacturer.”
06 64 00 1.7.A161–

Division 08 Doors, windows and hardware 8 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Product Test ReportsDoor Hardware Schedule08 06 71 1.3.D · PDF p. 164
Spec wording
“D. Product Test Reports: Indicating compliance with cycle testing requirements, based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified independent testing agency.”
08 06 71 1.3.D164–
O&MO&MOperating and Maintenance ManualsDoor Hardware Schedule08 06 71 1.3.E · PDF p. 164
Spec wording
“E. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance manuals for each item comprising the complete door hardware installation in quantity as required in Division 01, Closeout Submittals. The manual to include the name, address, and contact information of the manufacturers providing the hardware and their nearest service representatives. The final copies delivered after completion of ...”
08 06 71 1.3.E164–
WarrantyWarrantyWarranties and MaintenanceDoor Hardware Schedule08 06 71 1.3.F · PDF p. 164
Spec wording
“F. Warranties and Maintenance: Special warranties and maintenance agreements specified in the Related Sections.”
08 06 71 1.3.F164–
WarrantyWarrantyGeneral WarrantyDoor Hardware Schedule08 06 71 1.5.A · PDF p. 165
Spec wording
“A. General Warranty: Reference Division 01, General Requirements. Special warranties specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents.”
08 06 71 1.5.A165–
Closeout stepCloseout stepMaintenance Tools and InstructionsDoor Hardware Schedule08 06 71 1.6.A · PDF p. 165
Spec wording
“A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.”
08 06 71 1.6.A165–
O&MO&MMaintenance DataDoor Hardware08 71 00 1.5.D · PDF p. 175
Spec wording
“D. Maintenance Data: Include data on operating hardware, lubrication requirements, and inspection procedures related to preventative maintenance. 1. Submit manufacturer's parts lists and templates.”
08 71 00 1.5.D175–
WarrantyWarrantyWarrantyDoor Hardware08 71 00 1.5.E · PDF p. 175
Spec wording
“E. Warranty: Submit manufacturer's warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.”
08 71 00 1.5.E175–
WarrantyWarrantyWarranty against defects in material and workmanship for period indicated, ...Door Hardware08 71 00 1.8.A · PDF p. 175
Spec wording
“A. Warranty against defects in material and workmanship for period indicated, from Date of Substantial Completion. 1. Closers: Five years, minimum. 2. Exit Devices: Three years, minimum. 3. Locksets and Cylinders: Three years, minimum. 4. Other Hardware: Two years, minimum.”
08 71 00 1.8.A175–

Division 09 Finishes 9 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Testing Agency's Report:Flooring Preparation09 05 61 1.4.D · PDF p. 184
Spec wording
“D. Testing Agency's Report: 1. Description of areas tested; include floor plans and photographs if helpful. 2. Summary of conditions encountered. 3. Moisture and alkalinity (pH) test reports. 4. Copies of specified test methods. 5. Recommendations for remediation of unsatisfactory surfaces. 6. Submit report to Architect. 7. Submit report not more than two business days after conclusion of testing.”
09 05 61 1.4.D184–
WarrantyWarrantyAdhesive Bond and Compatibility Test ReportFlooring Preparation09 05 61 1.4.E · PDF p. 184
Spec wording
“E. Adhesive Bond and Compatibility Test Report.”
09 05 61 1.4.E184–
Test / cert.Test / cert.ReportFlooring Preparation09 05 61 3.3.F · PDF p. 186
Spec wording
“F. Report: Report the information required by the test method.”
09 05 61 3.3.F186–
Test / cert.Test / cert.ReportFlooring Preparation09 05 61 3.4.F · PDF p. 186
Spec wording
“F. Report: Report the information required by the test method.”
09 05 61 3.4.F186–
Spare partsSpare partsMaintenance MaterialsAcoustical Ceilings09 51 00 1.5.E · PDF p. 197
Spec wording
“E. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. 1. Extra Acoustical Units: Quantity equal to 5 percent of total installed.”
09 51 00 1.5.E197–
O&MO&MMaintenance DataFluid Applied Flooring09 67 00 1.4.F · PDF p. 204
Spec wording
“F. Maintenance Data: Include maintenance procedures, recommended maintenance materials, procedures for stain removal, repairing surface, and suggested schedule for cleaning.”
09 67 00 1.4.F204–
Spare partsSpare partsMaintenance MaterialsFluid Applied Flooring09 67 00 1.4.G · PDF p. 204-205
Spec wording
“G. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. 1. Extra Top Coat Materials: 2 gallons (8 liters).”
09 67 00 1.4.G204-205–
Spare partsSpare partsMaintenance MaterialsInterior Painting09 91 23 1.4.E · PDF p. 209
Spec wording
“E. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. 1. Extra Paint and Finish Materials: 2 gallons (8 L) of each color; from the same product run, store where directed. 2. Label each container with color in addition to the manufacturer's label.”
09 91 23 1.4.E209–
Spare partsSpare partsMaintenance MaterialsHigh-Performance Wall Coatings09 96 00 1.4.E · PDF p. 214-215
Spec wording
“E. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. 1. Extra Coating Materials: 1 gallon (4 liters) of each type and color. 2. Label each container with manufacturer's name, product number, color number, and room names and numbers where used.”
09 96 00 1.4.E214-215–

Division 20 Mechanical, common work 2 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MMaintenance dataSeismic Protection20 08 00 1.7.G · PDF p. 233
Spec wording
“G. Maintenance data: For seismic supports and restraints for inclusion in Operating and Maintenance Manual specified in Division 01, Division 23 Section "Basic Mechanical Requirements" and Division 26 Section "Common Work Results for Electrical."”
20 08 00 1.7.G233–
Test / cert.Test / cert.ReportSeismic Protection20 08 00 3.11.B · PDF p. 243
Spec wording
“B. Report: Submit a certification report of the authorized representative of the seismic restraint vendor to verify the above review and to include the following: 1. Certify that all seismic-restraint systems are installed properly and in compliance with these specifications and the submittals. 2. Identify those areas that require corrective measures or certify that no corrective measures are necessary. 3. Any ...”
20 08 00 3.11.B243–

Division 22 Plumbing 27 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MOperation and Maintenance ManualsBasic Plumbing Requirements22 01 00 1.4.C · PDF p. 245
Spec wording
“C. Operation and Maintenance Manuals: All items required for insertion into each Operation and Maintenance (O&M) Manual are called out in the submittals portion of each specification section or in a Submittal Log, if included within Division 01. It is the responsibility of the Contractor to ensure that the O&M submittal has been reviewed and includes all the requirements of the specifications. The Engineer of ...”
22 01 00 1.4.C245–
O&MO&MPrepare maintenance manuals in accordance with Division 01. In addition ...Basic Plumbing Requirements22 01 00 1.4.E · PDF p. 245-246
Spec wording
“E. Prepare maintenance manuals in accordance with Division 01. In addition to the requirements specified in Division 01, include the following information for equipment items: 1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts. 2. Manufacturer's printed operating ...”
22 01 00 1.4.E245-246–
Record docsRecord docsPrepare record documents in accordance with the requirements in Division ...Basic Plumbing Requirements22 01 00 1.4.I · PDF p. 246-247
Spec wording
“I. Prepare record documents in accordance with the requirements in Division 01. In addition to the requirements specified in Division 01, indicate the following installed conditions: 1. Mains and branches of piping systems, with valves and control devices located and numbered, concealed unions located, and with items requiring maintenance located (i.e., traps, strainers, expansion compensators, tanks, etc.). ...”
22 01 00 1.4.I246-247–
WarrantyWarrantyElectronic Media and Files:Basic Plumbing Requirements22 01 00 1.4.K · PDF p. 247
Spec wording
“K. Electronic Media and Files: 1. Electronic media files of the contract drawings in AutoCAD or PDF format and copies of the specifications in PDF format may be requested. 2. Complete and return a signed "Electronic File Transmittal" form provided by Introba upon request for electronic media, 3. Obtain approval from the appropriate Design Professional for use of their part of the documents if the information ...”
22 01 00 1.4.K247Electronic Media; AutoCAD; PDF; Electronic File
O&MO&MOperation and Maintenance DataMeters And Gages22 05 19 1.4.C · PDF p. 269
Spec wording
“C. Operation and Maintenance Data: For meters and gages to include in operation and maintenance manuals.”
22 05 19 1.4.C269–
O&MO&MMaintenance DataValves22 05 23 1.4.B · PDF p. 276
Spec wording
“B. Maintenance Data: For each type of valve, to include in the operation and maintenance manual specified in Division 01. Include detailed manufacturer's instructions on adjusting, servicing, disassembling, and repairing.”
22 05 23 1.4.B276–
Test / cert.Test / cert.Sustainable Design SubmittalsPlumbing Pipe Insulation22 07 00 1.4.B · PDF p. 293
Spec wording
“B. Sustainable Design Submittals. 1. Product Data for Credit IEQ 4.1: For solvent cements and adhesive primers, documentation including printed statement of VOC content. 2. Laboratory Test Reports for credit IEQ 4: For solvent cements and adhesive primers documentation indicating that products comply with the testing and product requirements for the California Department of Health Services' "Standard Practice for ...”
22 07 00 1.4.B293–
Test / cert.Test / cert.Material Test ReportsPlumbing Pipe Insulation22 07 00 1.4.F · PDF p. 293
Spec wording
“F. Material Test Reports: From a qualified testing agency acceptable to authorities having jurisdiction indicating, interpreting, and certifying test results for compliance of insulation materials, sealers, attachments, cements, and jackets, with requirements indicated. Include dates of tests and test methods employed.”
22 07 00 1.4.F293–
Test / cert.Test / cert.Field quality-control inspection reportsPlumbing Pipe Insulation22 07 00 1.4.G · PDF p. 294
Spec wording
“G. Field quality-control inspection reports.”
22 07 00 1.4.G294–
Test / cert.Test / cert.Testing AgencyPlumbing Pipe Insulation22 07 00 3.8.A · PDF p. 307
Spec wording
“A. Testing Agency: Owner will engage a qualified independent inspecting agency to perform field inspections and prepare inspection reports.”
22 07 00 3.8.A307–
Test / cert.Test / cert.Perform the following field tests and inspections and prepare test ...Plumbing Pipe Insulation22 07 00 3.8.B · PDF p. 307
Spec wording
“B. Perform the following field tests and inspections and prepare test reports: 1. Inspect ductwork in two locations randomly selected by Owner's Representative, by removing field-applied jacket and insulation in layers in reverse order of their installation. 2. Inspect two pieces of field-insulated equipment, randomly selected by Owner's Representative, by removing field-applied jacket and insulation in layers in ...”
22 07 00 3.8.B307–
Test / cert.Test / cert.Sustainable Design Submittals:Domestic Water Piping22 11 16 1.3.B · PDF p. 310
Spec wording
“B. Sustainable Design Submittals: 1. Product Data: For adhesives, indicating VOC content. 2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.”
22 11 16 1.3.B310–
Test / cert.Test / cert.Field quality-control reportsDomestic Water Piping22 11 16 1.4.B · PDF p. 310
Spec wording
“B. Field quality-control reports.”
22 11 16 1.4.B310–
Test / cert.Test / cert.Prepare test and inspection reportsDomestic Water Piping22 11 16 3.7.C · PDF p. 317
Spec wording
“C. Prepare test and inspection reports.”
22 11 16 3.7.C317–
Test / cert.Test / cert.Field quality-control reportsDomestic Water Piping Specialties22 11 19 1.4.A · PDF p. 320
Spec wording
“A. Field quality-control reports.”
22 11 19 1.4.A320–
O&MO&MOperation and Maintenance DataDomestic Water Piping Specialties22 11 19 1.5.A · PDF p. 320
Spec wording
“A. Operation and Maintenance Data: For domestic water piping specialties to include in emergency, operation, and maintenance manuals.”
22 11 19 1.5.A320–
Test / cert.Test / cert.Prepare test and inspection reportsDomestic Water Piping Specialties22 11 19 3.4.B · PDF p. 324
Spec wording
“B. Prepare test and inspection reports.”
22 11 19 3.4.B324–
Test / cert.Test / cert.Sustainable Design Submittals:Sanitary Waste And Vent Piping22 13 16 1.3.B · PDF p. 325
Spec wording
“B. Sustainable Design Submittals: 1. Product Data for Credit IEQ 4.1: For solvent cements and adhesives, and primers, documentation including printed statement of VOC content. 2. Laboratory Test Reports for credit IEQ 4: For solvent cements and adhesive primers documentation indicating that products comply with the testing and product requirements for the California Department of Health Services' "Standard Practice ...”
22 13 16 1.3.B325–
Test / cert.Test / cert.Field quality-control reportsSanitary Waste And Vent Piping22 13 16 1.4.B · PDF p. 325
Spec wording
“B. Field quality-control reports.”
22 13 16 1.4.B325–
Test / cert.Test / cert.ReportsSanitary Waste And Vent Piping22 13 16 3.6.C · PDF p. 332
Spec wording
“C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.”
22 13 16 3.6.C332–
Test / cert.Test / cert.Field quality-control reportsSanitary Waste Piping Specialties22 13 19 1.5.B · PDF p. 336
Spec wording
“B. Field quality-control reports.”
22 13 19 1.5.B336–
O&MO&MOperation and Maintenance DataSanitary Waste Piping Specialties22 13 19 1.6.A · PDF p. 336
Spec wording
“A. Operation and Maintenance Data: For sanitary waste piping specialties to include in emergency, operation, and maintenance manuals.”
22 13 19 1.6.A336–
O&MO&MOperation and Maintenance DataPlumbing Fixtures22 43 00 1.4.A · PDF p. 342
Spec wording
“A. Operation and Maintenance Data: For plumbing fixtures and faucets to include in operation and maintenance manuals. Include the following: a. Servicing and adjustments of flushometer valves, electronic sensors.”
22 43 00 1.4.A342–
Test / cert.Test / cert.Field quality-control reportsFacility Natural-Gas Piping22 68 00 1.5.E · PDF p. 349
Spec wording
“E. Field quality-control reports.”
22 68 00 1.5.E349–
O&MO&MOperation and Maintenance DataFacility Natural-Gas Piping22 68 00 1.6.A · PDF p. 349
Spec wording
“A. Operation and Maintenance Data: For pressure regulators to include in emergency, operation, and maintenance manuals.”
22 68 00 1.6.A349–
Test / cert.Test / cert.Prepare test and inspection reportsFacility Natural-Gas Piping22 68 00 3.8.D · PDF p. 360
Spec wording
“D. Prepare test and inspection reports.”
22 68 00 3.8.D360–
TrainingTrainingEngage a factory-authorized service representative to train Owner's maintenance personnel ...Facility Natural-Gas Piping22 68 00 3.9.A · PDF p. 360
Spec wording
“A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain earthquake valves.”
22 68 00 3.9.A360–

Division 23 HVAC 14 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MOperation and Maintenance ManualsBasic Mechanical Requirements23 01 00 1.3.D · PDF p. 363
Spec wording
“D. Operation and Maintenance Manuals: All items required for insertion into each Operation and Maintenance (O&M) Manual are called out in the submittals portion of each specification section or in a Submittal Log, if included within Division 01. It is the responsibility of the Contractor to ensure that the O&M submittal has been reviewed and includes all the requirements of the specifications. The Engineer of ...”
23 01 00 1.3.D363–
Record docsRecord docsPrepare record documents in accordance with the requirements in Division ...Basic Mechanical Requirements23 01 00 1.6.A · PDF p. 365
Spec wording
“A. Prepare record documents in accordance with the requirements in Division 01. In addition to the requirements specified in Division 01, indicate the following installed conditions: 1. Ductwork mains and branches, size and location, for both exterior and interior; locations of dampers and other control devices; filters, boxes, and terminal units requiring periodic maintenance or repair. 2. Mains and branches of ...”
23 01 00 1.6.A365–
O&MO&MPrepare maintenance manuals in accordance with Division 01. In addition ...Basic Mechanical Requirements23 01 00 1.7.A · PDF p. 365-366
Spec wording
“A. Prepare maintenance manuals in accordance with Division 01. In addition to the requirements specified in Division 01, include the following information for equipment items: 1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts. 2. Manufacturer's printed operating ...”
23 01 00 1.7.A365-366–
O&MO&MIn addition to the above, comply with ASHRAE Guideline 4-2008 ...Basic Mechanical Requirements23 01 00 1.7.B · PDF p. 366
Spec wording
“B. In addition to the above, comply with ASHRAE Guideline 4-2008 (RA 2013) Preparation of Operating and Maintenance Documentation for Building Systems.”
23 01 00 1.7.B366–
Record docsRecord docsRecord DrawingsMetal Ducts23 31 13 1.4.B · PDF p. 395
Spec wording
“B. Record Drawings: Indicate actual routing, fitting details, reinforcement, support, and installed accessories and devices.”
23 31 13 1.4.B395–
O&MO&MOperation and Maintenance DataDuct Accessories23 33 00 1.3.B · PDF p. 404
Spec wording
“B. Operation and Maintenance Data: For air duct accessories to include in operation and maintenance manuals.”
23 33 00 1.3.B404–
Spare partsSpare partsFurnish extra fusible links that match products installed and that ...Duct Accessories23 33 00 1.6.A · PDF p. 404
Spec wording
“A. Furnish extra fusible links that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. Furnish quantity equal to 10 percent of amount installed, but not less than two (2).”
23 33 00 1.6.A404–
Test / cert.Test / cert.Field quality-control test reportsFans And Ventilators23 34 23 1.4.E · PDF p. 413
Spec wording
“E. Field quality-control test reports.”
23 34 23 1.4.E413–
O&MO&MOperation and Maintenance DataFans And Ventilators23 34 23 1.4.F · PDF p. 413
Spec wording
“F. Operation and Maintenance Data: For fans and ventilators to include in emergency, operation, and maintenance manuals.”
23 34 23 1.4.F413–
Test / cert.Test / cert.Manufacturer's Field ServiceFans And Ventilators23 34 23 3.6.A · PDF p. 416-417
Spec wording
“A. Manufacturer's Field Service: Provide the services of a factory-authorized field service representative to inspect the installation of fans, including duct and electrical connections, and to report the results in writing. The field service representative shall perform, or shall witness the contractor's performance of, the following field tests and inspections and prepare test reports. 1. Verify that shipping, ...”
23 34 23 3.6.A416-417–
TrainingTrainingEngage a factory-authorized service representative to train Owner's maintenance personnel ...Fans And Ventilators23 34 23 3.7.A · PDF p. 417
Spec wording
“A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain fans and ventilators. Train Owner's maintenance personnel on procedures and schedules for starting and stopping, troubleshooting, servicing, and maintaining equipment and schedules.”
23 34 23 3.7.A417–
TrainingTrainingReview data in maintenance manuals. Refer to Division 01Fans And Ventilators23 34 23 3.7.B · PDF p. 417
Spec wording
“B. Review data in maintenance manuals. Refer to Division 01.”
23 34 23 3.7.B417–
TrainingTrainingSchedule training with Owner, through Architect, with at least seven ...Fans And Ventilators23 34 23 3.7.C · PDF p. 417
Spec wording
“C. Schedule training with Owner, through Architect, with at least seven days' advance notice.”
23 34 23 3.7.C417–
TrainingTrainingDemonstrate operation of fans and ventilators. Conduct walking tour of ...Fans And Ventilators23 34 23 3.7.D · PDF p. 417
Spec wording
“D. Demonstrate operation of fans and ventilators. Conduct walking tour of the Project. Briefly identify location and describe function, operation, and maintenance of each fan and ventilator.”
23 34 23 3.7.D417–

Division 26 Electrical 40 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MDefinitions:Common Work Results For Electrical26 05 00 1.6.B · PDF p. 425
Spec wording
“B. Definitions: 1. Product Data: Pre-printed manufacturer's data. 2. Shop Drawings: Drawings made specifically for the manufacture of a particular piece of equipment to be used on this project. 3. Operation and Maintenance Data: Information containing instructions on the proper operation, maintenance and repair of the equipment, complete with written text, diagrams, photos, exploded views and parts lists. 4. Record ...”
26 05 00 1.6.B425electronic media
O&MO&MOperation and Maintenance ManualsCommon Work Results For Electrical26 05 00 1.6.F · PDF p. 426
Spec wording
“F. Operation and Maintenance Manuals: All items required for insertion into each Operation and Maintenance (O&M) Manual are called out in the submittals portion of each specification section or in a Submittal Log, if included within Division 01. Ensure that the O&M submittal has been reviewed and includes all the requirements of the specifications. Submit only the data requested under the submittals portion of each ...”
26 05 00 1.6.F426–
WarrantyWarrantyRefer to the Division 01 "Closeout Procedures" for procedures and ...Common Work Results For Electrical26 05 00 1.10.A · PDF p. 428
Spec wording
“A. Refer to the Division 01 "Closeout Procedures" for procedures and submittal requirements for warranties. Refer to individual equipment specifications for warranty requirements.”
26 05 00 1.10.A428–
WarrantyWarrantyCompile and assemble the warranties specified in Divisions 26 into ...Common Work Results For Electrical26 05 00 1.10.B · PDF p. 428
Spec wording
“B. Compile and assemble the warranties specified in Divisions 26 into a separated set of vinyl covered, three-ring binders, tabulated and indexed for easy reference.”
26 05 00 1.10.B428three-ring; binders
WarrantyWarrantyProvide complete warranty information for each item to include product ...Common Work Results For Electrical26 05 00 1.10.C · PDF p. 428
Spec wording
“C. Provide complete warranty information for each item to include product or equipment, date of beginning of warranty or bond; duration of warranty or bond; and names, addresses, telephone numbers and procedures for filing a claim and obtaining warranty services.”
26 05 00 1.10.C428–
WarrantyWarrantyWarranty requires correction of all work found to be defective ...Common Work Results For Electrical26 05 00 1.10.D · PDF p. 428
Spec wording
“D. Warranty requires correction of all work found to be defective or nonconforming to the Contract Documents, without cost to the Owner. Bear all costs associated with corrective measures and damage due to defects or nonconformance with the Contract Documents, excluding repairs required as a result of improper maintenance or operation, or normal wear and tear as determined by the Engineer.”
26 05 00 1.10.D428–
Test / cert.Test / cert.The electrical systems shall be complete and operating. Include system ...Common Work Results For Electrical26 05 00 3.18.A · PDF p. 436
Spec wording
“A. The electrical systems shall be complete and operating. Include system start-up, testing, balancing and satisfactory system performance. This includes all calibration and adjustment of electrical controls, balancing of loads, troubleshooting and verification of software, and final adjustments that may be needed.”
26 05 00 3.18.A436–
Test / cert.Test / cert.All operating conditions and control sequences shall be tested during ...Common Work Results For Electrical26 05 00 3.18.B · PDF p. 436
Spec wording
“B. All operating conditions and control sequences shall be tested during the start-up period. Testing all interlocks, safety shut-downs, controls and alarms. 1. Utilize only skilled technicians to ensure that all systems perform properly. Reimburse the Owner on a time and materials basis for services rendered at the Engineer's standard hourly rates in effect when the services are requested if the Engineer is ...”
26 05 00 3.18.B436–
O&MO&MRefer to the Division 01 SectionCommon Work Results For Electrical26 05 00 3.20.A · PDF p. 437
Spec wording
“A. Refer to the Division 01 Section: "Closeout Procedures" for procedures and requirements for preparation and submittal of maintenance manuals.”
26 05 00 3.20.A437–
O&MO&MIn addition to the information required by Division 01 for ...Common Work Results For Electrical26 05 00 3.20.B · PDF p. 437
Spec wording
“B. In addition to the information required by Division 01 for Maintenance Data, include the following information: 1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of all replaceable parts. 2. Manufacturer's printed operating procedures to include start-up, break-in, routine and normal ...”
26 05 00 3.20.B437–
O&MO&MSubmit three (3) properly indexed and bound copies in "D" ...Common Work Results For Electrical26 05 00 3.20.C · PDF p. 437
Spec wording
“C. Submit three (3) properly indexed and bound copies in "D" ring style notebooks, of the Operations and Maintenance Instructions to the Architect or Engineer. Make all corrections or additions required.”
26 05 00 3.20.C437–
O&MO&MOperation and Maintenance Instructions shall include:Common Work Results For Electrical26 05 00 3.20.D · PDF p. 437-438
Spec wording
“D. Operation and Maintenance Instructions shall include: 1. Notebooks shall be heavy duty locking three-ring binders, black in color, and incorporate clear vinyl sheet sleeves on the front cover and spine for slip-in labeling. "Peel and stick" labels are not acceptable. Sheet lifters shall be supplied at the front of each notebook. Size notebooks a minimum of 1/2 inch thicker than the material for future inserts. ...”
26 05 00 3.20.D437-438three-ring; binders; binder
O&MO&MOperation and maintenance data shall consist of written instructions for ...Common Work Results For Electrical26 05 00 3.20.E · PDF p. 438
Spec wording
“E. Operation and maintenance data shall consist of written instructions for the care, maintenance, and operation of the equipment and systems. Instruction books, cards, manuals furnished with the equipment shall be included.”
26 05 00 3.20.E438–
O&MO&MIn addition to the information required by Division 01 for ...Common Work Results For Electrical26 05 00 3.20.F · PDF p. 438
Spec wording
“F. In addition to the information required by Division 01 for Maintenance Data, include the following information: 1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of all replaceable parts. 2. Manufacturer's printed operating procedures to include start-up, break-in, routine and normal ...”
26 05 00 3.20.F438–
O&MO&MAdequately instruct the Owner's designated representative in the maintenance, care, ...Common Work Results For Electrical26 05 00 3.20.G · PDF p. 438
Spec wording
“G. Adequately instruct the Owner's designated representative in the maintenance, care, and operation of the complete systems installed under this contract.”
26 05 00 3.20.G438–
O&MO&MProvide verbal and written instructions to the Owner's representatives by ...Common Work Results For Electrical26 05 00 3.20.H · PDF p. 438
Spec wording
“H. Provide verbal and written instructions to the Owner's representatives by factory personnel in the care, maintenance and operation of the equipment and systems.”
26 05 00 3.20.H438–
O&MO&MMake DVD format compact disc of the instructions to the ...Common Work Results For Electrical26 05 00 3.20.I · PDF p. 438
Spec wording
“I. Make DVD format compact disc of the instructions to the Owner while explaining the system so additional personnel may view the instructions at a later date. The video shall become the property of the Owner.”
26 05 00 3.20.I438DVD
O&MO&MThe instructions shall include:Common Work Results For Electrical26 05 00 3.20.J · PDF p. 438
Spec wording
“J. The instructions shall include: 1. Maintenance of equipment. 2. Start-up procedures for all major equipment. 3. Description of emergency system operation.”
26 05 00 3.20.J438–
O&MO&MNotify the Engineer of the time and place for the ...Common Work Results For Electrical26 05 00 3.20.K · PDF p. 438
Spec wording
“K. Notify the Engineer of the time and place for the verbal instructions to the Owner's representative so his representative can be present if desired.”
26 05 00 3.20.K438–
O&MO&MMinimum hours of instruction time for each item and/or system ...Common Work Results For Electrical26 05 00 3.20.L · PDF p. 438
Spec wording
“L. Minimum hours of instruction time for each item and/or system shall be as indicted in each individual specification section.”
26 05 00 3.20.L438–
O&MO&MOperating Instructions:Common Work Results For Electrical26 05 00 3.20.M · PDF p. 438
Spec wording
“M. Operating Instructions: 1. Include instructions to the Owner's representatives for the electrical and specialized systems, using factory-authorized technical representatives.”
26 05 00 3.20.M438–
Record docsRecord docsPrepare record documents in accordance with the requirements in Division ...Common Work Results For Electrical26 05 00 3.21.A · PDF p. 439
Spec wording
“A. Prepare record documents in accordance with the requirements in Division 01 Section "Closeout Procedures." In addition to the requirements specified in Division 01, indicate installed conditions for: 1. Raceways of 2-inches and larger, indicating size and location, for both exterior and interior; locations of control devices; distribution and branch electrical circuitry; and fuse and circuit breaker size and ...”
26 05 00 3.21.A439–
Record docsRecord docsMaintain at the job site a separate and complete set ...Common Work Results For Electrical26 05 00 3.21.B · PDF p. 439
Spec wording
“B. Maintain at the job site a separate and complete set of electrical drawings and specifications with all changes made to the systems clearly and permanently marked in complete detail.”
26 05 00 3.21.B439–
Record docsRecord docsMark Drawings to indicate revisions to conduit size and location ...Common Work Results For Electrical26 05 00 3.21.C · PDF p. 439
Spec wording
“C. Mark Drawings to indicate revisions to conduit size and location both exterior and interior; actual equipment locations, dimensioned from column lines; concealed equipment, dimensioned to column lines; distribution and branch electrical circuitry; fuse and circuit breaker size and arrangements; support and hanger details; Change Orders; concealed control system devices.”
26 05 00 3.21.C439–
Record docsRecord docsMark drawings and specifications to indicate approved substitutions; Change Orders, ...Common Work Results For Electrical26 05 00 3.21.D · PDF p. 439
Spec wording
“D. Mark drawings and specifications to indicate approved substitutions; Change Orders, and actual equipment and materials used. Mark all Change Orders, RFI responses, clarifications, and other supplemental instructions on the documents. Record documents that merely reference the existence of the above items are not acceptable. Reimburse the Engineer for all costs for the Engineer to develop record documents which ...”
26 05 00 3.21.D439–
Record docsRecord docsRecord changes daily and keep the marked drawings available for ...Common Work Results For Electrical26 05 00 3.21.E · PDF p. 439
Spec wording
“E. Record changes daily and keep the marked drawings available for the Architect or Engineer's examination at any normal work time.”
26 05 00 3.21.E439–
Record docsRecord docsUpon completing the job, and before final payment is made, ...Common Work Results For Electrical26 05 00 3.21.F · PDF p. 439
Spec wording
“F. Upon completing the job, and before final payment is made, give the marked-up drawings to the Engineer.”
26 05 00 3.21.F439–
Closeout stepCloseout stepThe following paragraphs supplement the requirements of Division 01:Common Work Results For Electrical26 05 00 3.22.A · PDF p. 439
Spec wording
“A. The following paragraphs supplement the requirements of Division 01:”
26 05 00 3.22.A439–
Test / cert.Test / cert.Final Jobsite Observation:Common Work Results For Electrical26 05 00 3.22.B · PDF p. 439-440
Spec wording
“B. Final Jobsite Observation: 1. Certify that the project jobsite is ready for the final jobsite observation. 2. Reimburse the Engineer, based on the Engineer's standard hourly rates as defined in their contract with the Owner, for additional time and expenses when additional trips are required because the project jobsite was not ready for final observation and additional trips are required by the Engineer for ...”
26 05 00 3.22.B439-440–
O&MO&MSubmit the following documents to the Architect or Engineer prior ...Common Work Results For Electrical26 05 00 3.22.C · PDF p. 440
Spec wording
“C. Submit the following documents to the Architect or Engineer prior to requesting final payment: 1. Operation and maintenance manuals with copies of approved shop drawings. 2. Record documents including electronic AutoCAD or REVIT drawings and specifications. 3. Documentation of completion of all required training of Owner's personnel. 4. Provide spare parts, maintenance and extra materials in quantities specified ...”
26 05 00 3.22.C440AutoCAD; REVIT
Record docsRecord docsPlans showing dimensioned as-built locations of grounding features specified in ...Grounding And Bonding26 05 26 1.3.B · PDF p. 448
Spec wording
“B. Plans showing dimensioned as-built locations of grounding features specified in "Field Quality Control" Article, including the following: 1. Test wells. 2. Ground rods. 3. Grounding arrangements and connections for separately derived systems. 4. Grounding for sensitive electronic equipment.”
26 05 26 1.3.B448–
Test / cert.Test / cert.Field Test ReportsGrounding And Bonding26 05 26 1.3.C · PDF p. 448
Spec wording
“C. Field Test Reports: Submit written test reports to include the following: 1. Test procedures used. 2. Weather and soil conditions observed on test date. 3. Test results that comply with requirements. 4. Results of failed tests and corrective action taken to achieve test results that comply with requirements.”
26 05 26 1.3.C448–
Record docsRecord docsAccurately record actual routing of all feeder and sub-feeder conduits ...Raceways26 05 33 3.8.A · PDF p. 470
Spec wording
“A. Accurately record actual routing of all feeder and sub-feeder conduits regardless of size and branch circuits conduits larger than 2-inches.”
26 05 33 3.8.A470–
O&MO&MOperation and Maintenance DataLighting Control Devices26 09 23 1.3.D · PDF p. 476
Spec wording
“D. Operation and Maintenance Data: For each type of lighting control device to include in emergency, operation, and maintenance manuals.”
26 09 23 1.3.D476–
TrainingTrainingTrain Owner's maintenance personnel to adjust, operate, and maintain lighting ...Lighting Control Devices26 09 23 3.5.A · PDF p. 486
Spec wording
“A. Train Owner's maintenance personnel to adjust, operate, and maintain lighting control devices.”
26 09 23 3.5.A486–
WarrantyWarrantyWarranty Period for LED chips/arrays and driversLighting26 51 00 1.7.A · PDF p. 499
Spec wording
“A. Warranty Period for LED chips/arrays and drivers: 5 years from date of substantial completion.”
26 51 00 1.7.A499–
WarrantyWarrantyWarranty Period for Emergency Lighting Unit Batteries, and self-powered exit ...Lighting26 51 00 1.7.B · PDF p. 499
Spec wording
“B. Warranty Period for Emergency Lighting Unit Batteries, and self-powered exit signs: 5 years from date of substation completion.”
26 51 00 1.7.B499–
WarrantyWarrantyWarranty Period for LuminairesLighting26 51 00 1.7.C · PDF p. 499
Spec wording
“C. Warranty Period for Luminaires: 5 years from date of substantial completion.”
26 51 00 1.7.C499–
WarrantyWarrantyWarranty Period for PolesLighting26 51 00 1.7.D · PDF p. 499
Spec wording
“D. Warranty Period for Poles: 5 years from date of substantial completion.”
26 51 00 1.7.D499–
Test / cert.Test / cert.Prepare a written report of tests, inspections, observations, and verifications ...Lighting26 51 00 3.3.D · PDF p. 505
Spec wording
“D. Prepare a written report of tests, inspections, observations, and verifications indicating and interpreting results. If adjustments are made to lighting system, retest to demonstrate compliance with standards.”
26 51 00 3.3.D505–

Division 28 Fire alarm and security 5 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Field quality-control reportsConventional Fire-Alarm Systems28 46 21.13 1.3.B · PDF p. 507
Spec wording
“B. Field quality-control reports.”
28 46 21.13 1.3.B507–
O&MO&MOperation and Maintenance DataConventional Fire-Alarm Systems28 46 21.13 1.4.A · PDF p. 507
Spec wording
“A. Operation and Maintenance Data: For fire-alarm systems and components to include in emergency, operation, and maintenance manuals.”
28 46 21.13 1.4.A507–
WarrantyWarrantySpecial WarrantyConventional Fire-Alarm Systems28 46 21.13 1.6.A · PDF p. 507
Spec wording
“A. Special Warranty: Manufacturer agrees to repair or replace fire-alarm system equipment and components that fail in materials or workmanship within specified warranty period. 1. Warranty Extent: All equipment and components not covered in the Maintenance Service Agreement. 2. Warranty Period: Five years from date of Substantial Completion.”
28 46 21.13 1.6.A507–
Test / cert.Test / cert.Prepare test and inspection reportsConventional Fire-Alarm Systems28 46 21.13 3.4.E · PDF p. 510
Spec wording
“E. Prepare test and inspection reports.”
28 46 21.13 3.4.E510–
TrainingTrainingTrain Owner's maintenance personnel to adjust, operate, and maintain fire-alarm ...Conventional Fire-Alarm Systems28 46 21.13 3.5.A · PDF p. 510
Spec wording
“A. Train Owner's maintenance personnel to adjust, operate, and maintain fire-alarm system.”
28 46 21.13 3.5.A510–

Front end Contract conditions (final payment, releases, retainage) 12 items

TypeItemSpec sectionPDF pageCopies / format
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 24
Spec wording
“DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION FINAL RECEIPT OF PAYMENT AND RELEASE KNOW ALL MEN BY THESE PRESENT THAT: hereinafter called "Subcontractor" who heretofore entered into an agreement with hereinafter called "Contractor", for the performance of work and/or furnishing of material for the construction of the project entitled (PROJECT TITLE, PROJECT LOCATION, AND PROJECT NUMBER) at (ADDRESS OF ...”
Conditions Of The Contract (Find Heading On The Cited Page)24–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 35
Spec wording
“The Contractor shall update a complete set of the construction drawings, shop drawings and schedules of all work monthly by marking changes, and at the completion of their work (prior to submission of request for final payment) note all changes and turn the set over to the Construction Representative.”
Conditions Of The Contract (Find Heading On The Cited Page)35–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 36
Spec wording
“Prior to the final payment, furnish to the Designer three (4) copies of parts catalogs for each piece of equipment furnished by him/her on the project with the components identified by number for replacement ordering.”
Conditions Of The Contract (Find Heading On The Cited Page)36three (4) copies
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 42
Spec wording
“The Contractor shall be allowed to include in the Application and Certification for Payment, one hundred (100%) of the value, subject to retainage, of major equipment and material stored off the site if all of the following conditions are met: 1.”
Conditions Of The Contract (Find Heading On The Cited Page)42–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 43
Spec wording
“The final payment shall not become due until the Contractor delivers to the Construction Representative: a) A complete file of releases, on the standard form included in the contract documents as "Final Receipt of Payment and Release Form", from subcontractors and material suppliers evidencing payment in full for services, equipment and materials, as the case may require, if the Owner approves, or a consent from ...”
Conditions Of The Contract (Find Heading On The Cited Page)43–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 55
Spec wording
“The Contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed.”
Conditions Of The Contract (Find Heading On The Cited Page)55–
WarrantyWarrantyA. General Guaranty 1. Neither the final certificate of payment ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 35
Spec wording
“A. General Guaranty 1. Neither the final certificate of payment nor any provision in the contract documents nor partial use or occupancy of the premises by the Owner shall constitute an acceptance of work not done in accordance with contract 2. The Contractor or surety shall remedy any defects in the work and pay for any damage to property resulting there from which shall appear within a period of one (1) year from ...”
Conditions Of The Contract ARTICLE.A35–
WarrantyWarrantyB. Extended Warranty Manufacturer's certificates of warranty shall be obtained ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 35
Spec wording
“B. Extended Warranty Manufacturer's certificates of warranty shall be obtained for all major equipment. Warranty shall be obtained for at least one year. Where a longer period is offered at no additional cost or called for in the specific equipment specifications, the longer period shall govern.”
Conditions Of The Contract ARTICLE.B35–
O&MO&MA. Immediately after equipment submittals are approved and no later ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 35-36
Spec wording
“A. Immediately after equipment submittals are approved and no later than ten (10) working days prior to the substantial completion inspection, the Contractor shall provide to the Designer three (3) copies of operating instructions and service manuals, containing the following: 1. Start-up and Shut-down Procedures: Provide a step-by-step write up of all major equipment. When manufacturer's printed start-up, trouble ...”
Conditions Of The Contract ARTICLE.A35-36three (3) copies; three (4) copies
O&MO&MB. Submission of operating instructions shall be done in the ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 36
Spec wording
“B. Submission of operating instructions shall be done in the following manner. 1. Manuals shall be in quadruplicate, and all materials shall be bound into volumes of standard 8½" x 11" hard binders. Large drawings too bulky to be folded into 8½" x 11" shall be separately bound or folded and in envelopes, cross referenced and indexed with the manuals. 2. The manuals shall identify project name, project number, and ...”
Conditions Of The Contract ARTICLE.B36binders; binder
O&MO&MA. Substantial Completion. A Project is substantially complete when construction ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 40-41
Spec wording
“A. Substantial Completion. A Project is substantially complete when construction is essentially complete and work items remaining to be completed can be done without interfering with the Owner's ability to use the Project for its intended purpose. 1. Once the Contractor has reached what they believe is Substantial Completion, the Contractor shall notify the Designer and the Construction Representative of the ...”
Conditions Of The Contract ARTICLE.A40-41–
Test / cert.Test / cert.C. Final Completion. The Project is finally complete when the ...Conditions Of The ContractConditions Of The Contract ARTICLE.C · PDF p. 41
Spec wording
“C. Final Completion. The Project is finally complete when the Certificate of Substantial Completion has been issued and all work items identified therein as incomplete have been completed, and when all administrative items required by the contract have been completed. Final Completion entitles the Contractor to payment of the outstanding balance of the contract amount including all change orders and retainage. ...”
Conditions Of The Contract ARTICLE.C41–

Don't want to chase all of this yourself?

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.