Free closeout checklist · State job · Missouri

Closeout checklist: Improvements to Food Preparation Area, Support Building, Missouri Eastern Correctional Center (Missouri FMDC, MO)

Every closeout item we found in the public spec book for this job: 69 items across Division 01, 10 trade divisions and the contract conditions, including 21 tests and certificates, 15 warranties and 15 training items. Each one is tied to its spec section and the PDF page it sits on.

Owner
State of Missouri, Office of Administration, Division of Facilities Management, Design and Construction (FMDC)
Number
FMDC project C2509-01
Location
Pacific, MO
Bid date
2026-01-20
Public spec book
Spec book PDF on the Missouri FMDC bid listing
FMDC bid listing
Spec book size
334 PDF pages
Checklist built
2026-10-21

Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.

What this job asks for at closeout

15Warranties
10O&M manuals
21Tests and certificates
15Training
0Record documents
2Spare parts
5Payment release
1Closeout steps

All 69 items, by trade

Division 01 General requirements 21 items

TypeItemSpec sectionPDF pageCopies / format
O&MO&MThe Contractor shall submit to the Designer, within ten (10) ...Schedule – Bar Chart01 32 00 3.1.A · PDF p. 71
Spec wording
“A. The Contractor shall submit to the Designer, within ten (10) working days following the Notice to Proceed, a Progress Schedule including Schedule of Values showing the rate of progress the Contractor agrees to maintain and the order in which he proposed to carry out the various phases of Work. No payments shall be made to the Contractor until the Progress Schedule has been approved by the Owner. 1. The Schedule ...”
01 32 00 3.1.A71–
WarrantyWarrantyThe Contractor shall submit all required manufacturer's operating instructions, maintenance/service ...Submittals01 33 00 1.8.A · PDF p. 80
Spec wording
“A. The Contractor shall submit all required manufacturer's operating instructions, maintenance/service manuals, and warranties in accordance with the General Conditions, Article 3.5, and Supplementary Conditions along with this and other Sections of the Contract Documents.”
01 33 00 1.8.A80–
O&MO&MContractor shall submit the following information for materials and equipment ...Submittals01 33 00 3.1.A · PDF p. 80-81
Spec wording
“A. Contractor shall submit the following information for materials and equipment to be provided under this contract. SPEC SECTION TITLE CATEGORY 013200 Schedules Construction Schedule 013200 Schedules Schedule of Values 013200 Schedules List of Subcontractors 013200 Schedules Major Material Suppliers 017900 Demonstration and Training Construction Schedule 017900 Demonstration and Training Operation / Maintenance ...”
01 33 00 3.1.A80-81–
Test / cert.Test / cert.If any worker has a tuberculin skin test with positive ...Site Security And Health Requirements (Doc)01 35 13.16 3.5.D · PDF p. 85
Spec wording
“D. If any worker has a tuberculin skin test with positive results, the worker shall be denied access to the facility until the worker produces a certification from a physician licensed to practice in the State of Missouri that the worker does not have infectious tuberculosis.”
01 35 13.16 3.5.D85–
TrainingTrainingInstruction ProgramDemonstration And Training01 79 00 1.3.A · PDF p. 104
Spec wording
“A. Instruction Program: Submit outline of instructional program for demonstration and training, including a list of training modules and a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module.”
01 79 00 1.3.A104–
TrainingTrainingAttendance RecordDemonstration And Training01 79 00 1.3.B · PDF p. 104
Spec wording
“B. Attendance Record: For each training module, submit list of participants and length of instruction time.”
01 79 00 1.3.B104–
TrainingTrainingEvaluationsDemonstration And Training01 79 00 1.3.C · PDF p. 104
Spec wording
“C. Evaluations: For each participant and for each training module, submit results and documentation of performance-based test.”
01 79 00 1.3.C104–
TrainingTrainingDemonstration and Training Video RecordingsDemonstration And Training01 79 00 1.4.A · PDF p. 104-105
Spec wording
“A. Demonstration and Training Video Recordings: Submit two copies within seven days of end of each training module. 1. Identification: On each copy, provide an applied label with the following information: a. Name of Project. b. Name and address of videographer. c. Name of Architect. d. Name of Construction Manager. e. Name of Contractor. f. Date of video recording. 2. Transcript: Prepared in PDF electronic format. ...”
01 79 00 1.4.A104-105two copies; PDF; electronic format; electronic file
TrainingTrainingFacilitator QualificationsDemonstration And Training01 79 00 1.5.A · PDF p. 105
Spec wording
“A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance.”
01 79 00 1.5.A105–
TrainingTrainingPreinstruction ConferenceDemonstration And Training01 79 00 1.5.C · PDF p. 105
Spec wording
“C. Preinstruction Conference: Conduct conference at Project site to comply with requirements in Section 013100 "Coordination". Review methods and procedures related to demonstration and training including, but not limited to, the following: 1. Inspect and discuss locations and other facilities required for instruction. 2. Review and finalize instruction schedule and verify availability of educational materials, ...”
01 79 00 1.5.C105–
O&MO&MCoordinate content of training modules with content of approved emergency, ...Demonstration And Training01 79 00 1.6.C · PDF p. 105
Spec wording
“C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Architect.”
01 79 00 1.6.C105–
WarrantyWarrantyTraining ModulesDemonstration And Training01 79 00 2.1.B · PDF p. 106-107
Spec wording
“B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following as applicable to the system, equipment, or component: 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: a. System, subsystem, and equipment ...”
01 79 00 2.1.B106-107–
TrainingTrainingAssemble educational materials necessary for instruction, including documentation and training ...Demonstration And Training01 79 00 3.1.A · PDF p. 108
Spec wording
“A. Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a training manual organized in coordination with requirements in Section 007213 "General Conditions".”
01 79 00 3.1.A108–
TrainingTrainingEngage qualified instructors to instruct Owner's personnel to adjust, operate, ...Demonstration And Training01 79 00 3.2.A · PDF p. 108
Spec wording
“A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. 1. Architect will furnish an instructor to describe basis of system design, operational requirements, criteria, and regulatory requirements. 2. Owner will furnish an instructor to describe Owner's operational philosophy. 3. Owner will furnish Contractor with names ...”
01 79 00 3.2.A108–
TrainingTrainingSchedulingDemonstration And Training01 79 00 3.2.B · PDF p. 108
Spec wording
“B. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season. 1. Schedule training with Owner with at least seven days' advance notice.”
01 79 00 3.2.B108–
TrainingTrainingGeneralDemonstration And Training01 79 00 3.3.A · PDF p. 108
Spec wording
“A. General: Engage a qualified commercial videographer to record demonstration and training video recordings. Record each training module separately. Include classroom instructions and demonstrations, board diagrams, and other visual aids, but not student practice. 1. At beginning of each training module, record each chart containing learning objective and lesson outline.”
01 79 00 3.3.A108–
TrainingTrainingVideoDemonstration And Training01 79 00 3.3.B · PDF p. 108-109
Spec wording
“B. Video: Provide minimum 640 x 480 video resolution converted to format file type acceptable to Owner, on electronic media. 1. Electronic Media: Read-only format compact disc acceptable to Owner, with commercial-grade graphic label. 2. File Hierarchy: Organize folder structure and file locations according to project manual table of contents. Provide complete screen-based menu. 3. File Names: Utilize file names ...”
01 79 00 3.3.B108-109electronic media; DVD
TrainingTrainingLight LevelsDemonstration And Training01 79 00 3.3.D · PDF p. 109
Spec wording
“D. Light Levels: Verify light levels are adequate to properly light equipment. Verify equipment markings are clearly visible prior to recording. 1. Furnish additional portable lighting as required.”
01 79 00 3.3.D109–
TrainingTrainingNarrationDemonstration And Training01 79 00 3.3.E · PDF p. 109
Spec wording
“E. Narration: Describe scenes on video recording by audio narration by microphone while video recording is recorded. Include description of items being viewed.”
01 79 00 3.3.E109–
TrainingTrainingTranscriptDemonstration And Training01 79 00 3.3.F · PDF p. 109
Spec wording
“F. Transcript: Provide a transcript of the narration. Display images and running time captured from videotape opposite the corresponding narration segment.”
01 79 00 3.3.F109–
TrainingTrainingPreproduced Video RecordingsDemonstration And Training01 79 00 3.3.G · PDF p. 109
Spec wording
“G. Preproduced Video Recordings: Provide video recordings used as a component of training modules in same format as recordings of live training.”
01 79 00 3.3.G109–

Division 02 Existing conditions 2 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyWarrantiesSelective Demolition02 41 19 1.6.D · PDF p. 111
Spec wording
“D. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.”
02 41 19 1.6.D111–
Closeout stepCloseout stepInventorySelective Demolition02 41 19 1.7.A · PDF p. 111
Spec wording
“A. Inventory: Submit a list of items that have been removed and salvaged.”
02 41 19 1.7.A111–

Division 03 Concrete 6 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyDesign MixturesCast-In-Place Concrete03 30 00 1.3.B · PDF p. 117
Spec wording
“B. Design Mixtures: For each concrete mixture, include the following: 1. Mixture identification. 2. Compressive strength at 28 days or other age as specified. 3. Compressive strength required at stages of construction. 4. Durability exposure classes for Exposure Categories F, S, W, and C. 5. Maximum w/cm ratio. 6. Slump or slump flow limit. 7. Air content. 8. Nominal maximum aggregate size. 9. Submit adjustments to ...”
03 30 00 1.3.B117–
Test / cert.Test / cert.Material Test ReportsCast-In-Place Concrete03 30 00 1.4.B · PDF p. 117-118
Spec wording
“B. Material Test Reports: For the following: 1. Portland cement. 2. Fly ash. 3. Slag cement. 4. Silica fume. 5. Natural or other pozzolans. 6. Aggregates. 7. Admixtures.”
03 30 00 1.4.B117-118–
Test / cert.Test / cert.Field quality-control reportsCast-In-Place Concrete03 30 00 1.4.C · PDF p. 118
Spec wording
“C. Field quality-control reports.”
03 30 00 1.4.C118–
WarrantyWarrantyManufacturer's WarrantyCast-In-Place Concrete03 30 00 1.8.A · PDF p. 119
Spec wording
“A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement sheet vapor retarder/termite barrier material and accessories for sheet vapor retarder/ termite barrier and accessories that do not comply with requirements or that fail to resist penetration by termites within specified warranty period. 1. Warranty Period: 10 years from date of Substantial Completion.”
03 30 00 1.8.A119–
Test / cert.Test / cert.Special InspectionsCast-In-Place Concrete03 30 00 3.13.A · PDF p. 127
Spec wording
“A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.”
03 30 00 3.13.A127–
Test / cert.Test / cert.Testing AgencyCast-In-Place Concrete03 30 00 3.13.B · PDF p. 127-128
Spec wording
“B. Testing Agency: a qualified testing and inspecting agency to perform tests and inspections and to submit reports. 1. Testing agency to be responsible for providing curing facility for initial curing of strength test specimens on-site and verifying that test specimens are cured in accordance with standard curing requirements in ASTM C31/C31M. 2. Testing agency to immediately report to Architect, Contractor, and ...”
03 30 00 3.13.B127-128–

Division 04 Masonry 2 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Material CertificatesConcrete Unit Masonry04 22 00 1.5.B · PDF p. 132
Spec wording
“B. Material Certificates: For each type and size of the following: 1. Masonry units. a. Include both data on material properties and material test reports substantiating compliance with requirements. 2. Integral water repellent used in CMUs, if not surface treated. 3. Cementitious materials. Include name of manufacturer, brand name, and type. 4. Mortar admixtures. 5. Preblended, dry mortar mixes. Include ...”
04 22 00 1.5.B132–
Test / cert.Test / cert.Mix DesignsConcrete Unit Masonry04 22 00 1.5.C · PDF p. 132
Spec wording
“C. Mix Designs: For each type of mortar and grout. Include description of type and proportions of ingredients. 1. Include test reports for mortar mixes required to comply with property specification. Test in accordance with ASTM C109/C109M for compressive strength, ASTM C1506 for water retention, and ASTM C91/C91M for air content.”
04 22 00 1.5.C132–

Division 08 Doors, windows and hardware 3 items

TypeItemSpec sectionPDF pageCopies / format
WarrantyWarrantyInformational Submittals:Door Hardware08 71 00 1.3.C · PDF p. 151
Spec wording
“C. Informational Submittals: 1. Provide Qualification Data for Supplier, Installer and Architectural Hardware Consultant. 2. Provide Product Data: a. Certify that door hardware approved for use on types and sizes of labeled fire-rated doors complies with listed fire-rated door assemblies. b. Include warranties for specified door hardware.”
08 71 00 1.3.C151–
WarrantyWarrantyCloseout Submittals:Door Hardware08 71 00 1.3.D · PDF p. 151
Spec wording
“D. Closeout Submittals: 1. Operations and Maintenance Data: Provide in accordance with Division 01 and include: a. Complete information on care, maintenance, and adjustment; data on repair and replacement parts, and information on preservation of finishes. b. Catalog pages for each product. c. Final approved hardware schedule edited to reflect conditions as installed. d. Final keying schedule e. Copy of warranties ...”
08 71 00 1.3.D151–
WarrantyWarrantyManufacturer's standard form in which manufacturer agrees to repair or ...Door Hardware08 71 00 1.7.A · PDF p. 154
Spec wording
“A. Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within published warranty period. 1. Warranty does not cover damage or faulty operation due to improper installation, improper use or abuse. 2. Warranty Period: Beginning from date of Substantial Completion, for durations indicated in manufacturer's published listings. ...”
08 71 00 1.7.A154–

Division 09 Finishes 7 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Product Test Reports:Ceramic Tiling09 30 13 1.4.D · PDF p. 169
Spec wording
“D. Product Test Reports: 1. Tile-setting and -grouting products. 2. Certified porcelain tile. 3. Slip-resistance test reports from qualified independent testing agency.”
09 30 13 1.4.D169–
Test / cert.Test / cert.Field Quality-Control ReportsCeramic Tiling09 30 13 1.4.E · PDF p. 169
Spec wording
“E. Field Quality-Control Reports: Water test reports of membrane in wet areas.”
09 30 13 1.4.E169–
WarrantyWarrantySystem WarrantyCeramic Tiling09 30 13 1.8.A · PDF p. 169
Spec wording
“A. System Warranty: Manufacturer's non-prorated comprehensive warranty that agrees to repair and replace defective installation areas, material, and labor that fail under normal usage within specified warranty period. 1. Warranty Period: Manufacturer's listed warranty from date of Product Purchase.”
09 30 13 1.8.A169–
WarrantyWarrantyStandard IPC Limited Lifetime Warranty against material and manufacturing defects ...Stainless Steel Wall Panels And Trim09 78 13 1.5.A · PDF p. 178
Spec wording
“A. Standard IPC Limited Lifetime Warranty against material and manufacturing defects for wall panels.”
09 78 13 1.5.A178–
WarrantyWarrantyStandardStainless Steel Wall Panels And Trim09 78 13 1.5.B · PDF p. 178
Spec wording
“B. Standard”
09 78 13 1.5.B178–
Spare partsSpare partsFurnish extra materials that match products installed and that are ...Interior Painting09 91 23 1.4.A · PDF p. 183
Spec wording
“A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.”
09 91 23 1.4.A183–
Spare partsSpare partsFurnish extra materials, from the same product run, that match ...High-Performance Coatings09 96 00 1.5.A · PDF p. 189
Spec wording
“A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Coatings: 10 percent, but not less than 1 gal. (3.8 L) of each material and color applied.”
09 96 00 1.5.A189–

Division 11 Equipment 1 item

TypeItemSpec sectionPDF pageCopies / format
O&MO&MOperation and maintenance dataFoodservice Equipment11 40 00 1.4.A · PDF p. 193
Spec wording
“A. Operation and maintenance data.”
11 40 00 1.4.A193–

Division 22 Plumbing 6 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Prepare test and inspection reportsPlumbing Piping Insulation22 07 19 3.12.G · PDF p. 230
Spec wording
“G. Prepare test and inspection reports.”
22 07 19 3.12.G230–
Test / cert.Test / cert.Prepare test and inspection reportsDomestic Water Piping22 11 16 3.11.C · PDF p. 238
Spec wording
“C. Prepare test and inspection reports.”
22 11 16 3.11.C238–
WarrantyWarrantyListed manufacturers to provide labeling and warranty of their respective ...Sanitary Waste And Vent Piping22 13 16 1.4.A · PDF p. 245
Spec wording
“A. Listed manufacturers to provide labeling and warranty of their respective products.”
22 13 16 1.4.A245–
Test / cert.Test / cert.ReportsSanitary Waste And Vent Piping22 13 16 3.8.C · PDF p. 252
Spec wording
“C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.”
22 13 16 3.8.C252–
O&MO&MOperation and Maintenance DataSanitary Waste Piping Specialties22 13 19 1.4.A · PDF p. 255
Spec wording
“A. Operation and Maintenance Data: For sanitary waste piping specialties to include in emergency, operation, and maintenance manuals.”
22 13 19 1.4.A255–
O&MO&MOperation and maintenance dataCommercial Plumbing Fixtures22 42 00 1.3.A · PDF p. 261
Spec wording
“A. Operation and maintenance data.”
22 42 00 1.3.A261–

Division 26 Electrical 6 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Perform tests and inspections and prepare test reportsLow-Voltage Electrical Power Conductors And Cables26 05 19 3.8.A · PDF p. 274
Spec wording
“A. Perform tests and inspections and prepare test reports.”
26 05 19 3.8.A274–
Test / cert.Test / cert.Test ReportsLow-Voltage Electrical Power Conductors And Cables26 05 19 3.8.C · PDF p. 275
Spec wording
“C. Test Reports: Prepare a written report to record the following: 1. Test procedures used. 2. Test results that comply with requirements. 3. Test results that do not comply with requirements and corrective action taken to achieve compliance with requirements.”
26 05 19 3.8.C275–
Test / cert.Test / cert.Field quality-control reportsWiring Devices26 27 26 1.5.A · PDF p. 290
Spec wording
“A. Field quality-control reports.”
26 27 26 1.5.A290–
O&MO&MOperation and Maintenance DataWiring Devices26 27 26 1.6.A · PDF p. 290
Spec wording
“A. Operation and Maintenance Data: For wiring devices to include in all manufacturers' packing-label warnings and instruction manuals that include labeling conditions.”
26 27 26 1.6.A290–
Test / cert.Test / cert.Prepare test and inspection reports and submit to ownerWiring Devices26 27 26 3.4.F · PDF p. 295
Spec wording
“F. Prepare test and inspection reports and submit to owner.”
26 27 26 3.4.F295–
WarrantyWarrantyManufacturer's WarrantyEnclosed Switches And Circuit Breakers26 28 16 1.3.A · PDF p. 296
Spec wording
“A. Manufacturer's Warranty: Manufacturer and Installer agree to repair or replace components that fail in materials or workmanship within specified warranty period. 1. Warranty Period: One year(s) from date of Substantial Completion.”
26 28 16 1.3.A296–

Division 31 Earthwork 2 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Material Test ReportsEarth Moving31 20 00 1.5.B · PDF p. 300
Spec wording
“B. Material Test Reports: For each soil material proposed for fill and backfill as follows: 1. Classification according to ASTM D 2487. 2. Laboratory compaction curve according to ASTM D 698.”
31 20 00 1.5.B300–
Test / cert.Test / cert.When testing agency reports that subgrades, fills, or backfills have ...Earth Moving31 20 00 3.17.F · PDF p. 309
Spec wording
“F. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil materials to depth required; recompact and retest until specified compaction is obtained.”
31 20 00 3.17.F309–

Division 32 Paving and site improvements 2 items

TypeItemSpec sectionPDF pageCopies / format
Test / cert.Test / cert.Testing AgencyConcrete Paving32 13 13 3.11.A · PDF p. 314
Spec wording
“A. Testing Agency: Contractor shall engage a qualified testing and inspecting agency to sample materials, perform tests, and submit test reports during concrete placement.”
32 13 13 3.11.A314–
Test / cert.Test / cert.Test results shall be reported in writing to the Owner, ...Concrete Paving32 13 13 3.11.D · PDF p. 315
Spec wording
“D. Test results shall be reported in writing to the Owner, concrete manufacturer and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, ...”
32 13 13 3.11.D315–

Front end Contract conditions (final payment, releases, retainage) 11 items

TypeItemSpec sectionPDF pageCopies / format
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 23
Spec wording
“DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION FINAL RECEIPT OF PAYMENT AND RELEASE KNOW ALL MEN BY THESE PRESENT THAT: hereinafter called "Subcontractor" who heretofore entered into an agreement with hereinafter called "Contractor", for the performance of work and/or furnishing of material for the construction of the project entitled (PROJECT TITLE, PROJECT LOCATION, AND PROJECT NUMBER) at (ADDRESS OF ...”
Conditions Of The Contract (Find Heading On The Cited Page)23–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 34
Spec wording
“The Contractor shall update a complete set of the construction drawings, shop drawings and schedules of all work monthly by marking changes, and at the completion of their work (prior to submission of request for final payment) note all changes and turn the set over to the Construction Representative.”
Conditions Of The Contract (Find Heading On The Cited Page)34–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 35
Spec wording
“Prior to the final payment, furnish to the Designer three (4) copies of parts catalogs for each piece of equipment furnished by him/her on the project with the components identified by number for replacement ordering.”
Conditions Of The Contract (Find Heading On The Cited Page)35three (4) copies
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 41
Spec wording
“The Contractor shall be allowed to include in the Application and Certification for Payment, one hundred (100%) of the value, subject to retainage, of major equipment and material stored off the site if all of the following conditions are met: 1.”
Conditions Of The Contract (Find Heading On The Cited Page)41–
Payment releasePayment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 42
Spec wording
“The final payment shall not become due until the Contractor delivers to the Construction Representative: a) A complete file of releases, on the standard form included in the contract documents as "Final Receipt of Payment and Release Form", from subcontractors and material suppliers evidencing payment in full for services, equipment and materials, as the case may require, if the Owner approves, or a consent from ...”
Conditions Of The Contract (Find Heading On The Cited Page)42–
WarrantyWarrantyA. General Guaranty 1. Neither the final certificate of payment ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 34
Spec wording
“A. General Guaranty 1. Neither the final certificate of payment nor any provision in the contract documents nor partial use or occupancy of the premises by the Owner shall constitute an acceptance of work not done in accordance with contract requirements. 2. The Contractor or surety shall remedy any defects in the work and pay for any damage to property resulting there from which shall appear within a period of one ...”
Conditions Of The Contract ARTICLE.A34–
WarrantyWarrantyB. Extended Warranty Manufacturer's certificates of warranty shall be obtained ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 34
Spec wording
“B. Extended Warranty Manufacturer's certificates of warranty shall be obtained for all major equipment. Warranty shall be obtained for at least one year. Where a longer period is offered at no additional cost or called for in the specific equipment specifications, the longer period shall govern.”
Conditions Of The Contract ARTICLE.B34–
O&MO&MA. Immediately after equipment submittals are approved and no later ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 34-35
Spec wording
“A. Immediately after equipment submittals are approved and no later than ten (10) working days prior to the substantial completion inspection, the Contractor shall provide to the Designer three (3) copies of operating instructions and service manuals, containing the following: 1. Start-up and Shut-down Procedures: Provide a step-by-step write up of all major equipment. When manufacturer's printed start-up, trouble ...”
Conditions Of The Contract ARTICLE.A34-35three (3) copies; three (4) copies
O&MO&MB. Submission of operating instructions shall be done in the ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 35
Spec wording
“B. Submission of operating instructions shall be done in the following manner. 1. Manuals shall be in quadruplicate, and all materials shall be bound into volumes of standard 8½" x 11" hard binders. Large drawings too bulky to be folded into 8½" x 11" shall be separately bound or folded and in envelopes, cross referenced and indexed with the manuals. 2. The manuals shall identify project name, project number, and ...”
Conditions Of The Contract ARTICLE.B35binders; binder
O&MO&MA. Substantial Completion. A Project is substantially complete when construction ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 39-40
Spec wording
“A. Substantial Completion. A Project is substantially complete when construction is essentially complete and work items remaining to be completed can be done without interfering with the Owner's ability to use the Project for its intended purpose. 1. Once the Contractor has reached what they believe is Substantial Completion, the Contractor shall notify the Designer and the Construction Representative of the ...”
Conditions Of The Contract ARTICLE.A39-40–
Test / cert.Test / cert.C. Final Completion. The Project is finally complete when the ...Conditions Of The ContractConditions Of The Contract ARTICLE.C · PDF p. 40
Spec wording
“C. Final Completion. The Project is finally complete when the Certificate of Substantial Completion has been issued and all work items identified therein as incomplete have been completed, and when all administrative items required by the contract have been completed. Final Completion entitles the Contractor to payment of the outstanding balance of the contract amount including all change orders and retainage. ...”
Conditions Of The Contract ARTICLE.C40–

Don't want to chase all of this yourself?

Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.

Email [email protected]

Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.