Closeout checklist: New Pavilion, Missouri Veterans Home (Missouri FMDC, MO)
Every closeout item we found in the public spec book for this job: 102 items across Division 01, 9 trade divisions and the contract conditions, including 29 warranties, 18 tests and certificates and 14 O&M manual items. Each one is tied to its spec section and the PDF page it sits on.
- Owner
- State of Missouri, Office of Administration, Division of Facilities Management, Design and Construction (FMDC)
- Number
- FMDC project U2417-01
- Location
- Mount Vernon, MO
- Bid date
- 2025-10-07
- Public spec book
- Spec book PDF on the Missouri FMDC bid listing
FMDC bid listing - Spec book size
- 398 PDF pages
- Checklist built
- 2026-10-21
Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.
Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.
Email [email protected]Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.
What this job asks for at closeout
All 102 items, by trade
Division 01 General requirements 40 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| O&M | O&MThe Contractor shall submit to the Designer, within ten (10) ...Schedule – Bar Chart01 32 00 3.1.A · PDF p. 71Spec wording“A. The Contractor shall submit to the Designer, within ten (10) working days following the Notice to Proceed, a Progress Schedule including Schedule of Values showing the rate of progress the Contractor agrees to maintain and the order in which he proposed to carry out the various phases of Work. No payments shall be made to the Contractor until the Progress Schedule has been approved by the Owner. 1. The Schedule ...” | 01 32 00 3.1.A | 71 | – |
| Warranty | WarrantyThe Contractor shall submit all required manufacturer's operating instructions, maintenance/service ...Submittals01 33 00 1.8.A · PDF p. 79Spec wording“A. The Contractor shall submit all required manufacturer's operating instructions, maintenance/service manuals, and warranties in accordance with the General Conditions, Article 3.5, and Supplementary Conditions along with this and other Sections of the Contract Documents.” | 01 33 00 1.8.A | 79 | – |
| Warranty | WarrantyContractor shall submit the following information for materials and equipment ...Submittals01 33 00 3.1.A · PDF p. 79-80Spec wording“A. Contractor shall submit the following information for materials and equipment to be provided under this contract. SPEC TITLE CATEGORY SECTION 013200 Schedules Construction Schedule 013200 Schedules Schedule of Values 013200 Schedules List of Subcontractors 013200 Schedules Major Material Suppliers 017800 Written Warranties Warranty 017900 Training Instruction Program Operation / Maintenance Manual 017900 ...” | 01 33 00 3.1.A | 79-80 | – |
| Payment release | Payment releaseIn the Application for Payment that coincides with, or ...Project Closeout01 77 00 1.3.A.1 · PDF p. 98Spec wording“1. In the Application for Payment that coincides with, or first follows, the date Substantial Completion is claimed, show 100 percent completion for the portion of the Work claimed as sub-stantially complete. Include supporting documentation for completion as indicated in these Contract Documents and a statement showing an accounting of changes to the Contract Sum. a. If 100 percent completion cannot be shown, ...” | 01 77 00 1.3.A.1 | 98 | – |
| Closeout step | Closeout stepAdvise Owner of pending insurance change-over requirements.Project Closeout01 77 00 1.3.A.2 · PDF p. 98Spec wording“2. Advise Owner of pending insurance change-over requirements.” | 01 77 00 1.3.A.2 | 98 | – |
| Warranty | WarrantySubmit specific warranties, workmanship bonds, maintenance agreements, final certifications ...Project Closeout01 77 00 1.3.A.3 · PDF p. 98Spec wording“3. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications and similar documents, as required by Contract Documents.” | 01 77 00 1.3.A.3 | 98 | – |
| Spare parts | Spare partsDeliver tools, spare parts, extra stock, and similar items.Project Closeout01 77 00 1.3.A.4 · PDF p. 98Spec wording“4. Deliver tools, spare parts, extra stock, and similar items.” | 01 77 00 1.3.A.4 | 98 | – |
| O&M | O&MComplete start-up testing of systems, and instruction of the ...Project Closeout01 77 00 1.3.A.5 · PDF p. 98Spec wording“5. Complete start-up testing of systems, and instruction of the Owner's operating and maintenance personnel. Discontinue or change over and remove temporary facilities from the site, along with construction tools, mock-ups, and similar elements.” | 01 77 00 1.3.A.5 | 98 | – |
| Closeout step | Closeout stepComplete final clean up requirements, including touch-up painting. Touch-up ...Project Closeout01 77 00 1.3.A.6 · PDF p. 98Spec wording“6. Complete final clean up requirements, including touch-up painting. Touch-up and otherwise repair and restore marred exposed finishes.” | 01 77 00 1.3.A.6 | 98 | – |
| Test / cert. | Test / cert.Inspection ProceduresProject Closeout01 77 00 1.3.B · PDF p. 98Spec wording“B. Inspection Procedures: On receipt of a request for inspection, the Architect will either proceed with inspection or advise the Contractor of unfilled requirements. The Architect will prepare the Certificate of Substantial Completion following inspection, or advise the Contractor/Design-Builder of construction that must be completed or corrected before the certificate will be issued. 1. Upon written statement ...” | 01 77 00 1.3.B | 98 | – |
| Test / cert. | Test / cert.Submit the final payment request with releases and supporting ...Project Closeout01 77 00 1.4.A.1 · PDF p. 99Spec wording“1. Submit the final payment request with releases and supporting documentation not previously submitted and accepted. Include certificates of insurance for products and completed operations where required.” | 01 77 00 1.4.A.1 | 99 | – |
| Closeout step | Closeout stepSubmit an updated final statement, accounting for final additional ...Project Closeout01 77 00 1.4.A.2 · PDF p. 99Spec wording“2. Submit an updated final statement, accounting for final additional changes to the Contract Sum.” | 01 77 00 1.4.A.2 | 99 | – |
| Test / cert. | Test / cert.Submit a certified copy of the Architect's final inspection ...Project Closeout01 77 00 1.4.A.3 · PDF p. 99Spec wording“3. Submit a certified copy of the Architect's final inspection list of items to be completed or corrected, stating that each item has been completed or otherwise resolved for acceptance, and the list has been endorsed and dated by the Architect.” | 01 77 00 1.4.A.3 | 99 | – |
| Payment release | Payment releaseSubmit consent of surety to final payment.Project Closeout01 77 00 1.4.A.4 · PDF p. 99Spec wording“4. Submit consent of surety to final payment.” | 01 77 00 1.4.A.4 | 99 | – |
| Closeout step | Closeout stepSubmit a final liquidated damages settlement statement.Project Closeout01 77 00 1.4.A.5 · PDF p. 99Spec wording“5. Submit a final liquidated damages settlement statement.” | 01 77 00 1.4.A.5 | 99 | – |
| Closeout step | Closeout stepSubmit evidence of final, continuing insurance coverage complying with ...Project Closeout01 77 00 1.4.A.6 · PDF p. 99Spec wording“6. Submit evidence of final, continuing insurance coverage complying with insurance requirements.” | 01 77 00 1.4.A.6 | 99 | – |
| O&M | O&MSubmit record drawings, maintenance manuals, final project photographs, damage ...Project Closeout01 77 00 1.4.A.7 · PDF p. 99Spec wording“7. Submit record drawings, maintenance manuals, final project photographs, damage or settlement survey, property survey, and similar final record information.” | 01 77 00 1.4.A.7 | 99 | – |
| Record docs | Record docsGeneralProject Closeout01 77 00 1.5.A · PDF p. 99Spec wording“A. General: Do not use record documents for construction purposes; protect from deterioration and loss in a secure, fire-resistive location; provide access to record documents for the Architect's reference during normal working hours.” | 01 77 00 1.5.A | 99 | – |
| Record docs | Record docsMark record sets with red erasable pencil; use other ...Project Closeout01 77 00 1.5.B.1 · PDF p. 99Spec wording“1. Mark record sets with red erasable pencil; use other colors to distinguish between variations in separate categories of the Work.” | 01 77 00 1.5.B.1 | 99 | – |
| Record docs | Record docsMark new information that is important to the Owner, ...Project Closeout01 77 00 1.5.B.2 · PDF p. 99Spec wording“2. Mark new information that is important to the Owner, but was not shown on Contract Drawings or Shop Drawings.” | 01 77 00 1.5.B.2 | 99 | – |
| Record docs | Record docsNote related Change Order numbers where applicable.Project Closeout01 77 00 1.5.B.3 · PDF p. 99Spec wording“3. Note related Change Order numbers where applicable.” | 01 77 00 1.5.B.3 | 99 | – |
| Record docs | Record docsOrganize record drawing sheets into manageable sets, bind with ...Project Closeout01 77 00 1.5.B.4 · PDF p. 99Spec wording“4. Organize record drawing sheets into manageable sets, bind with durable paper cover sheets, and print suitable titles, dates and other identification on the cover of each set.” | 01 77 00 1.5.B.4 | 99 | – |
| Record docs | Record docsRecord SpecificationsProject Closeout01 77 00 1.5.C · PDF p. 99Spec wording“C. Record Specifications: Maintain one complete copy of the Project Manual, including addenda, and one copy of other written construction documents such as Change Orders and modifications issued in printed form during construction. Mark these documents to show substantial variations in actual Work performed in comparison with the text of the Specifications and modifications. Give particular attention to ...” | 01 77 00 1.5.C | 99 | one complete copy; one copy |
| Record docs | Record docsRecord Product DataProject Closeout01 77 00 1.5.D · PDF p. 99-100Spec wording“D. Record Product Data: Maintain one copy of each Product Data submittal. Mark these documents to show significant variations in actual Work performed in comparison with information submitted. In-clude variations in products delivered to the site, and from the manufacturer's installation instructions and recommendations. Give particular attention to concealed products and portions of the Work which cannot otherwise ...” | 01 77 00 1.5.D | 99-100 | one copy |
| Record docs | Record docsRecord Sample SubmittedProject Closeout01 77 00 1.5.E · PDF p. 100Spec wording“E. Record Sample Submitted: Immediately prior to the date or dates of Substantial Completion, the Contractor will meet at the site with the Architect and the Owner's personnel to determine which of the submitted Samples that have been maintained during progress of the Work are to be transmitted to the Owner for record purposes. Comply with delivery to the Owner's Sample storage area.” | 01 77 00 1.5.E | 100 | – |
| Record docs | Record docsMiscellaneous Record SubmittalsProject Closeout01 77 00 1.5.F · PDF p. 100Spec wording“F. Miscellaneous Record Submittals: Refer to other Specification Sections for requirements of miscellaneous record-keeping and submittals in connection with actual performance of the Work. Immediately prior to the date or dates of Substantial Completion, complete miscellaneous records and place in good order, properly identified and bound or filed, ready for continued use and reference. Submit to the Architect for ...” | 01 77 00 1.5.F | 100 | – |
| Record docs | Record docsMaintenance ManualsProject Closeout01 77 00 1.5.G · PDF p. 100Spec wording“G. Maintenance Manuals: Organize operating and maintenance data into suitable sets of manageable size. Bind properly indexed data in individual heavy-duty 2-inch, 3-ring vinyl-covered binders, with pocket folders for folded sheet information. Mark appropriate identification on front and spine of each binder. Include the following types of information: 1. Emergency instructions. 2. Spare parts list. 3. Copies of ...” | 01 77 00 1.5.G | 100 | 3-ring; binders; binder |
| Warranty | WarrantyOperating and Maintenance InstructionsProject Closeout01 77 00 3.1.A · PDF p. 100Spec wording“A. Operating and Maintenance Instructions: Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. If installers are not experienced in procedures, provide instruction by manu-facturer's representatives. Include a detailed review of the following items: 1. Maintenance manuals. 2. Record documents. 3. ...” | 01 77 00 3.1.A | 100 | – |
| Spare parts | Spare partsCleaningProject Closeout01 77 00 3.2.B · PDF p. 101Spec wording“B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. Comply with manufacturer's instructions. 1. Complete the following cleaning operations before requesting inspection for Certification of Substantial Completion. a. Remove labels that are not permanent labels. b. ...” | 01 77 00 3.2.B | 101 | – |
| Training | TrainingInstruction ProgramDemonstration And Training01 79 00 1.3.A · PDF p. 102Spec wording“A. Instruction Program: Submit outline of instructional program for demonstration and training, including a list of training modules and a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module.” | 01 79 00 1.3.A | 102 | – |
| Training | TrainingAttendance RecordDemonstration And Training01 79 00 1.3.B · PDF p. 102Spec wording“B. Attendance Record: For each training module, submit list of participants and length of instruction time.” | 01 79 00 1.3.B | 102 | – |
| Training | TrainingEvaluationsDemonstration And Training01 79 00 1.3.C · PDF p. 102Spec wording“C. Evaluations: For each participant and for each training module, submit results and documentation of performance-based test.” | 01 79 00 1.3.C | 102 | – |
| Training | TrainingDemonstration and Training Video RecordingsDemonstration And Training01 79 00 1.4.A · PDF p. 102Spec wording“A. Demonstration and Training Video Recordings: Submit two copies within seven days of end of each training module. 1. Identification: On each copy, provide an applied label with the following information: a. Name of Project. b. Name and address of videographer. c. Name of Architect. d. Name of Construction Manager. e. Name of Contractor. f. Date of video recording. 2. Transcript: Prepared in PDF electronic format. ...” | 01 79 00 1.4.A | 102 | two copies; PDF; electronic format; electronic file |
| Training | TrainingFacilitator QualificationsDemonstration And Training01 79 00 1.5.A · PDF p. 103Spec wording“A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance.” | 01 79 00 1.5.A | 103 | – |
| Training | TrainingPreinstruction ConferenceDemonstration And Training01 79 00 1.5.C · PDF p. 103Spec wording“C. Preinstruction Conference: Conduct conference at Project site to comply with requirements in Section 013100 "Coordination". Review methods and procedures related to demonstration and training including, but not limited to, the following: 1. Inspect and discuss locations and other facilities required for instruction. 2. Review and finalize instruction schedule and verify availability of educational materials, ...” | 01 79 00 1.5.C | 103 | – |
| O&M | O&MCoordinate content of training modules with content of approved emergency, ...Demonstration And Training01 79 00 1.6.C · PDF p. 103Spec wording“C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Architect.” | 01 79 00 1.6.C | 103 | – |
| Warranty | WarrantyTraining ModulesDemonstration And Training01 79 00 2.1.B · PDF p. 103-105Spec wording“B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following as applicable to the system, equipment, or component: 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: a. System, subsystem, and equipment ...” | 01 79 00 2.1.B | 103-105 | – |
| Training | TrainingAssemble educational materials necessary for instruction, including documentation and training ...Demonstration And Training01 79 00 3.1.A · PDF p. 105Spec wording“A. Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a training manual organized in coordination with requirements in Section 007213 "General Conditions".” | 01 79 00 3.1.A | 105 | – |
| Training | TrainingEngage qualified instructors to instruct Owner's personnel to adjust, operate, ...Demonstration And Training01 79 00 3.2.A · PDF p. 105Spec wording“A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. 1. Architect will furnish an instructor to describe basis of system design, operational requirements, criteria, and regulatory requirements. 2. Owner will furnish an instructor to describe Owner's operational philosophy. 3. Owner will furnish Contractor with names ...” | 01 79 00 3.2.A | 105 | – |
| Training | TrainingSchedulingDemonstration And Training01 79 00 3.2.B · PDF p. 105Spec wording“B. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season. 1. Schedule training with Owner with at least seven days' advance notice.” | 01 79 00 3.2.B | 105 | – |
Division 03 Concrete 3 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Warranty | WarrantyDesign MixturesCast-In-Place Concrete03 30 00 2.10.B · PDF p. 106Spec wording“B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.” | 03 30 00 2.10.B | 106 | – |
| Test / cert. | Test / cert.Field quality-control test and inspection reportsCast-In-Place Concrete03 30 00 2.10.G · PDF p. 107Spec wording“G. Field quality-control test and inspection reports.” | 03 30 00 2.10.G | 107 | – |
| Test / cert. | Test / cert.Testing and InspectingCast-In-Place Concrete03 30 00 4.21.A · PDF p. 120Spec wording“A. Testing and Inspecting: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.” | 03 30 00 4.21.A | 120 | – |
Division 04 Masonry 1 item
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Spare parts | Spare partsMaintenance MaterialsMasonry Veneer04 20 01 1.04.E · PDF p. 128Spec wording“E. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. 1. See Section 016000 - Product Requirements, for additional provisions.” | 04 20 01 1.04.E | 128 | – |
Division 05 Metals 3 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Mill test reports for structural steel, including chemical and physical ...Structural Steel Framing05 12 00 1.4.F · PDF p. 143Spec wording“F. Mill test reports for structural steel, including chemical and physical properties.” | 05 12 00 1.4.F | 143 | – |
| Test / cert. | Test / cert.Product Test ReportsStructural Steel Framing05 12 00 1.4.G · PDF p. 143Spec wording“G. Product Test Reports: For the following: 1. Bolts, nuts, and washers including mechanical properties and chemical analysis. 2. Direct-tension indicators. 3. Tension-control, high-strength bolt-nut-washer assemblies. 4. Shop primers. 5. Nonshrink grout.” | 05 12 00 1.4.G | 143 | – |
| Test / cert. | Test / cert.Correct deficiencies in Work that test reports and inspections indicate ...Structural Steel Framing05 12 00 3.5.E · PDF p. 151Spec wording“E. Correct deficiencies in Work that test reports and inspections indicate does not comply with the Contract Documents.” | 05 12 00 3.5.E | 151 | – |
Division 07 Roofing, insulation and waterproofing 9 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Product Test ReportsThermal Insulation07 21 00 1.5.B · PDF p. 177Spec wording“B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency for insulation products.” | 07 21 00 1.5.B | 177 | – |
| Test / cert. | Test / cert.Product Test ReportsFluid-Applied Membrane Air & Moisture Barriers07 27 26 1.5.C · PDF p. 187Spec wording“C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for air barriers.” | 07 27 26 1.5.C | 187 | – |
| Test / cert. | Test / cert.Testing AgencyFluid-Applied Membrane Air & Moisture Barriers07 27 26 3.6.A · PDF p. 193Spec wording“A. Testing Agency: Contractor will engage a qualified testing agency to perform tests and inspections and prepare test reports.” | 07 27 26 3.6.A | 193 | – |
| Warranty | WarrantyWarranty DocumentationAsphalt Shingles07 31 13 1.04.E · PDF p. 195Spec wording“E. Warranty Documentation: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.” | 07 31 13 1.04.E | 195 | – |
| Spare parts | Spare partsMaintenance MaterialsAsphalt Shingles07 31 13 1.04.F · PDF p. 196Spec wording“F. Maintenance Materials: Furnish the following for Owner's use in maintenance of project. 1. See Section 016000 - Product Requirements, for additional provisions. 2. Extra Shingles: 30 sq ft (min. one bundle) of each type and color.” | 07 31 13 1.04.F | 196 | – |
| Warranty | WarrantySee Section 017800 - Closeout Submittals, for additional warranty requirements ...Asphalt Shingles07 31 13 1.07.A · PDF p. 196Spec wording“A. See Section 017800 - Closeout Submittals, for additional warranty requirements.” | 07 31 13 1.07.A | 196 | – |
| Warranty | WarrantyProvide lifetime manufacturer's warranty for coverage against black streaks caused ...Asphalt Shingles07 31 13 1.07.B · PDF p. 196Spec wording“B. Provide lifetime manufacturer's warranty for coverage against black streaks caused by algae.” | 07 31 13 1.07.B | 196 | – |
| Warranty | WarrantyProvide 30 year manufacturer's warranty minimum for full system including ...Asphalt Shingles07 31 13 1.07.C · PDF p. 196Spec wording“C. Provide 30 year manufacturer's warranty minimum for full system including materials and labor to complete the repairs.” | 07 31 13 1.07.C | 196 | – |
| Warranty | WarrantyThe Contractor shall warrant the materials to be free of ...Sheet Metal Soffit Panels07 41 00 1.6.A · PDF p. 202Spec wording“A. The Contractor shall warrant the materials to be free of faults and defects in accordance with the General Conditions, except that the warranty shall be extended by paint manufacturer's standard multi-year warranty. The warranty shall be in writing and shall be signed by the manufacturer.” | 07 41 00 1.6.A | 202 | – |
Division 08 Doors, windows and hardware 11 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Product Test ReportsHollow Metal Doors And Frames08 11 13 1.4.F · PDF p. 221Spec wording“F. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each type of hollow metal door and frame assembly.” | 08 11 13 1.4.F | 221 | – |
| O&M | O&MOperating and Maintenance ManualsDoor Hardware08 71 00 1.3.E · PDF p. 232-233Spec wording“E. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance manuals for each item compiling the complete door hardware and access control system installation in quantity as required in Division 1. The manual to include the name, address, and telephone number of the supplier/integrator providing the installation and the nearest service representatives for each item of equipment included in ...” | 08 71 00 1.3.E | 232-233 | – |
| Warranty | WarrantyWarrantiesDoor Hardware08 71 00 1.3.F · PDF p. 233Spec wording“F. Warranties: Special warranties specified in this Section.” | 08 71 00 1.3.F | 233 | – |
| Warranty | WarrantyGeneral WarrantyDoor Hardware08 71 00 1.7.A · PDF p. 236Spec wording“A. General Warranty: Special warranties specified in this Article will not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and are in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents.” | 08 71 00 1.7.A | 236 | – |
| Warranty | WarrantySpecial WarrantyDoor Hardware08 71 00 1.7.B · PDF p. 236Spec wording“B. Special Warranty: Written warranty, executed by manufacturer, agreeing to repair or replace components of door hardware and access control system hardware that fails in materials or workmanship within the specified general and special warranty periods. Failures include, but are not limited to, the following: 1. Structural failures including excessive deflection, cracking, or breakage. 2. Faulty operation of the ...” | 08 71 00 1.7.B | 236 | – |
| Warranty | WarrantySpecial Warranty Periods (Door Hardware):Door Hardware08 71 00 1.7.C · PDF p. 236Spec wording“C. Special Warranty Periods (Door Hardware): 1. Ten years for mortise locksets. 2. Five years for exit devices. 3. Ten years for manual door closers. 4. Two years for electromechanical door hardware.” | 08 71 00 1.7.C | 236 | – |
| Warranty | WarrantySpecial and Extended Warranty Period (Access Control System)Door Hardware08 71 00 1.7.D · PDF p. 236Spec wording“D. Special and Extended Warranty Period (Access Control System): The entire installed access control system, covering all related parts and labor, shall be warranted for a minimum period of 12 months after final testing and acceptance by the Owner.” | 08 71 00 1.7.D | 236 | – |
| Closeout step | Closeout stepMaintenance Tools and InstructionsDoor Hardware08 71 00 1.8.A · PDF p. 236Spec wording“A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.” | 08 71 00 1.8.A | 236 | – |
| Closeout step | Closeout stepMaintenance ServiceDoor Hardware08 71 00 1.8.B · PDF p. 237Spec wording“B. Maintenance Service: Beginning at Substantial Completion, provide six months' full maintenance by skilled employees of door hardware Installer. Include quarterly preventive maintenance, repair or replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper door hardware operation. Provide parts and supplies as used in the manufacture and installation of original ...” | 08 71 00 1.8.B | 237 | – |
| Test / cert. | Test / cert.Field InspectionDoor Hardware08 71 00 3.4.A · PDF p. 243-244Spec wording“A. Field Inspection: Supplier will perform a final inspection of the installed door hardware and integrated access control system and state in report whether installed work complies with or deviates from requirements, including whether each component representing the opening assembly is properly installed, adjusted, operating and performing to system operational descriptions. 1. Testing Schedule: Test each circuit ...” | 08 71 00 3.4.A | 243-244 | – |
| Training | TrainingEngage a factory-authorized service representative to train Owner's maintenance personnel ...Door Hardware08 71 00 3.7.A · PDF p. 245Spec wording“A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain door hardware and door hardware finishes.” | 08 71 00 3.7.A | 245 | – |
Division 10 Specialties 7 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Warranty | WarrantyWarrantySignage10 14 00 1.4.E · PDF p. 258Spec wording“E. Warranty: See warranty specified in this Section 1.8.” | 10 14 00 1.4.E | 258 | – |
| Warranty | WarrantySpecial WarrantySignage10 14 00 1.8.A · PDF p. 258Spec wording“A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of signs that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Deterioration of metal and polymer finishes beyond normal weathering. b. Deterioration of embedded graphic image colors and sign lamination]. 2. Warranty Period: ...” | 10 14 00 1.8.A | 258 | – |
| O&M | O&MMaintenance DataToilet Accessories10 28 00 1.3.C · PDF p. 262Spec wording“C. Maintenance Data: For toilet and bath accessories to include in maintenance manuals.” | 10 28 00 1.3.C | 262 | – |
| Warranty | WarrantySubmit manufacturer's standard warranty for products specifiedToilet Accessories10 28 00 1.6.1 · PDF p. 263Spec wording“1. Submit manufacturer's standard warranty for products specified.” | 10 28 00 1.6.1 | 263 | – |
| O&M | O&MOperation and Maintenance DataFire Extinguishers10 44 16 1.3.C · PDF p. 267Spec wording“C. Operation and Maintenance Data: For fire extinguishers to include in maintenance manuals.” | 10 44 16 1.3.C | 267 | – |
| Warranty | WarrantyWarrantyFire Extinguishers10 44 16 1.3.D · PDF p. 267Spec wording“D. Warranty: Sample of special warranty.” | 10 44 16 1.3.D | 267 | – |
| Warranty | WarrantySpecial WarrantyFire Extinguishers10 44 16 1.6.A · PDF p. 268Spec wording“A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace fire extinguishers that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Failure of hydrostatic test according to NFPA 10. b. Faulty operation of valves or release levers. 2. Warranty Period: Six years from date of Substantial Completion.” | 10 44 16 1.6.A | 268 | – |
Division 22 Plumbing 11 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Field test reportsPlumbing Specialties22 11 19 1.05.C · PDF p. 284Spec wording“C. Field test reports.” | 22 11 19 1.05.C | 284 | – |
| O&M | O&MMaintenance DataPlumbing Specialties22 11 19 1.05.D · PDF p. 284Spec wording“D. Maintenance Data: For plumbing specialties to include in maintenance manuals. Include the following: 1. Backflow preventers and water regulators. 2. Water filters. 3. Hose stations and hydrants.” | 22 11 19 1.05.D | 284 | – |
| Spare parts | Spare partsFurnish extra materials described below that match products installed and ...Plumbing Specialties22 11 19 1.07.A · PDF p. 285Spec wording“A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Water Filter Cartridges: Equal to 200 percent of amount installed for each type and size indicated.” | 22 11 19 1.07.A | 285 | – |
| Test / cert. | Test / cert.ReportsSanitary Waste And Vent Piping22 13 16 3.08.C · PDF p. 307Spec wording“C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.” | 22 13 16 3.08.C | 307 | – |
| O&M | O&MMaintenance DataElectric, Domestic Water Heater22 33 00 1.03.D · PDF p. 309Spec wording“D. Maintenance Data: For water heaters to include in maintenance manuals specified in Division 1.” | 22 33 00 1.03.D | 309 | – |
| Warranty | WarrantyWarrantiesElectric, Domestic Water Heater22 33 00 1.03.E · PDF p. 309Spec wording“E. Warranties: Special warranties specified in this Section.” | 22 33 00 1.03.E | 309 | – |
| Warranty | WarrantyGeneral WarrantyElectric, Domestic Water Heater22 33 00 1.05.A · PDF p. 310Spec wording“A. General Warranty: Special warranty specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents.” | 22 33 00 1.05.A | 310 | – |
| Warranty | WarrantySpecial WarrantyElectric, Domestic Water Heater22 33 00 1.05.B · PDF p. 310Spec wording“B. Special Warranty: Written warranty, executed by manufacturer agreeing to repair or replace components of water heaters that fail in materials or workmanship within specified warranty period. 1. Failures include heating elements and storage tanks. 2. Warranty Period: From date of Substantial Completion: a. Heating Elements: Five years. b. Storage Tanks: 10 years.” | 22 33 00 1.05.B | 310 | – |
| Training | TrainingEngage a factory-authorized service representative to train Owner's maintenance personnel ...Electric, Domestic Water Heater22 33 00 2.08.A · PDF p. 314Spec wording“A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain water heaters. 1. Train Owner's maintenance personnel on procedures for starting and stopping, troubleshooting, servicing, and maintaining equipment. 2. Review data in maintenance manuals. Refer to Division 1 Section "Closeout Procedures." 3. Review data in maintenance manuals. Refer to ...” | 22 33 00 2.08.A | 314 | – |
| O&M | O&MMaintenance DataPlumbing Fixtures22 42 00 1.04.B · PDF p. 315Spec wording“B. Maintenance Data: For plumbing fixtures to include in maintenance manuals specified in Division 1.” | 22 42 00 1.04.B | 315 | – |
| Spare parts | Spare partsFurnish extra materials described below that match products installed and ...Plumbing Fixtures22 42 00 1.07.A · PDF p. 317-318Spec wording“A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Faucet Cartridges and O-Rings: Equal to 5 percent of amount of each type and size installed. 2. Faucet, Flow-Control Fittings: Equal to 10 percent of amount of each type and size installed. 3. Flushometer Valve, Repair Kits: Equal to ...” | 22 42 00 1.07.A | 317-318 | – |
Division 26 Electrical 1 item
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Field Test ReportsBasic Electrical Materials And Methods26 00 00 1.4.C · PDF p. 322Spec wording“C. Field Test Reports: Indicate and interpret test results for compliance with performance requirements.” | 26 00 00 1.4.C | 322 | – |
Division 31 Earthwork 5 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.Test ReportsTermite Control31 31 16 1.5.D · PDF p. 360Spec wording“D. Test Reports: Indicate regulatory agency approval reports when required.” | 31 31 16 1.5.D | 360 | – |
| O&M | O&MMaintenance DataTermite Control31 31 16 1.5.G · PDF p. 360Spec wording“G. Maintenance Data: Indicate re-treatment schedule .” | 31 31 16 1.5.G | 360 | – |
| Warranty | WarrantyWarrantyTermite Control31 31 16 1.5.H · PDF p. 360Spec wording“H. Warranty: Submit warranty and ensure that forms have been completed in Owner's name.” | 31 31 16 1.5.H | 360 | – |
| Warranty | WarrantySee Section 017800 - Closeout Submittals, for additional warranty requirements ...Termite Control31 31 16 1.7.A · PDF p. 361Spec wording“A. See Section 017800 - Closeout Submittals, for additional warranty requirements.” | 31 31 16 1.7.A | 361 | – |
| Warranty | WarrantyFurnish written warranty certifying that applied soil termiticide treatment will ...Termite Control31 31 16 1.7.B · PDF p. 361Spec wording“B. Furnish written warranty certifying that applied soil termiticide treatment will prevent infestation of subterranean termites and, that if subterranean termite activity is discovered during warranty period, Contractor will re-treat soil and repair or replace damage caused by termite infestation. 1. Provide a warranty for a period of 5 years from date of treatment. Warranty shall be signed by the Applicator. 2. ...” | 31 31 16 1.7.B | 361 | – |
Front end Contract conditions (final payment, releases, retainage) 11 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 21Spec wording“DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION FINAL RECEIPT OF PAYMENT AND RELEASE KNOW ALL MEN BY THESE PRESENT THAT: hereinafter called "Subcontractor" who heretofore entered into an agreement with hereinafter called "Contractor", for the performance of work and/or furnishing of material for the construction of the project entitled (PROJECT TITLE, PROJECT LOCATION, AND PROJECT NUMBER) at (ADDRESS OF ...” | Conditions Of The Contract (Find Heading On The Cited Page) | 21 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 32Spec wording“The Contractor shall update a complete set of the construction drawings, shop drawings and schedules of all work monthly by marking changes, and at the completion of their work (prior to submission of request for final payment) note all changes and turn the set over to the Construction Representative.” | Conditions Of The Contract (Find Heading On The Cited Page) | 32 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 33Spec wording“Prior to the final payment, furnish to the Designer three (4) copies of parts catalogs for each piece of equipment furnished by him/her on the project with the components identified by number for replacement ordering.” | Conditions Of The Contract (Find Heading On The Cited Page) | 33 | three (4) copies |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 39Spec wording“The Contractor shall be allowed to include in the Application and Certification for Payment, one hundred (100%) of the value, subject to retainage, of major equipment and material stored off the site if all of the following conditions are met: 1.” | Conditions Of The Contract (Find Heading On The Cited Page) | 39 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 40Spec wording“The final payment shall not become due until the Contractor delivers to the Construction Representative: a) A complete file of releases, on the standard form included in the contract documents as "Final Receipt of Payment and Release Form", from subcontractors and material suppliers evidencing payment in full for services, equipment and materials, as the case may require, if the Owner approves, or a consent from ...” | Conditions Of The Contract (Find Heading On The Cited Page) | 40 | – |
| Warranty | WarrantyA. General Guaranty 1. Neither the final certificate of payment ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 32Spec wording“A. General Guaranty 1. Neither the final certificate of payment nor any provision in the contract documents nor partial use or occupancy of the premises by the Owner shall constitute an acceptance of work not done in accordance with contract requirements. 2. The Contractor or surety shall remedy any defects in the work and pay for any damage to property resulting there from which shall appear within a period of one ...” | Conditions Of The Contract ARTICLE.A | 32 | – |
| Warranty | WarrantyB. Extended Warranty Manufacturer's certificates of warranty shall be obtained ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 32Spec wording“B. Extended Warranty Manufacturer's certificates of warranty shall be obtained for all major equipment. Warranty shall be obtained for at least one year. Where a longer period is offered at no additional cost or called for in the specific equipment specifications, the longer period shall govern.” | Conditions Of The Contract ARTICLE.B | 32 | – |
| O&M | O&MA. Immediately after equipment submittals are approved and no later ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 32-33Spec wording“A. Immediately after equipment submittals are approved and no later than ten (10) working days prior to the substantial completion inspection, the Contractor shall provide to the Designer three (3) copies of operating instructions and service manuals, containing the following: 1. Start-up and Shut-down Procedures: Provide a step-by-step write up of all major equipment. When manufacturer's printed start-up, trouble ...” | Conditions Of The Contract ARTICLE.A | 32-33 | three (3) copies; three (4) copies |
| O&M | O&MB. Submission of operating instructions shall be done in the ...Conditions Of The ContractConditions Of The Contract ARTICLE.B · PDF p. 33Spec wording“B. Submission of operating instructions shall be done in the following manner. 1. Manuals shall be in quadruplicate, and all materials shall be bound into volumes of standard 8½" x 11" hard binders. Large drawings too bulky to be folded into 8½" x 11" shall be separately bound or folded and in envelopes, cross referenced and indexed with the manuals. 2. The manuals shall identify project name, project number, and ...” | Conditions Of The Contract ARTICLE.B | 33 | binders; binder |
| O&M | O&MA. Substantial Completion. A Project is substantially complete when construction ...Conditions Of The ContractConditions Of The Contract ARTICLE.A · PDF p. 37-38Spec wording“A. Substantial Completion. A Project is substantially complete when construction is essentially complete and work items remaining to be completed can be done without interfering with the Owner's ability to use the Project for its intended purpose. 1. Once the Contractor has reached what they believe is Substantial Completion, the Contractor shall notify the Designer and the Construction Representative of the ...” | Conditions Of The Contract ARTICLE.A | 37-38 | – |
| Test / cert. | Test / cert.C. Final Completion. The Project is finally complete when the ...Conditions Of The ContractConditions Of The Contract ARTICLE.C · PDF p. 38Spec wording“C. Final Completion. The Project is finally complete when the Certificate of Substantial Completion has been issued and all work items identified therein as incomplete have been completed, and when all administrative items required by the contract have been completed. Final Completion entitles the Contractor to payment of the outstanding balance of the contract amount including all change orders and retainage. ...” | Conditions Of The Contract ARTICLE.C | 38 | – |
Don't want to chase all of this yourself?
Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.
Email [email protected]Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.