Closeout checklist: Early Joyner Drive / Infrastructure Package for Moore Building (Western Carolina University, NC)
Every closeout item we found in the public spec book for this job: 108 items across Division 01, 4 trade divisions and the contract conditions, including 30 record document items, 23 warranties and 20 tests and certificates. Each one is tied to its spec section and the PDF page it sits on.
- Owner
- Western Carolina University (State of North Carolina)
- Number
- SCO 22-24697-01B
- Location
- Cullowhee, NC
- Public spec book
- Project manual on the WCU website
- Spec book size
- 442 PDF pages
- Checklist built
- 2026-10-21
Prints the full checklist with a tick box, spec section and page for every item. In the print window, choose "Save as PDF" to keep a copy or send it to your PM.
Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.
Email [email protected]Built automatically from the posted spec book; check it against your own copy and addenda. Item types are sorted automatically; the spec section and page are what count.
What this job asks for at closeout
All 108 items, by trade
Division 01 General requirements 56 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Record docs | Record docsDigital PhotographsPhotographic Documentation01 32 33 1.2.B · PDF p. 134Spec wording“B. Digital Photographs: Submit image files within three days of taking photographs. 1. Digital Camera: Minimum sensor resolution of 8 megapixels. 2. Format: Minimum 1600 by 1200 pixels, 400 dpi minimum, in unaltered original files, with same aspect ratio as the sensor, uncropped, date- and time- stamped, in folder named by date of photograph, accompanied by key plan file. 3. Identification: Provide the following ...” | 01 32 33 1.2.B | 134 | electronic files; CD-ROM; electronic media |
| Warranty | WarrantyCoordinationSubmittal Procedures01 33 00 1.4.B · PDF p. 139Spec wording“B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. Where products or systems of one contractor abut, connect to or otherwise come in contact with those of another contractor, the GC shall coordinate ...” | 01 33 00 1.4.B | 139 | – |
| Test / cert. | Test / cert.Additional CopiesSubmittal Procedures01 33 00 1.4.K · PDF p. 141Spec wording“K. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes non-compliance with provisions in the Contract Documents, initial submittal may serve as final submittal. 1. Architect will send required submittals to concurrent reviewer (Commissioning Agent) and will return submittals with comments from both A/E and CxA.” | 01 33 00 1.4.K | 141 | – |
| Record docs | Record docsProduct Schedule or ListSubmittal Procedures01 33 00 2.1.E · PDF p. 145Spec wording“E. Product Schedule or List: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: 1. Type of product. Include unique identifier for each product. 2. Number and name of room or space. 3. Location within room or space. 4. Submit product schedule or list, ...” | 01 33 00 2.1.E | 145 | electronically; PDF |
| Record docs | Record docsSubcontract ListSubmittal Procedures01 33 00 2.1.F · PDF p. 145Spec wording“F. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form: 1. Name, address, and telephone number of entity performing subcontract or supplying products. 2. Number and title of related Specification Section(s) covered ...” | 01 33 00 2.1.F | 145 | three copies; two copies |
| Test / cert. | Test / cert.When the following are specified in individual sections, submit them ...Submittal Procedures01 33 00 2.2.A · PDF p. 145-146Spec wording“A. When the following are specified in individual sections, submit them for information only: 1. Design data 2. Certificates 3. Test Reports 4. Inspection Reports 5. Manufacturer's instructions 6. Manufacturer's field reports 7. Other types indicated. 8. Installer qualifications.” | 01 33 00 2.2.A | 145-146 | – |
| Test / cert. | Test / cert.Manufacturer's Field ServicesQuality Requirements01 40 00 1.6.C · PDF p. 152Spec wording“C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 1 Section "Submittal Procedures."” | 01 40 00 1.6.C | 152 | – |
| Test / cert. | Test / cert.Substitution Requests After Award of Contract (If Allowed by the ...Product Requirements01 60 00 1.3.C · PDF p. 162Spec wording“C. Substitution Requests After Award of Contract (If Allowed by the Architect): Submit electronic copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Substitution Request Form: Use Construction Specifications Institute (CSI) 13.1A Form . 2. Documentation: Show compliance ...” | 01 60 00 1.3.C | 162 | electronic copies |
| Warranty | WarrantyWarranties specified in other Sections shall be in addition to, ...Product Requirements01 60 00 1.6.A · PDF p. 164Spec wording“A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve GC, sub-contractors or suppliers of obligations under requirements of the Contract Documents. 1. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a ...” | 01 60 00 1.6.A | 164 | – |
| Warranty | WarrantySpecial WarrantiesProduct Requirements01 60 00 1.6.B · PDF p. 164Spec wording“B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution. 1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed. 2. Specified Form: When specified forms are included with the Specifications, prepare a written document using appropriate form properly ...” | 01 60 00 1.6.B | 164 | – |
| Warranty | WarrantySubmittal TimeProduct Requirements01 60 00 1.6.C · PDF p. 164Spec wording“C. Submittal Time: Comply with requirements in Division 1 Section "Closeout Procedures."” | 01 60 00 1.6.C | 164 | – |
| Warranty | WarrantyWarrantiesCutting And Patching01 73 29 1.6.A · PDF p. 176Spec wording“A. Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void warranties.” | 01 73 29 1.6.A | 176 | – |
| Warranty | WarrantySubmit specific warranties, workmanship bonds, maintenance service agreements, final certifications, ...Closeout Procedures01 77 00 1.2.B · PDF p. 185Spec wording“B. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.” | 01 77 00 1.2.B | 185 | – |
| Test / cert. | Test / cert.Obtain and submit releases permitting Owner unrestricted use of the ...Closeout Procedures01 77 00 1.2.C · PDF p. 185Spec wording“C. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.” | 01 77 00 1.2.C | 185 | – |
| O&M | O&MPrepare and submit Project As-built Documents, operation and maintenance manuals, ...Closeout Procedures01 77 00 1.2.D · PDF p. 185Spec wording“D. Prepare and submit Project As-built Documents, operation and maintenance manuals, Final Completion construction photographs, damage or settlement surveys, property surveys, and similar final record information.” | 01 77 00 1.2.D | 185 | – |
| Spare parts | Spare partsDeliver tools, spare parts, extra materials, and similar items to ...Closeout Procedures01 77 00 1.2.E · PDF p. 185Spec wording“E. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.” | 01 77 00 1.2.E | 185 | – |
| Spare parts | Spare partsMake final changeover of permanent locks and deliver keys to ...Closeout Procedures01 77 00 1.2.F · PDF p. 185Spec wording“F. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.” | 01 77 00 1.2.F | 185 | – |
| Test / cert. | Test / cert.Complete startup testing of systemsCloseout Procedures01 77 00 1.2.G · PDF p. 185Spec wording“G. Complete startup testing of systems.” | 01 77 00 1.2.G | 185 | – |
| Test / cert. | Test / cert.Submit test/adjustment/balance recordsCloseout Procedures01 77 00 1.2.H · PDF p. 185Spec wording“H. Submit test/adjustment/balance records. 1. All building control work must be complete prior to performing Test and Balance. 2. Control work and Test and Balance must be complete prior to start of commissioning.” | 01 77 00 1.2.H | 185 | – |
| Closeout step | Closeout stepSubmit changeover information related to Owner's occupancy, use, operation, and ...Closeout Procedures01 77 00 1.2.K · PDF p. 186Spec wording“K. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.” | 01 77 00 1.2.K | 186 | – |
| Closeout step | Closeout stepComplete final cleaning requirements, including touchup paintingCloseout Procedures01 77 00 1.2.L · PDF p. 186Spec wording“L. Complete final cleaning requirements, including touchup painting.” | 01 77 00 1.2.L | 186 | – |
| Payment release | Payment releaseSubmit a final Application for Payment according to Division 01 ...Closeout Procedures01 77 00 1.2.N · PDF p. 186Spec wording“N. Submit a final Application for Payment according to Division 01 Section "Price and Payment Procedures."” | 01 77 00 1.2.N | 186 | – |
| Test / cert. | Test / cert.Submit certified copy of Architect's Pre-Final inspection list of items ...Closeout Procedures01 77 00 1.2.O · PDF p. 186Spec wording“O. Submit certified copy of Architect's Pre-Final inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.” | 01 77 00 1.2.O | 186 | – |
| Closeout step | Closeout stepSubmit evidence of final, continuing insurance coverage complying with insurance ...Closeout Procedures01 77 00 1.2.P · PDF p. 186Spec wording“P. Submit evidence of final, continuing insurance coverage complying with insurance requirements.” | 01 77 00 1.2.P | 186 | – |
| Warranty | WarrantySubmit pest-control final inspection report and warrantyCloseout Procedures01 77 00 1.2.Q · PDF p. 186Spec wording“Q. Submit pest-control final inspection report and warranty. 1. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems. Submit demonstration and training videotapes.” | 01 77 00 1.2.Q | 186 | – |
| Test / cert. | Test / cert.GeneralCloseout Procedures01 77 00 1.3.A · PDF p. 186-187Spec wording“A. General: Prior to requesting any Designer/Owner required inspection, GC shall perform their own inspection. 1. GC shall prepare punch list of items for subcontractor correction and distribute such list to all subs for corrective action. 2. GC shall submit completed and signed off punch lists to Architect along with written request for required designer/Owner inspections. GC shall initial each punch list item ...” | 01 77 00 1.3.A | 186-187 | – |
| Test / cert. | Test / cert.Required InspectionsCloseout Procedures01 77 00 1.3.B · PDF p. 187Spec wording“B. Required Inspections: All inspections listed below shall follow the inspection procedures as indicated above: 1. Above-ceiling Inspection: Owner and Designers shall perform inspections of all above-ceiling installations prior to close up of ceilings. a. GC shall provide ladders, lifts and all other equipment necessary to provide access to above-ceiling areas for inspection purposes. b. Above-ceiling areas that ...” | 01 77 00 1.3.B | 187 | – |
| Closeout step | Closeout stepStair and Ramp SurveyCloseout Procedures01 77 00 1.4.A · PDF p. 188Spec wording“A. Stair and Ramp Survey: Provide a final survey, by a surveyor or engineer registered in the state of North Carolina, for all installed stairs and ramps, to verify compliance of stair width, stair tread depth and riser height, ramp slope, railing heights and other requirements of the NC State Building Code, NC State Accessibility Code and conformance with the Drawings.” | 01 77 00 1.4.A | 188 | – |
| Spare parts | Spare partsAttic Stock TurnoverCloseout Procedures01 77 00 1.4.C · PDF p. 188Spec wording“C. Attic Stock Turnover: GC shall collect and inventory all attic stock and extra materials for turn over to the Owner. Compile list of inventory including all quantities on the Attic Stock Summary form included at the end of this Specification section. Submit summary form to Architect and schedule Architect's review and sign-off confirmation of all attic stock. Coordinate final delivery logistics with Owner.” | 01 77 00 1.4.C | 188 | – |
| Closeout step | Closeout stepOrganize list of spaces in sequential order, starting with ...Closeout Procedures01 77 00 1.5.A.1 · PDF p. 188Spec wording“1. Organize list of spaces in sequential order, starting with exterior areas first and proceeding from lowest floor to highest floor.” | 01 77 00 1.5.A.1 | 188 | – |
| Closeout step | Closeout stepOrganize items applying to each space by major element, ...Closeout Procedures01 77 00 1.5.A.2 · PDF p. 188Spec wording“2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.” | 01 77 00 1.5.A.2 | 188 | – |
| Closeout step | Closeout stepInclude the following information at the top of each ...Closeout Procedures01 77 00 1.5.A.3 · PDF p. 188Spec wording“3. Include the following information at the top of each page: a. Project name. b. Date. c. Name of Architect. d. Name of GC. e. Page number.” | 01 77 00 1.5.A.3 | 188 | – |
| Warranty | WarrantyAll guarantees shall include labor and products and shall be ...Closeout Procedures01 77 00 1.7.A · PDF p. 188Spec wording“A. All guarantees shall include labor and products and shall be designed by the Manufacturer or Subcontractor, as the case may be, and countersigned by the GC. All guarantees shall be in addition to, and not in lieu of, all legislated guarantees. All guarantees shall be addressed to the Owner and delivered to the Designer upon completion of the Project and before or with the submission of Request for Final Payment.” | 01 77 00 1.7.A | 188 | – |
| Warranty | WarrantyIn the event that the Owner considers it impractical, because ...Closeout Procedures01 77 00 1.7.B · PDF p. 188-189Spec wording“B. In the event that the Owner considers it impractical, because of unsuitable test conditions, or some other factors, to execute simultaneous final acceptance of all equipment, portions of the installation may be certified by the Designer for the Owner's final acceptance when that portion of the system is complete and ready for operation. The decision to accept only portions of the Project rests entirely with the ...” | 01 77 00 1.7.B | 188-189 | – |
| Warranty | WarrantyThe General Contractor shall also guarantee for a period of ...Closeout Procedures01 77 00 1.7.C · PDF p. 189Spec wording“C. The General Contractor shall also guarantee for a period of 24 months, unless a longer guarantee time is specifically called for in the Specification Sections, that the work covered by this Contract will be watertight and leakproof at every point and in every area affected by this Contract, except where leaks can be attributed to damage by forces beyond his control. He shall, immediately upon notification by the ...” | 01 77 00 1.7.C | 189 | – |
| Warranty | WarrantyThe General Contractor signing a Contract with the Owner, shall ...Closeout Procedures01 77 00 1.7.D · PDF p. 189Spec wording“D. The General Contractor signing a Contract with the Owner, shall obtain and forward to the Owner any and all guarantees issued by the manufacturers specifically for certain products and systems covered under his Contract. In the event the manufacturer does not have a suitable "preprinted" warranty form" to fully cover the guarantee requirements as set forth in the Specification Section, he shall produce a ...” | 01 77 00 1.7.D | 189 | – |
| Warranty | WarrantyIn addition to the foregoing stipulations, the GC shall comply ...Closeout Procedures01 77 00 1.7.E · PDF p. 189Spec wording“E. In addition to the foregoing stipulations, the GC shall comply with all other guarantees referred to in any portion of the Contract Documents, the more stringent requirements governing.” | 01 77 00 1.7.E | 189 | – |
| Warranty | WarrantyIf for any reason the General Contractor cannot guarantee any ...Closeout Procedures01 77 00 1.7.F · PDF p. 189Spec wording“F. If for any reason the General Contractor cannot guarantee any part of his work using materials or construction methods which have been specified or indicated he shall notify the Designer in typewritten form before Contracts are signed, giving reasons together with the names of products and data or substitution he can guarantee. Should the GC fail to so notify the Designer prior to the Signing of Contract, he ...” | 01 77 00 1.7.F | 189 | – |
| Closeout step | Closeout stepGeneralCloseout Procedures01 77 00 3.1.A · PDF p. 189Spec wording“A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.” | 01 77 00 3.1.A | 189 | – |
| Spare parts | Spare partsCleaningCloseout Procedures01 77 00 3.1.B · PDF p. 190Spec wording“B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions. 1. Complete the following cleaning operations before requesting Pre-final inspection for entire Project or for a portion of Project: a. Clean Project site, yard, and ...” | 01 77 00 3.1.B | 190 | – |
| Test / cert. | Test / cert.Pest ControlCloseout Procedures01 77 00 3.1.C · PDF p. 190-191Spec wording“C. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid Project of rodents, insects, and other pests. Prepare a report.” | 01 77 00 3.1.C | 190-191 | – |
| Record docs | Record docsAs-built DrawingsProject Record Documents01 78 39 1.2.A · PDF p. 192Spec wording“A. As-built Drawings: Comply with the following: 1. Number of Copies: Submit one complete hard-copy set of marked-up as-built drawings, along with digital scan of prints, to be incorporated as Record Drawings by the Designer.” | 01 78 39 1.2.A | 192 | hard-copy; digital scan |
| Closeout step | Closeout stepRecord Site Utility SurveyProject Record Documents01 78 39 1.2.B · PDF p. 192Spec wording“B. Record Site Utility Survey: Submit digital files through the architect and engineers of record for review of compliance with these specification requirements.” | 01 78 39 1.2.B | 192 | digital files |
| Record docs | Record docsRecord SpecificationsProject Record Documents01 78 39 1.2.C · PDF p. 192Spec wording“C. Record Specifications: Submit one copy of Project's Specifications, including addenda and contract modifications.” | 01 78 39 1.2.C | 192 | one copy |
| O&M | O&MRecord Product DataProject Record Documents01 78 39 1.2.D · PDF p. 192Spec wording“D. Record Product Data: Submit one copy of each Product Data submittal. 1. Where Record Product Data is required as part of operation and maintenance manuals, submit marked-up Product Data as an insert in manual instead of submittal as Record Product Data.” | 01 78 39 1.2.D | 192 | one copy |
| Record docs | Record docsProvide detailed 3D BIM Revit model developed from laser scanning ...Project Record Documents01 78 39 2.1.1 · PDF p. 193Spec wording“1. Provide detailed 3D BIM Revit model developed from laser scanning of all interior spaces within the building after demolition. BIM Revit model shall meet Level of Development (LOD) 350. The delivered model shall be used for design and construction BIM coordination.” | 01 78 39 2.1.1 | 193 | Revit |
| Record docs | Record docsPreparation: Mark As-built prints to show the actual installation ...Project Record Documents01 78 39 2.1.B.1 · PDF p. 193Spec wording“1. Preparation: Mark As-built prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints. a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record ...” | 01 78 39 2.1.B.1 | 193 | – |
| Record docs | Record docsContent: Types of items requiring marking include, but are ...Project Record Documents01 78 39 2.1.B.2 · PDF p. 193Spec wording“2. Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Locations and depths of underground utilities. d. Revisions to routing of piping and conduits. e. Revisions to electrical circuitry. f. Actual equipment locations. g. Duct size and routing. h. Locations of concealed internal utilities. i. ...” | 01 78 39 2.1.B.2 | 193 | – |
| Record docs | Record docsMark the Contract Drawings completely and accurately.Project Record Documents01 78 39 2.1.B.3 · PDF p. 193Spec wording“3. Mark the Contract Drawings completely and accurately. a. Use of loose sheets, separate binders, booklets, etc. as supplementary information for record prints will not be acceptable.” | 01 78 39 2.1.B.3 | 193 | binders |
| Record docs | Record docsMark as-built set with erasable, red-colored pencil. Use other ...Project Record Documents01 78 39 2.1.B.4 · PDF p. 193Spec wording“4. Mark as-built set with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.” | 01 78 39 2.1.B.4 | 193 | – |
| Record docs | Record docsMark important additional information that was either shown schematically ...Project Record Documents01 78 39 2.1.B.5 · PDF p. 193Spec wording“5. Mark important additional information that was either shown schematically or omitted from original Drawings.” | 01 78 39 2.1.B.5 | 193 | – |
| Record docs | Record docsNote Field Work Order numbers, alternate numbers, RFI numbers, ...Project Record Documents01 78 39 2.1.B.6 · PDF p. 193Spec wording“6. Note Field Work Order numbers, alternate numbers, RFI numbers, Change Order numbers, and similar identification, where applicable.” | 01 78 39 2.1.B.6 | 193 | – |
| Record docs | Record docsFormatProject Record Documents01 78 39 2.1.C · PDF p. 193-194Spec wording“C. Format: Identify and date each As-built Drawing; include the designation "PROJECT AS-BUILT PRINT" in a prominent location. 1. As-built Drawings: Organize Marked-up as-built drawings into sets similar to the organization of the contract drawings. Bind each set with durable paper cover sheets. Include identification on cover sheets. 2. Record Digital Scans: Once as-built drawings are finalized, have sets scanned ...” | 01 78 39 2.1.C | 193-194 | Digital Scans; PDF; DVD; Flash drive |
| Closeout step | Closeout stepAssemble miscellaneous records required by other Specification Sections for miscellaneous ...Project Record Documents01 78 39 2.2.A · PDF p. 194Spec wording“A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.” | 01 78 39 2.2.A | 194 | – |
| Record docs | Record docsRecordingProject Record Documents01 78 39 3.1.A · PDF p. 194Spec wording“A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project.” | 01 78 39 3.1.A | 194 | one copy |
| Record docs | Record docsMaintenance of Record Documents and SamplesProject Record Documents01 78 39 3.1.B · PDF p. 194Spec wording“B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Architect's reference during ...” | 01 78 39 3.1.B | 194 | – |
Division 03 Concrete 1 item
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.The Contractor shall submit for review a design mix for ...Concrete Formwork03 11 00 3.08.B · PDF p. 210Spec wording“B. The Contractor shall submit for review a design mix for each class of concrete proposed for use. An approved testing laboratory shall prepare the mix. Compressive strength of at least four (4) specimens of the design mix shall indicate 15% higher than 28 days strengths specified. During the work, the Contractor shall make 3 test cylinders for each 50 cubic yards, or fraction thereof, of concrete placed each day. ...” | 03 11 00 3.08.B | 210 | – |
Division 26 Electrical 30 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Training | TrainingThe Contractor shall perform and complete work in accordance with ...General Electrical Requirements26 00 00 1.13.A · PDF p. 237Spec wording“A. The Contractor shall perform and complete work in accordance with the Contract Documents without fault or defect of any kind. In the absence of more specific directives, the work shall: 1. Be completed in a first-class manner. 2. Be placed in a thoroughly clean and unmarred condition. 3. Be checked out in a step-by-step manner to ascertain that fastenings, controls, parts, safety devices, operating devices and ...” | 26 00 00 1.13.A | 237 | – |
| O&M | O&MFurnish for review, three hard bound copies of complete written ...General Electrical Requirements26 00 00 1.14.A · PDF p. 237Spec wording“A. Furnish for review, three hard bound copies of complete written instructions for the operation, care and maintenance of each piece of equipment and/or system. Include recommended frequency of inspection, cleaning, oiling, greasing, and adjustment and other action as may be required in accordance with manufacturer's recommendations. Material shall include manufacturer's brochures, catalog cuts, parts lists, ...” | 26 00 00 1.14.A | 237 | – |
| Warranty | WarrantyThe contractor and equipment manufacturers shall jointly guarantee all wiring ...General Electrical Requirements26 00 00 1.21.A · PDF p. 239Spec wording“A. The contractor and equipment manufacturers shall jointly guarantee all wiring and equipment to be free of defects in workmanship and material for a period of one year from the date of final acceptance, unless otherwise noted.” | 26 00 00 1.21.A | 239 | – |
| Record docs | Record docsMaintain at job site, one copy of record documents and ...General Electrical Requirements26 00 00 1.22.A · PDF p. 239Spec wording“A. Maintain at job site, one copy of record documents and samples as required under the General Conditions of the Contract, including Drawings, Specifications, Addenda and Bulletins, Change Orders, Shop Drawings, Product Data and Samples, Field Orders, Field Test Records and Maintenance and Operating Manuals.” | 26 00 00 1.22.A | 239 | one copy |
| Record docs | Record docsProvide files and racks for storage of documents. Maintain documents ...General Electrical Requirements26 00 00 1.22.B · PDF p. 239Spec wording“B. Provide files and racks for storage of documents. Maintain documents in a clean, dry legible condition and in good order. Do not use record documents for construction purposes. Make record documents and samples available during normal working hours for inspection.” | 26 00 00 1.22.B | 239 | – |
| Record docs | Record docsRecording:General Electrical Requirements26 00 00 1.22.C · PDF p. 239Spec wording“C. Recording: 1. Label each document Project Record in neat large letters and provide final completion date. 2. Record information concurrently with construction progress. 3. Do not conceal any work until required information is recorded.” | 26 00 00 1.22.C | 239 | – |
| Record docs | Record docsRecord Drawings - legibly mark to record actual construction as ...General Electrical Requirements26 00 00 1.22.D · PDF p. 239Spec wording“D. Record Drawings - legibly mark to record actual construction as follows: 1. A print set (blue-line or black-line) of contract drawing or shop drawing mark-ups of actual installations which vary substantially from the work as originally shown. Mark whichever drawing is most capable of showing "field" condition fully and accurately; however, where shop drawing are used for mark-up, record a cross reference at ...” | 26 00 00 1.22.D | 239 | – |
| Record docs | Record docsRecord Specifications and Addenda, Bulletins, Requests for Information (RFI's) and ...General Electrical Requirements26 00 00 1.22.E · PDF p. 239Spec wording“E. Record Specifications and Addenda, Bulletins, Requests for Information (RFI's) and Construction Clarification Sketches (CSK's) - legibly mark each Section to record: 1. Any variations in actual work in comparison with text of specifications and modifications as issued. Give particular attention to substitutions, selection of options, and similar information work where it is concealed or cannot otherwise be ...” | 26 00 00 1.22.E | 239 | – |
| Record docs | Record docsProduct DataGeneral Electrical Requirements26 00 00 1.22.F · PDF p. 239Spec wording“F. Product Data: Maintain one copy of each product data submittal, and mark-up significant variation in actual work in comparison with submitted information. 1. Include both variations in product as delivered to site, and variations from manufacturer's instruction and recommendations for installation. 2. Give particular attention to concealed products and portions of the work which cannot otherwise be readily ...” | 26 00 00 1.22.F | 239 | one copy |
| Record docs | Record docsRecord Drawings Submittal at Project CompletionGeneral Electrical Requirements26 00 00 1.22.G · PDF p. 240Spec wording“G. Record Drawings Submittal at Project Completion: Organize record drawing sheets into manageable sets, bind with durable paper cover sheets and print suitable titles, dates and other identification on cover of each set. Transfer marking required by previous paragraphs to set of reproducible transparencies. Submit complete set of transparencies to the Design Professional and two sets of blue-line prints.” | 26 00 00 1.22.G | 240 | two sets |
| Record docs | Record docsProduct Data Submittal at Project CompletionGeneral Electrical Requirements26 00 00 1.22.H · PDF p. 240Spec wording“H. Product Data Submittal at Project Completion: Submit three sets of marked-up product data submittals for record purposes that include resolution of all review notes and field revisions.” | 26 00 00 1.22.H | 240 | three sets |
| Record docs | Record docsRecord Sample SubmittalsGeneral Electrical Requirements26 00 00 1.22.I · PDF p. 240Spec wording“I. Record Sample Submittals: Immediately prior to date of substantial completion Design Professional (and including Owner's personnel where desired) will meet with Contractor at site and will determine which if any of submitted samples maintained by Contractor during progress of work are to be transmitted to Owner for record purposes. Comply with Design Professionals instruction for packaging, identification ...” | 26 00 00 1.22.I | 240 | – |
| Record docs | Record docsMiscellaneous Record SubmittalsGeneral Electrical Requirements26 00 00 1.22.J · PDF p. 240Spec wording“J. Miscellaneous Record Submittals: Refer to other sections of these specification for requirements of miscellaneous record-keeping and submittals in connection with actual performance of the work. Immediately prior to date(s) of substantial completion, complete miscellaneous records and place in good order properly identified and bound or filed, ready for continued use and reference. Submit to Architect/Engineer ...” | 26 00 00 1.22.J | 240 | – |
| Record docs | Record docsMaintenance ManualsGeneral Electrical Requirements26 00 00 1.22.K · PDF p. 240Spec wording“K. Maintenance Manuals: Organize maintenance-and-operating manual information into three suitable sets of manageable size and bind into individual binders properly identified and indexed (thumb-tabbed). Include: emergency instructions; spare parts listing; warranties; wiring diagrams; recommended "turn-around" cycles; inspection and cleaning procedures; recommended frequency of testing, adjustment and any other ...” | 26 00 00 1.22.K | 240 | binders; binder |
| Record docs | Record docsUpon completion of the project, the Contractor shall submit to ...Electrical General Provisions26 00 10 1.4.D · PDF p. 242Spec wording“D. Upon completion of the project, the Contractor shall submit to the Engineer a set of accurately marked-up plans indicating all changes encountered during the construction. These drawings shall remain on the project for it's duration and shall be updated at the time changes are made. Final payment will be contingent on receipt of these "Record Drawings."” | 26 00 10 1.4.D | 242 | – |
| Test / cert. | Test / cert.Product Test ReportsUnderground Ducts And Pull Boxes26 00 51 1.3.E · PDF p. 247Spec wording“E. Product Test Reports: Indicate compliance of Pullboxes with ASTM C 857 and ASTM C 858, based on factory inspection.” | 26 00 51 1.3.E | 247 | – |
| Record docs | Record docsSubmit under provisions of Section 26 00 10. Accurately record ...Luminaires26 05 10 1.5.A · PDF p. 257Spec wording“A. Submit under provisions of Section 26 00 10. Accurately record actual locations of each luminaire.” | 26 05 10 1.5.A | 257 | – |
| O&M | O&MSubmit under provisions of Section 26 00 10Luminaires26 05 10 1.6.A · PDF p. 257Spec wording“A. Submit under provisions of Section 26 00 10.” | 26 05 10 1.6.A | 257 | – |
| O&M | O&MMaintenance DataLuminaires26 05 10 1.6.B · PDF p. 257Spec wording“B. Maintenance Data: Include replacement parts list.” | 26 05 10 1.6.B | 257 | – |
| Spare parts | Spare partsFurnish under provisions of Section 26 00 10Luminaires26 05 10 1.9.A · PDF p. 258Spec wording“A. Furnish under provisions of Section 26 00 10.” | 26 05 10 1.9.A | 258 | – |
| Spare parts | Spare partsProvide two of each type of ballast and driverLuminaires26 05 10 1.9.B · PDF p. 258Spec wording“B. Provide two of each type of ballast and driver.” | 26 05 10 1.9.B | 258 | – |
| Warranty | WarrantyMinimum of five 10 years non-prorated warranty is required with ...Luminaires26 05 10 1.10.A · PDF p. 258Spec wording“A. Minimum of five 10 years non-prorated warranty is required with each electronic ballast and LED luminaire including all components.” | 26 05 10 1.10.A | 258 | – |
| Warranty | WarrantyLED arrays in the product(s) will be considered defective in ...Luminaires26 05 10 1.10.B · PDF p. 258Spec wording“B. LED arrays in the product(s) will be considered defective in material or workmanship if a total of 5% or more of the individual light-emitting diodes in the product(s) fail to illuminate during normal operation after installation.” | 26 05 10 1.10.B | 258 | – |
| Training | TrainingProvide systems demonstration under provisions of Section 26 00 10Luminaires26 05 10 3.6.A · PDF p. 261Spec wording“A. Provide systems demonstration under provisions of Section 26 00 10.” | 26 05 10 3.6.A | 261 | – |
| Training | TrainingProvide demonstration of luminaire operation with lighting controls elements such ...Luminaires26 05 10 3.6.B · PDF p. 261Spec wording“B. Provide demonstration of luminaire operation with lighting controls elements such as dimmers.” | 26 05 10 3.6.B | 261 | – |
| Training | TrainingProvide 3rd party video-recorded not to exceed 2-hours for training ...Luminaires26 05 10 3.7.A · PDF p. 261Spec wording“A. Provide 3rd party video-recorded not to exceed 2-hours for training of owner representatives covering components and operation of the lighting controls system.” | 26 05 10 3.7.A | 261 | – |
| Record docs | Record docsSubmit under provisions of Section 260010Conduit26 01 11 1.6.A · PDF p. 263Spec wording“A. Submit under provisions of Section 260010.” | 26 01 11 1.6.A | 263 | – |
| Record docs | Record docsAccurately record actual routing of conduits larger than 1½" inchConduit26 01 11 1.6.B · PDF p. 263Spec wording“B. Accurately record actual routing of conduits larger than 1½" inch.” | 26 01 11 1.6.B | 263 | – |
| Test / cert. | Test / cert.The contractor shall send a letter to the Engineer certifying ...Building Wire And Cable26 01 23 3.7.D · PDF p. 271Spec wording“D. The contractor shall send a letter to the Engineer certifying that the above test has been done and tabulating the cable insulation tester readings for each panel. This shall be done at least four (4) days prior to final inspection.” | 26 01 23 3.7.D | 271 | – |
| Test / cert. | Test / cert.Test ReportsGrounding And Bonding26 01 70 1.7.C · PDF p. 272Spec wording“C. Test Reports: Indicate overall resistance to ground and resistance of each electrode.” | 26 01 70 1.7.C | 272 | – |
Division 32 Paving and site improvements 7 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Test / cert. | Test / cert.The Contractor shall submit for review a design mix for ...Concrete Curb And Gutter32 16 13 3.02.B · PDF p. 361Spec wording“B. The Contractor shall submit for review a design mix for each class of concrete proposed for use. An approved testing laboratory shall prepare the mix. Compressive strength of at least four (4) specimens of the design mix shall indicate 15% higher than 28-day strengths specified. During the work, the Contractor shall make 3 test cylinders for each 30 cubic yards, or fraction thereof, of concrete placed each day. ...” | 32 16 13 3.02.B | 361 | – |
| Warranty | WarrantyTHERMOPLASTIC PAVING MARKINGS The Thermoplastic pavement marking materials and glass ...Pavement Markings32 17 23 3.02.A · PDF p. 370Spec wording“A. THERMOPLASTIC PAVING MARKINGS The Thermoplastic pavement marking materials and glass beads furnished under this contract shall assume the manufacturer's warranty for these materials and shall be guaranteed by the supplier against failure due to traffic oil degradation. The contractor shall assume all costs arising from the use of patented materials, equipment, devices or processes used on or incorporated in the ...” | 32 17 23 3.02.A | 370 | – |
| Test / cert. | Test / cert.Product Test ReportsChain Link Fences And Gates32 31 13 1.4.G · PDF p. 372Spec wording“G. Product Test Reports: For framing strength according to ASTM F 1043.” | 32 31 13 1.4.G | 372 | – |
| Test / cert. | Test / cert.Field quality-control reportsChain Link Fences And Gates32 31 13 1.4.H · PDF p. 372Spec wording“H. Field quality-control reports.” | 32 31 13 1.4.H | 372 | – |
| O&M | O&MOperation and Maintenance DataChain Link Fences And Gates32 31 13 1.4.I · PDF p. 372Spec wording“I. Operation and Maintenance Data: For the following to include in emergency, operation, and maintenance manuals: 1. Polymer finishes. 2. Gate hardware. 3. Gate operator.” | 32 31 13 1.4.I | 372 | – |
| Warranty | WarrantyWarrantyChain Link Fences And Gates32 31 13 1.4.J · PDF p. 372Spec wording“J. Warranty: Sample of special warranty.” | 32 31 13 1.4.J | 372 | – |
| Training | TrainingEngage a factory-authorized service representative to train Owner's personnel to ...Chain Link Fences And Gates32 31 13 3.5.A · PDF p. 378Spec wording“A. Engage a factory-authorized service representative to train Owner's personnel to adjust, operate, and maintain chain-link fences and gates.” | 32 31 13 3.5.A | 378 | – |
Division 33 Utilities 4 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Warranty | WarrantyAll materials shall be guaranteed to be free from defects ...Water Pipe And Appurtenances33 11 00 1.04 · PDF p. 405Spec wording“All materials shall be guaranteed to be free from defects in materials and workmanship for a period of one (1) year after final acceptance by the Owner.” | 33 11 00 1.04 | 405 | – |
| Warranty | WarrantyAll materials shall be guaranteed to be free from defects ...Water Valves And Appurtenances33 12 00 1.04 · PDF p. 420Spec wording“All materials shall be guaranteed to be free from defects in materials and workmanship for a period of one (1) year after final acceptance by the Owner.” | 33 12 00 1.04 | 420 | – |
| Warranty | WarrantyAll pipe and materials shall be warranted for a period ...Drainage Materials33 41 00 1.04 · PDF p. 434Spec wording“All pipe and materials shall be warranted for a period of one (1) year following installation and acceptance by the Owner.” | 33 41 00 1.04 | 434 | – |
| Warranty | WarrantyAll materials and equipment shall be warranted to be free ...Minor Drainage Structures33 49 00 1.05 · PDF p. 440Spec wording“All materials and equipment shall be warranted to be free from defects in workmanship and materials for one (1) year after final acceptance.” | 33 49 00 1.05 | 440 | – |
Front end Contract conditions (final payment, releases, retainage) 10 items
| Type | Item | Spec section | PDF page | Copies / format |
|---|---|---|---|---|
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 30Spec wording“Should final payment to any prime contractor beyond the date such contracts have been certified to be completed by the designer or architect, accepted by the owner, or occupied by the owner and used for the purposes for which the project was constructed, be delayed by more than 45 days, said prime contractor shall be paid interest, beginning on the 46th day, at the rate of one percent (1%) per month or fraction ...” | Conditions Of The Contract (Find Heading On The Cited Page) | 30 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 39Spec wording“ARTICLE 27 - CORRECTION OF WORK AFTER FINAL PAYMENT See Article 35, Performance Bond and Payment Bond, and Article 42, Guarantee.” | Conditions Of The Contract (Find Heading On The Cited Page) | 39 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 42Spec wording“Prior to submitting request for final payment to the designer for approval, the contractor shall fully comply with all requirements specified in the" project closeout" section of the specifications.” | Conditions Of The Contract (Find Heading On The Cited Page) | 42 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 42Spec wording“The designer will not authorize final payment until the work under contract has been certified by designer, certificates of compliance issued, and the contractor has complied with the closeout requirements.” | Conditions Of The Contract (Find Heading On The Cited Page) | 42 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 44Spec wording“ARTICLE 36 - CONTRACTOR'S AFFIDAVIT The final payment of retained amount due the contractor on account of the contract shall not become due until the contractor has furnished to the owner through the designer an affidavit signed, sworn and notarized to the effect that all payments for materials, services or subcontracted work in connection with his contract have been satisfied, and that no claims or Page 37” | Conditions Of The Contract (Find Heading On The Cited Page) | 44 | – |
| Payment release | Payment releaseFinal payment / retainage conditionConditions Of The Contract (Find Heading On The Cited Page)Conditions Of The Contract (Find Heading On The Cited Page) · PDF p. 84Spec wording“Upon submission by the First Party of evidence satisfactory to the Second Party that all payrolls, material bills and other costs incurred by the First Party in connection with the construction of the work have been paid in full, final payment on account of this agreement shall be made within thirty (30) days after the completion by the First Party of all work covered by this agreement and the acceptance of such ...” | Conditions Of The Contract (Find Heading On The Cited Page) | 84 | – |
| Test / cert. | Test / cert.a. Upon notification from the contractor(s) that the project is ...Conditions Of The ContractConditions Of The Contract ARTICLE · PDF p. 37-38Spec wording“a. Upon notification from the contractor(s) that the project is complete and ready for inspection, the designer shall make a Designer final inspection to verify that the project is complete and ready for SCO final inspection. Prior to SCO final inspection, the contractor(s) shall complete all items requiring corrective measures noted at the Designer Page 30 final inspection. The designer shall schedule a SCO final ...” | Conditions Of The Contract ARTICLE | 37-38 | – |
| Payment release | Payment releaseSee Article 35, Performance Bond and Payment Bond, and Article ...Conditions Of The ContractConditions Of The Contract ARTICLE · PDF p. 39Spec wording“See Article 35, Performance Bond and Payment Bond, and Article 42, Guarantee. Neither the final certificate, final payment, occupancy of the premises by the owner, nor any provision of the contract, nor any other act or instrument of the owner, nor the designer, shall relieve the contractor from responsibility for negligence, or faulty material or workmanship, or failure to comply with the drawings and ...” | Conditions Of The Contract ARTICLE | 39 | – |
| Test / cert. | Test / cert.a. Within five (5) days from receipt of request for ...Conditions Of The ContractConditions Of The Contract ARTICLE · PDF p. 41-42Spec wording“a. Within five (5) days from receipt of request for payment from the contractor, the designer shall issue and forward to the owner a certificate for payment. This certificate shall indicate the amount requested or as approved by the designer. If the certificate is not approved by the designer, he shall state in writing to the contractor and the owner his reasons for withholding payment. b. No certificate issued or ...” | Conditions Of The Contract ARTICLE | 41-42 | – |
| Warranty | Warrantya. The contractor shall unconditionally guarantee materials and workmanship against ...Conditions Of The ContractConditions Of The Contract ARTICLE · PDF p. 47-48Spec wording“a. The contractor shall unconditionally guarantee materials and workmanship against patent defects arising from faulty materials, faulty workmanship or negligence for a period of twelve (12) months following the date of final acceptance of the work or beneficial occupancy and shall replace such defective materials or workmanship without cost to the owner. Page 40 b. Where items of equipment or material carry a ...” | Conditions Of The Contract ARTICLE | 47-48 | – |
Don't want to chase all of this yourself?
Want us to collect all of this and hand you one binder to sign? $1,950 per job for a trade package, whole job from $2,500, paid on delivery.
Email [email protected]Your job isn't in the library? Send us the project name or solicitation number and we'll build its checklist free.